← Back
Four families
342 GREENE AVENUE
BROOKLYN · BIN 3056313
💬 Discuss this project
1930Year Built
4Stories
C3Building Class
R6AZoning
3,440 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Four families · Owner of record: 342 - 344 GREENE AVE LLC · 2,216 sf lot · 1.55 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 44p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REDFERN REALTY1507/08/2026
342-344 GREENE AVE LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VALENTINO POMPEO ARCHITECT, P.C.409/20/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXOTIC DESIGN & WIRE LLCGeneral Contractor407/08/2026
F.S. SITE CORPPlumbing307/08/2026
VINCENZO NAPOLITANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803209/20/2022
Building Lifecycle
All (66)Filed (4)Permit Issued (5)Violation (9)Inspection (4)Objection (20)Special Inspection (24)
11/29/2024
Violation issued (HPD, closed)
I
03/23/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
11/04/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/23/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
09/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
09/20/2022
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION OF EXISTING 4 STORY RESIDENTIAL BUILDING WITH CELLAR. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
B00558853-P2
09/19/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/14/2022
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Air barrier - visual inspection
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Fenestration areas
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Fenestration air leakage
SAMI HAJJAR P.E
09/14/2022
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
04/02/2022
Permit issued — General Construction
B00558853-I1-GC
03/11/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/25/2022
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
01/27/2022
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION OF EXISTING 4 STORY RESIDENTIAL BUILDING WITH CELLAR. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
B00558853-P1
01/26/2022
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
01/26/2022
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
01/26/2022
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
01/26/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMI HAJJAR P.E
12/16/2021
Permit issued — Plumbing
B00558853-S1-PL
12/10/2021
Permit issued — General Construction
B00558853-I1-GC
11/12/2021
Permit issued — General Construction
B00558853-I1-GC
09/15/2021
Permit issued — General Construction
B00558853-I1-GC
08/30/2021
Filed — Alteration
APPLICATION FILED FOR THE INTERIOR REPAIR/ RENOVATION OF EXISTING 4 STORY RESIDENTIAL BUILDING WITH CELLAR. ALL WORK IS AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, BULK, OCCUPANCY OR EGRESS.
B00558853-S1
08/25/2021
Objection raised — Other
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Fire_Protection
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Scope
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Fire_Protection
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection raised — Zoning
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/25/2021
Objection resolved — Addressed
08/16/2021
Objection resolved — Addressed
07/29/2021
Objection raised — Fire_Protection
07/29/2021
Objection raised — Inspections
07/28/2021
Objection raised — Other
07/28/2021
Objection raised — Scope
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offEXOTIC DESIGN & WIRE LLC04/02/2022
DOB NOWPlumbingSigned-offALAN J BRUTOSKY PLBR CONT12/16/2021
DOB NOWGeneral ConstructionSigned-offEXOTIC DESIGN & WIRE LLC12/10/2021
DOB NOWGeneral ConstructionSigned-offEXOTIC DESIGN & WIRE LLC11/12/2021
DOB NOWGeneral ConstructionSigned-offEXOTIC DESIGN & WIRE LLC09/15/2021
1 project · most recent 09/20/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/20/2022Signed-offF.S. SITE CORPGas, Water/Sanitary
1 project · most recent 04/26/2022
General Wiring
FiledStatusContractorScope
04/26/2022CompleteNAPSTAR ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
11/04/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/11/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
09/23/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/23/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/23/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/23/2022Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
09/23/2022Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
09/23/2022Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
09/23/2022Fenestration areasSAMI HAJJAR P.Eenergy_progress
09/23/2022Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/23/2022Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
09/23/2022Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
09/14/2022Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
09/14/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/14/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/14/2022Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
09/14/2022Air barrier - visual inspectionSAMI HAJJAR P.Eenergy_progress
09/14/2022Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
09/14/2022Fenestration areasSAMI HAJJAR P.Eenergy_progress
09/14/2022Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
09/14/2022Fenestration air leakageSAMI HAJJAR P.Eenergy_progress
09/14/2022Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
01/26/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
01/26/2022HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
01/26/2022HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
01/26/2022HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026B00558853-S1Request digital key ↗
09/01/2026B00558853-P2Request digital key ↗
09/01/2026B00558853-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature20
09/01/2026B00558853-P2Open ↗
09/01/2026B00558853-P2Open ↗
09/01/2026B00558853-P2Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026B00558853-I1Open ↗
09/01/2026B00558853-P2Open ↗
09/01/2026B00558853-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00558853-P2Open ↗
09/01/2026B00558853-P2Open ↗
08/22/2026B00558853-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00558853-P2Open ↗
09/01/2026B00558853-P1Open ↗
09/01/2026B00558853-S1Open ↗
Showing 3 of 4 on file for this type