← Back
BuildNYC
One story - permanent living quarter
3418 ELY AVENUE
BRONX · BIN 2065509
💬 Discuss this project
1935Year Built
1Stories
A2Building Class
R4AZoning
876 sfGross Floor Area
1Units
One story - permanent living quarter · 2,375 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRestore fire damaged house1 filing · 4 docs
Floor 1Restore fire damaged house1 filing · 4 docs
Sub-BasementRestore fire damaged house1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Philip Toscano Architects109/18/2026
Building Lifecycle
All (10)Filed (1)Special Inspection (9)
09/18/2026
Filed — Alteration
FIRE DAMAGE REPAIR OF ALL REAR EXTG. ONE DWELLING INCLUDING BSMT., 1ST FL. AND NEW ROOF. REPLACE ALL WINDOWS. ALL REPAIRS AS PER PLANS.NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
X01421593-I1
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/04/2026
Special inspection requirement — Energy Code Compliance Inspections
09/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
09/04/2026
Special inspection requirement — Fenestration areas
09/04/2026
Special inspection requirement — Insulation placement and R values
09/04/2026
Special inspection requirement — Interior lighting power
09/04/2026
Special inspection requirement — Fenestration air leakage
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/04/2026Fire-Resistant Penetrations and Joints—special
09/04/2026Structural Stability – Alterations of existing buildings—special
09/04/2026Energy Code Compliance Inspections—progress
09/04/2026Fire-Resistance Rated Construction—progress
09/04/2026Fenestration and door U-factor and product ratings—energy_progress
09/04/2026Fenestration areas—energy_progress
09/04/2026Insulation placement and R values—energy_progress
09/04/2026Interior lighting power—energy_progress
09/04/2026Fenestration air leakage—energy_progress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
10/04/2026X01421593-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
10/04/2026X01421593-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
10/04/2026X01421593-I1Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
10/04/2026X01421593-I1Open ↗