← Back
Elevator apt, fireproof with stores
Stuy Town Peter Cooper Village
342 1 AVENUE · BIN 1083692
💬 Discuss this project
1947Year Built
15Stories
D6Building Class
R7-2Zoning
3,122,165 sfGross Floor Area
2,498Units
LL97 CoveredRent Stabilized35 Open Violations 34 unresolved · 1 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: BPP PCV OWNER LLC · 828,650 sf lot · 3.77 FAR built · Flood zone AE
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 11 docs
Bulkhead1p · 1 filing · 11 docs
Floor 121p · 1 filing · 5 docs
Floor 11
Floor 10
Floor 91p · 1 filing · 6 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 5 docs
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C/O BLACKSTONE PROPERTY A303/22/2026
METROPOLITAN LIFE INC103/22/2026
BPP OWNERS LLC203/22/2026
EMPIRE CORE GROUP LLC203/21/2026
COMPASS ROCK REAL ESTATE103/21/2026
METROPL LIFE INSURN CO103/21/2026
ROCK GROUP NY CORP103/21/2026
ROSE ASSOCIATES INC MANAGER803/21/2026
METROPOLITAN LIFE INSURANCE303/21/2026
STUYTOWN PROPERTY SERVICES1303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2015$1.3B—PCVST-DIL LLC → BPP PCV OWNER LLC$431/sf building
06/03/2014$1.1B—— → —$356/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SANDEEP GUNNALA ENGINEERING PLLC208/19/2026
HC PEC204/14/2026
BUILDING STUDIO ARCHITECTS811/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RIZZO GROUP903/21/2026
SANDEEP GUNNALA ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPER G CONSTRUCTION CORPGeneral Contractor1007/08/2026
AP PLUMBING & HVAC LLCPlumbing407/08/2026
PJP INSTALLERS INCGeneral Contractor409/15/2026
ASPESI, MARCELOElectrical303/21/2026
COSTELLO, HElectrical303/21/2026
IRON WORKERS LOCAL 40Electrical303/21/2026
NORTHEAST PLBG & HTG CORPPlumbing207/08/2026
KAMA CONSTRUCTION CORPGeneral Contractor107/08/2026
DAVID KLEEMANElectrical103/21/2026
INNOVATIVE HEATING SOLUTIPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANDEEP GUNNALA ENGINEERI8482508/19/2026
BUILDING STUDIO ARCHITECT592811/20/2023
Building Lifecycle
All (129)Filed (15)Permit Issued (18)Signed Off (6)Facade (FISP) (15)Violation (49)Inspection (5)Objection (3)Special Inspection (18)
09/16/2026
Signed off — Alteration
Filing for limited facade repairs at 510 East 23rd Street, as shown on drawings filed herewith. No change in use, egress or occupancy.
M01353831-I1
09/14/2026
Permit issued — Sidewalk Shed
M01366422-I1-SH
08/19/2026
Filed — Alteration
Filing for limited facade repairs at 510 East 23rd Street, as shown on drawings filed herewith. No change in use, egress or occupancy.
M01353831-P1
08/18/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
08/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sandeep Gunnala
08/18/2026
Special inspection requirement — Final
Sandeep Gunnala
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sandeep Gunnala
08/18/2026
Special inspection requirement — Masonry
Sandeep Gunnala
08/13/2026
Objection raised — Other
08/06/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW MASONRY FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01440681-I1
06/30/2026
Violation issued (ECB, open)
Construction
06/23/2026
Violation issued (HPD, closed)
A
06/23/2026
Violation issued (HPD, closed)
A
06/23/2026
Violation issued (HPD, closed)
C
06/23/2026
Violation issued (HPD, open)
C
06/17/2026
Permit issued — Sidewalk Shed
M01366422-I1-SH
06/11/2026
Violation issued (HPD, open)
B
06/11/2026
Violation issued (HPD, open)
B
06/04/2026
Permit issued — Suspended Scaffold
M01370035-I1-SC
05/27/2026
Special inspection requirement — Post-installed Anchors
Sandeep Gunnala
05/27/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Sandeep Gunnala
05/20/2026
Objection raised — Other
05/20/2026
Objection resolved — Addressed
05/15/2026
Violation issued (ECB, closed)
Construction
05/11/2026
Permit issued — General Construction
M01353831-I1-GC
05/04/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW MASONRY FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01370035-P1
04/14/2026
Filed — Alteration
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01384136-I1
04/14/2026
Permit issued — Protection and Mechanical Methods
M01384136-I1-PMM
03/27/2026
Permit issued — Sidewalk Shed
M01366422-I1-SH
03/16/2026
Permit issued — Suspended Scaffold
M01370035-I1-SC
03/11/2026
Filed — Alteration
THE SCOPE OF WORK INCLUDES THE INSTALLATION OF OUTRIGGERS AS SHOWN IN PROVIDED DRAWINGS FOR LOCAL LAW MASONRY FACADE REPAIR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01370035-I1
03/11/2026
Filed — Alteration
INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01366422-I1
03/03/2026
Filed — Alteration
Filing for limited facade repairs at 510 East 23rd Street, as shown on drawings filed herewith. No change in use, egress or occupancy.
