HPD07/08/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 1 SQUARE FOOT, AT SOUTH WINDOW SASH IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 14429764 ISSUED 08-JUL-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
HPD07/08/2021§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
HPD07/08/2021§ 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING.
HPD04/23/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING APPROX 10 SQ.FT AND EAST WALL APPROX 5 SQ FT IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
ECB04/22/2021FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.NOTE:ATOI,OBSERVED GROUNDFL IN DISREPAIR,UNEVEN,W/BROKEN TILES@ENTRY CORRIDOR@THIS LOCATION.REPAIR &/OR REPLACE.$3K due
HPD04/19/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX. 20 SQ.FT. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, APARTMENT AT NORTH
HPD04/13/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX. 2 SQ. FEET AT NORTH WALL APPRX. 5 SQ. FEET AND WINDOW STOOL APPRX. 2 SQ. FEET IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 14228220 ISSUED 13-APR-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
HPD04/13/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPRX. 5 SQ. FEET AT NORTH WALL APPRX. 5 SQ. FEET AT EAST WALL APPRX. 5 SQ. FEET AND SOUTH WALL APPRX. 5 SQ. FEET IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD03/08/2021§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL APPROX. 10 SQ.FT. IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT APT2, 2nd STORY, APARTMENT AT NORTH
HPD07/09/2019§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (APPROX 12 SQ FT) ON CEILING, NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD09/25/2018§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
DOB08/16/1993V-DOB VIOLATION - ACTIVE
Primarily 2 family with 1 store or office · Owner of record: IPARK STRUCTURE LLC · 2,000 sf lot · 1.8 FAR built · Flood zone X