3 Open Violations 0 unresolved · 3 paperwork only▸
ECB03/01/2002WORK DOES NOT CONFORM TO APPROVED PLANS APPLICATION TYPE: NEW BUILDING #200648193 NON-CONFORM WORK=FULL KITCHEN WITH GAS STOVE AND KITCHEN SINK. INSTALLED AT CELLAR. REMEDY: FILE PLANS OBTAIN PERMIT OR IF FEASINothing owed — awaiting certificate of correction
ECB03/12/2001FAILURE TO PROVIDE APPROVED PLANS AT JOB SITE AT TIME OF INSPECTION REMEDY: PROVIDE APPROVED PLANS STOP ALL WORKNothing owed — awaiting certificate of correction
ECB03/12/2001FAILURE TOPOST CONSTRACTORS SIGN REMDY: PROVIDE CONTRACTORS SIGNNothing owed — awaiting certificate of correction
Two family brick · 5,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.