M01353831-I1
02/11/2026
Cycle 9 facade report submitted
02/11/2026
Cycle 9 facade report signed — SWARMP
02/10/2026
Cycle 9 facade inspection completed
04/17/2024
Signed off — Alteration
Plumbing modifications for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. OT filed separately under M00960779-I1. No change in use, egress or occupancy.
M00960798-I1
04/17/2024
Signed off — Alteration
General construction for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. PL filed separately under M00960798-I1. No change in use, egress or occupancy.
M00960779-I1
02/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2024
Permit issued — Plumbing
M00960798-I1-PL
02/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/17/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/21/2023
Permit issued — Plumbing
M00960798-I1-PL
11/29/2023
Permit issued — General Construction
M00960779-I1-GC
11/20/2023
Filed — Alteration
Plumbing modifications for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. OT filed separately under M00960779-I1. No change in use, egress or occupancy.
M00960798-I1
11/20/2023
Filed — Alteration
General construction for interior renovation of Apartment 9H on the 10th floor as shown on drawings filed herewith. PL filed separately under M00960798-I1. No change in use, egress or occupancy.
M00960779-I1
11/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Field
11/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
John Field
11/09/2023
Special inspection requirement — Energy Code Compliance Inspections
John Field
11/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
John Field
04/11/2023
Signed off — Alteration
M08052616-I1
02/10/2023
Cycle 9 facade report submitted
02/10/2023
Cycle 9 facade report signed — SWARMP
02/08/2023
Cycle 9 facade inspection completed
01/12/2023
Permit issued — Plumbing
M08052617-I1-PL
12/22/2022
Permit issued — General Construction
M08052616-I1-GC
12/16/2022
Filed — Alteration
M08052616-I1
12/16/2022
Filed — Alteration
M08052617-I1
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC09/14/2026
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC06/17/2026
DOB NOWSuspended ScaffoldPermit IssuedCONSTRUCTED CORP06/04/2026
DOB NOWGeneral ConstructionSigned-offKAMA CONSTRUCTION CORP05/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedPJP INSTALLERS INC04/14/2026
DOB NOWSidewalk ShedPermit IssuedPJP INSTALLERS INC03/27/2026
DOB NOWSuspended ScaffoldPermit IssuedTC ZONE INC03/16/2026
DOB NOWPlumbingSigned-offNORTHEAST PLBG & HTG CORP02/13/2024
DOB NOWPlumbingSigned-offNORTHEAST PLBG & HTG CORP12/21/2023
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP11/29/2023
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG01/12/2023
DOB NOWGeneral ConstructionSigned-offSUPER G CONSTRUCTION CORP12/22/2022
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG05/25/2022
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG04/07/2022
DOB NOWMechanical SystemsSigned-offSUPER G CONSTRUCTION CORP03/05/2020
DOB NOWPlumbingPermit IssuedMITIE PLUMBING & HTG CORP03/05/2020
DOB NOWMechanical SystemsSigned-offSUPER G CONSTRUCTION CORP02/04/2020
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG01/23/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/26/2025
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/27/2024
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/26/2023
BISOTISSUEDSUPER G CONSTRUCTION CORP01/18/2023
BISOTISSUEDCRRE TOWN AND VILLAGE LLC11/03/2022
BISOTISSUEDSUPER G CONSTRUCTION CORP05/27/2022
BISOTISSUEDCRRE TOWN AND VILLAGE LLC10/08/2021
BISOTISSUEDCRRE TOWN AND VILLAGE LLC10/06/2021
BISOTISSUEDCRRE TOWN AND VILLAGE LLC07/06/2021
BISOTISSUEDSUPER G CONSTRUCTION CORP02/19/2021
BISOTISSUEDCRRE TOWN AND VILLAGE LLC01/13/2021
BISOTISSUEDSUPER G CONSTRUCTION CORP10/21/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC09/25/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC06/15/2020
BISOTISSUEDCRRE TOWN AND VILLAGE LLC02/26/2020
