← Back
BuildNYC
Walk-up apt, over six families with stores
342 LENOX AVENUE
MANHATTAN · BIN 1053611
💬 Discuss this project
1909Year Built
5Stories
C7Building Class
R7-2Zoning
17,900 sfGross Floor Area
30Units
Rent Stabilized1 Active Violation ▸
Walk-up apt, over six families with stores · Owner of record: HPH Milano · 6,300 sf lot · 2.84 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Cellar2 filings
Site & exterior1 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abj Properties303/21/2026
HPH Milano203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rise Architecture106/20/2024
Livolt402/06/2022
Lee Engineering108/01/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
2155 Morris803/21/2026
Lee Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & E PlumbingPlumbing407/08/2026
Lionheart ConstructionScaffold303/21/2026
Empire Lic Electrical ContractorsElectrical103/22/2026
Bluecrest ConstructionGeneral Contractor103/21/2026
Amb MechanicalPlumbing210/01/2019
Efg Plumbing & HeatingPlumbing111/17/1995
G.N. ConstructionGeneral Contractor108/16/2017
Lionheart ConstructionGeneral Contractor107/02/2018
Precision Plumbing ServicesPlumbing105/10/2017
Unique Fire SystemsFire Protection109/14/2018
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Livolt7918402/06/2022
Building Lifecycle
07/24/2026
Atoi observed an existing glass enclosure/extension constructed within the sidewalk area without a valid department of buildings permit. Review of…
ECB violation · open
06/02/2026
Boiler inspection report filed
Initial · no defects · Accepted
02/12/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
07/02/2025
Boiler inspection report filed
Initial · no defects · Accepted
02/06/2025
Closed: Violation issued for failure to file annual boiler 2017 inspection report
DOB violation · closed on the city's record
157 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—A & E Plumbing—
DOB NOW—A & E Plumbing—
DOB NOW—A & E Plumbing—
DOB NOW—A & E Plumbing—
DOB NOW—Lionheart Construction—
BIS—Prime Piping & Heating—
BIS—Unique Fire Systems—
BIS—Prime Piping & Heating—
BIS—Lionheart Construction—
BIS—Bluecrest Construction—
BIS—G.N. Construction—
BIS—Precision Plumbing Services—
BIS—Bluecrest Construction—
BIS—J.E. Levine Builer—
BIS—Efg Plumbing & Heating—
BIS—J.E. Levine Builer—
Nothing on file for this building.
Nothing on file for this building.
106 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account