← Back
BuildNYC
Two family brick
342 BAY RIDGE PARKWAY
BROOKLYN · Bay Ridge · BIN 3148726
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R5BZoning
2,060 sfGross Floor Area
2Units
Two family brick · 1,863 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 25p · 2 filings · 10 docs
Floor 16p · 2 filings · 10 docs
Cellar6p · 2 filings · 10 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2022$1.1M—Private party → Private party$558/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Just Consulting Engineering411/08/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tri State Plumbing & HeatingPlumbing207/08/2026
Splen ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778211/08/2022
Building Lifecycle
12/27/2022
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00702679-I1
12/21/2022
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST AND SECOND FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON CELLAR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00702700-I1
12/19/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/30/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/12/2022
Permit renewed — Plumbing
Renewed without changes
B00702700-I1-PL
18 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDW Plumbing11/12/2022
DOB NOWPlumbingSigned-offDW Plumbing04/28/2022
DOB NOWGeneral ConstructionSigned-offSplen Construction03/29/2022
1 project · most recent 07/21/2022
General Wiring
FiledStatusContractorScope
07/21/2022CompleteHI-Rite ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/19/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/30/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/08/2022Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
11/08/2022Energy Code Compliance InspectionsXIONGCAI GUprogress
11/08/2022Fire-Resistance Rated ConstructionXIONGCAI GUprogress
10 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account