BISOTISSUEDDELLAPEAK INTERIORS LLC02/26/2020
BISOTISSUEDSUPER G CONSTRUCTION CORP01/07/2020
BISMHISSUEDCVM CONSTRUCTION CORP07/09/2019
BISOTISSUEDCVM CONSTRUCTION CORP07/01/2019
BISPLISSUEDPACE PLUMBING CORP06/20/2019
BISOTISSUEDDELLAPEAK INTERIORS LLC06/05/2019
BISPLISSUEDPACE PLUMBING CORP06/03/2019
+ 28 more permits on file
2 projects · most recent 10/27/2020
Gas Water/Sanitary
FiledStatusContractorScope
10/27/2020Permit IssuedCROSSFIELD PLBG.&HTG.CORPGas, Water/Sanitary
03/02/2020Permit IssuedCROSSFIELD PLBG.&HTG.CORPGas, Water/Sanitary
25 projects · most recent 09/15/2026
General Wiring Lighting
FiledStatusContractorScope
09/15/2026Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
03/23/2026Permit IssuedGRX EURO ELECTRIC CORP—
03/03/2026Permit IssuedWCK ELECTRIC CORP.—
05/06/2024Permit IssuedELECTRICAL SOLUTIONS LLCGeneral Wiring
02/16/2024CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
01/24/2024CompleteA.S.K. ELECTRICAL CORPGeneral Wiring, Lighting
01/03/2024Permit IssuedELECTRICAL SOLUTIONS LLCGeneral Wiring
09/06/2023CompleteATLAS-ACON ELEC. SERVICE—
08/28/2023CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
08/17/2023CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
06/13/2023CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
02/10/2023CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
05/09/2022Permit IssuedVERTEX ELECTRIC CORP.General Wiring
04/14/2022CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
04/04/2022CompleteELECTRICAL SOLUTIONS LLCGeneral Wiring
1 project · most recent 03/11/2026
Sidewalk Shed
FiledStatusContractorScope
03/11/2026Permit IssuedPJP INSTALLERS INCSidewalk Shed
2 projects · most recent 08/06/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/06/2026——Suspended Scaffold (SC)
05/04/2026Permit IssuedCONSTRUCTED CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/17/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/18/2026Post-installed AnchorsSandeep Gunnalaspecial
08/18/2026Structural Stability – Alterations of existing buildingsSandeep Gunnalaspecial
08/18/2026FinalSandeep Gunnalaprogress
08/18/2026Tenant Protection Plan ComplianceSandeep Gunnalaspecial
08/18/2026MasonrySandeep Gunnalaspecial
05/27/2026Post-installed AnchorsSandeep Gunnalaspecial
05/27/2026Alternative Materials - OTCR Buildings Bulletin NumberSandeep Gunnalaspecial
11/20/2023Fire-Resistant Penetrations and JointsJohn Fieldspecial
11/09/2023HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
11/09/2023Energy Code Compliance InspectionsJohn Fieldprogress
11/09/2023Tenant Protection Plan ComplianceJohn Fieldspecial
12/15/2022Tenant Protection Plan ComplianceJohn Fieldspecial
12/15/2022Energy Code Compliance InspectionsJohn Fieldprogress
12/15/2022HVAC-R and service water piping design and insulationJohn Fieldenergy_progress
10/22/2020Fire-Resistant Penetrations and JointsJohn Fieldspecial
01/21/2020Fire-Resistant Penetrations and JointsJohn Fieldspecial
12/18/2019Mechanical SystemsJohn Fieldspecial
12/18/2019FinalJohn Fieldprogress
▾Documents — 635 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch11
09/06/2026M01384136-I1Request digital key ↗
09/01/2026M08052616-I1Request digital key ↗
09/01/2026M08052617-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00280765-I1Request digital key ↗
09/05/2026M00295866-I1Request digital key ↗
09/04/2026M00409232-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00284444-I1Request digital key ↗
▸Applications & Permits125
▸BISPLAN / WORK APPROVAL APPLICATION67
01/20/2023123808004Open ↗
02/24/2022102901870Open ↗
09/10/2021102901870Open ↗
Showing 3 of 67 on file for this type
▸BISWORK PERMIT APPLICATION58
01/19/2023123808004Open ↗
01/13/2021123843671Open ↗
10/21/2020140965917Open ↗
Showing 3 of 58 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE DESIGN CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLOOD ZONE COMPLIANCE1
10/06/2022123843671Open ↗
▸Seals & Professional Certifications154
