← Back
BuildNYC
Five to six families
342 EAST 78TH STREET
MANHATTAN · BIN 1045218
💬 Discuss this project
1910Year Built
4Stories
C2Building Class
R8BZoning
6,015 sfGross Floor Area
6Units
Rent Stabilized0 Active Violations
Five to six families · Owner of record: 342 E 78 Tic · 2,043 sf lot · 2.94 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarBoiler and gas piping installation9p · 1 filing · 6 docs
BasementBoiler and gas piping installation1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Nat Associates1203/21/2026
Kambos Realty607/08/2026
342 E 78 Tic103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2023$2.3M—— → —$378/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
M.int'l Engineering208/30/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Mega Electrical ContractingElectrical103/21/2026
Systems 2000 Plumbing ServicesPlumbing107/08/2026
Building Lifecycle
All (23)Filed (2)Permit Issued (1)Signed Off (1)Violation (17)Inspection (2)
11/17/2025
Violation issued (HPD, closed)
I
03/24/2024
Violation issued (HPD, closed)
A
02/15/2022
Violation issued (HPD, closed)
A
10/25/2021
Signed off — Alteration
Installation of two (2) new gas meters, two (2) new fired domestic hot water boilers and associated gas piping from existing main shut off valve in existing mechanical room on basement level.
M00560664-I1
09/08/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/30/2021
Filed — Alteration
Installation of two (2) new gas meters, two (2) new fired domestic hot water boilers and associated gas piping from existing main shut off valve in existing mechanical room on basement level.
M00560664-P1
08/26/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/16/2021
Permit issued — Plumbing
M00560664-I1-PL
07/29/2021
Filed — Alteration
Installation of two (2) new gas meters, two (2) new fired domestic hot water boilers and associated gas piping from existing main shut off valve in existing mechanical room on basement level.
M00560664-I1
04/01/2021
Violation issued (HPD, closed)
I
04/01/2021
Violation issued (HPD, closed)
A
10/25/2019
Violation issued (HPD, closed)
I
10/09/2018
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (HPD, closed)
I
12/30/2014
Violation issued (HPD, closed)
B
11/17/1999
Violation issued (ECB, closed)
Construction
07/14/1999
Violation issued (ECB, closed)
Construction
02/13/1999
Violation issued (ECB, closed)
Construction
11/18/1998
Violation issued (ECB, closed)
Construction
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSystems 2000 Plumbing Services08/16/2021
BISOTISSUEDDemari Services03/24/2021
BISOTISSUEDDemari Services02/11/2021
BISOTISSUEDDemari Services11/18/2020
BISSPISSUEDAmok09/08/2006
BIS—ISSUEDTower Building Services11/20/2004
BISMHISSUEDTower Building Services11/12/2004
BISPLISSUEDSystems 2000Plumbing Services06/28/2004
BISMHISSUEDTower Building Services06/03/2004
BISEQISSUEDEmpire Scaffolding System12/22/2003
BIS—ISSUEDEmpire Scaffolding System12/17/2003
BISOTISSUEDTBR10/26/1999
BISOTISSUEDTBR09/27/1999
BISPLISSUEDPeter BENTIVEGNA_PLMBER03/04/1999
BISOTISSUEDTBR12/22/1998
1 project · most recent 01/06/2021
General Wiring
FiledStatusContractorScope
01/06/2021Permit IssuedMega Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/26/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/03/2026M00560664-P1Request digital key ↗
09/03/2026M00560664-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION3
12/23/2021140939493Open ↗
10/20/2020140939493Open ↗
09/04/2020140939493Open ↗
▸BISWORK PERMIT APPLICATION1
11/18/2020140939493Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/03/2026M00560664-P1Open ↗
09/03/2026M00560664-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/04/2020140939493Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/04/2020140939493Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/04/2020140939493Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00560664-P1Open ↗
09/03/2026M00560664-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
06/09/2022140939493Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/28/2022140939493Open ↗
09/04/2020140939493Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/20/2020140939493Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/04/2020140939493Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/28/2022140939493Open ↗
10/19/2021140939493Open ↗
09/04/2020140939493Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/29/2022140939493Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/04/2020140939493Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/25/2022140939493Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
01/10/2022140939493Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/04/2020140939493Open ↗