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION62
03/04/2020123834869Open ↗
03/02/2020123843671Open ↗
02/25/2020123455992Open ↗
Showing 3 of 62 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST27
03/02/2020123843671Open ↗
12/24/2019123726094Open ↗
06/05/2019123897872Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
10/20/2020140965917Open ↗
03/02/2020123843671Open ↗
12/24/2019123726094Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/06/2026M01384136-I1Open ↗
09/05/2026M00280765-I1Open ↗
09/01/2026M08052616-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/22/2026M00960798-I1Open ↗
08/31/2026M00295866-I1Open ↗
08/31/2026M00409232-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/22/2026M00960798-I1Open ↗
09/22/2026M00960798-I1Open ↗
08/30/2026M01353831-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
10/20/2020140965917Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
10/20/2020140965917Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment18
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
07/02/2019122979223Open ↗
06/05/2019123897872Open ↗
05/16/2019123808004Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes14
03/02/2020123843671Open ↗
12/24/2019123726094Open ↗
06/05/2019123897872Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWTenant Protection Plan4
08/13/2026M00284444-I1Open ↗
08/13/2026M00295866-I1Open ↗
08/13/2026M00280765-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos47
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
10/20/2020140965917Open ↗
03/02/2020123843671Open ↗
01/07/2020123726094Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/05/2026M00280765-I1Open ↗
09/01/2026M08052616-I1Open ↗
08/28/2026M00960779-I1Open ↗
Showing 3 of 10 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance48
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
03/04/2020123834869Open ↗
03/04/2020123834869Open ↗
03/02/2020123843671Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
01/26/2021123726094Open ↗
03/04/2020123834869Open ↗
02/25/2020123455992Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/26/2021123726094Open ↗
10/21/2020140965917Open ↗
10/20/2020140965917Open ↗
Showing 3 of 4 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
10/20/2020140965917Open ↗
Showing 1 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
01/26/2021123726094Open ↗
10/21/2020140965917Open ↗
10/20/2020140965917Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸Approvals, Objections & Sign-offs51
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
01/13/2025140965917Open ↗
10/07/2022123843671Open ↗
01/26/2021123726094Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSUPERSEDING LETTER7
01/19/2023123808004Open ↗
01/13/2021123843671Open ↗
02/27/2020123726094Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL2
09/07/2023140965917Open ↗
10/06/2022123843671Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership75
▸BISCOST AFFIDAVIT61
04/06/2022102901870Open ↗
01/26/2021123726094Open ↗
10/20/2020140965917Open ↗
Showing 3 of 61 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/10/2025140965917Open ↗
10/06/2022123843671Open ↗
▸Filing & Intake Forms64
▸BISEFILING COVER SHEET29
03/02/2020123843671Open ↗
12/24/2019123726094Open ↗
06/05/2019123897872Open ↗
Showing 3 of 29 on file for this type
▸BISBOROUGH INTAKE FORM19
03/04/2020123834869Open ↗
02/25/2020123455992Open ↗
11/14/2019123360772Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION12
12/02/2020123726094Open ↗
03/02/2020123843671Open ↗
12/24/2019123726094Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
10/20/2020140965917Open ↗
Showing 1 of 4 on file for this type
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/16/2026M01440681-I1Open ↗
08/15/2026M01370035-P1Open ↗
08/13/2026M01370035-I1Open ↗
▸DOB NOWCalculations3
08/16/2026M01440681-I1Open ↗
08/15/2026M01370035-P1Open ↗
08/13/2026M01370035-I1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type