Condo, residential tower (mixed-use, multi-family elevator) [derived]
342 WALLABOUT STREET
BROOKLYN · BIN 3428985
💬 Discuss this project
2022Year Built
9Stories
RMBuilding Class
R7DZoning
156,152 sfGross Floor Area
146Units
1 Open Violation ▸FDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: HARRISON REALTY LLC · 33,000 sf lot · 4.73 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof185p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 4 docs
Floor 8170p · 5 filings · 20 docs
Floor 7174p · 5 filings · 20 docs
Floor 6172p · 5 filings · 20 docs
Floor 5171p · 5 filings · 20 docs
Floor 4168p · 5 filings · 20 docs
Floor 3173p · 5 filings · 20 docs
Floor 2172p · 5 filings · 20 docs
Floor 1173p · 4 filings · 20 docs
Cellar168p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HSD CONSTRUCTION108/31/2026
GALAXY DEVELOPERS11507/08/2026
HARRISON REALTY503/22/2026
HARRISON PLAZA203/21/2026
RABSKY DEVELOPMENT203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION603/21/2026
SYNERGY BUILDING CONSULTANTS703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GALAXY DEVELOPERS LLCGeneral Contractor3007/08/2026
COLGATE ENTERPRISE CORPGeneral Contractor907/08/2026
PLBG P & H INCPlumbing807/08/2026
SAFETY FIRE SPRINKLER CORPlumbing303/22/2026
SAFETY FIRE SPRINKLER CORPFire Protection307/08/2026
A. M. PLUMBING COMPANYPlumbing307/08/2026
PAUL OLSENElectrical203/21/2026
FISCHER MAKOOI ARCHITECTSGeneral Contractor203/22/2026
SKYVIEW HTG&AIR CON CORPPlumbing107/08/2026
JOHN DICAPUAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
20/20 INSPECTIONS INC14711805/26/2026
TOHFAZ UDDIN P.E.2001402/01/2023
Building Lifecycle
All (169)Filed (34)Permit Issued (29)Signed Off (12)Violation (2)Inspection (14)Objection (48)Special Inspection (30)
05/31/2026
Special inspection requirement — Fenestration areas
JACOB HAAS
05/31/2026
Special inspection requirement — Vestibules
JACOB HAAS
05/31/2026
Special inspection requirement — Insulation placement and R values
JACOB HAAS
05/31/2026
Special inspection requirement — Air barrier - visual inspection
JACOB HAAS
05/31/2026
Special inspection requirement — Lighting controls
JACOB HAAS
05/31/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JACOB HAAS
05/31/2026
Special inspection requirement — Lighting in dwelling units
JACOB HAAS
05/31/2026
Special inspection requirement — Air barrier continuity plan testing
JACOB HAAS
05/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JACOB HAAS
05/31/2026
Special inspection requirement — Interior lighting power
JACOB HAAS
05/31/2026
Special inspection requirement — Electrical motors and elevators
JACOB HAAS
05/31/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JACOB HAAS
05/31/2026
Special inspection requirement — Post-installed Anchors
JACOB HAAS
05/31/2026
Special inspection requirement — Chimneys and vents
JACOB HAAS
05/31/2026
Special inspection requirement — Exterior lighting power
JACOB HAAS
05/31/2026
Special inspection requirement — Permanent certificate
JACOB HAAS
05/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JACOB HAAS
05/31/2026
Special inspection requirement — Protection of exposed foundation insulation
JACOB HAAS
05/31/2026
Special inspection requirement — Lowest Floor Elevation
JACOB HAAS
05/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
JACOB HAAS
05/31/2026
Special inspection requirement — Energy Code Compliance Inspections
JACOB HAAS
05/31/2026
Special inspection requirement — Maintenance information
JACOB HAAS
05/31/2026
Special inspection requirement — Concrete - Cast-In-Place
JACOB HAAS
05/31/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JACOB HAAS
05/31/2026
Special inspection requirement — Masonry
JACOB HAAS
05/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACOB HAAS
05/31/2026
Special inspection requirement — Subgrade Inspections
JACOB HAAS
05/31/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JACOB HAAS
05/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JACOB HAAS
05/31/2026
Special inspection requirement — Fenestration air leakage
JACOB HAAS
05/26/2026
Filed — New Building
B00492768-P6
12/30/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/29/2025
Signed off — Alteration
B00534294-I1
09/23/2024
Signed off — Alteration
Sprinkle Standpipe application filed in conjunction with NB application #B00492768-I1
B00618696-I1
08/28/2024
Signed off — Alteration
Plumbing application filed in conjunction with NB application #B00492768-I1
B00555968-I1
08/21/2024
Signed off — New Building
B00492768-S2
07/18/2024
Signed off — Alteration
Temporary Standpipe in conjunction with NB Job number B00492768-I1
B00549240-I1
07/18/2024
Permit issued — Plumbing
B00555968-I1-PL
07/17/2024
Signed off — New Building
B00492768-S4
07/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/03/2024
Permit issued — Plumbing
B00555968-I1-PL
05/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/01/2024
Permit issued — Plumbing
B00555968-I1-PL
04/16/2024
Filed — Alteration
Plumbing application filed in conjunction with NB application #B00492768-I1
B00555968-P5
04/12/2024
Objection raised — Scope
04/12/2024
Objection resolved — Addressed
04/11/2024
Filed — Alteration
Plumbing application filed in conjunction with NB application #B00492768-I1
B00555968-P4
04/04/2024
Filed — New Building
B00492768-P5
03/28/2024
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
03/28/2024
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/27/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2024
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/13/2024
Objection raised — Other
03/13/2024
Objection resolved — Addressed
03/05/2024
Filed — Alteration
Sprinkle Standpipe application filed in conjunction with NB application #B00492768-I1
B00618696-P3
02/29/2024
Filed — New Building
B00492768-P3
02/29/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
02/22/2024
Filed — Alteration
Plumbing application filed in conjunction with NB application #B00492768-I1
B00555968-P3
02/20/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY07/18/2024
DOB NOWPlumbingSigned-offSKYVIEW HTG&AIR CON CORP07/03/2024
DOB NOWPlumbingSigned-offPLBG P & H INC05/01/2024
DOB NOWCurb CutSigned-offGALAXY DEVELOPERS LLC01/22/2024
DOB NOWMechanical SystemsPermit IssuedGALAXY DEVELOPERS LLC10/20/2023
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP09/29/2023
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP09/12/2023
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP06/30/2023
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP06/30/2023
DOB NOWGeneral ConstructionPermit IssuedGALAXY DEVELOPERS LLC04/25/2023
DOB NOWPlumbingSigned-offPLBG P & H INC03/17/2023
DOB NOWGeneral ConstructionPermit IssuedGALAXY DEVELOPERS LLC01/26/2023
DOB NOWStructuralSigned-offGALAXY DEVELOPERS LLC01/05/2023
DOB NOWConstruction FenceSigned-offGALAXY DEVELOPERS LLC11/29/2022
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP11/10/2022
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP11/03/2022
DOB NOWSupported ScaffoldSigned-offCOLGATE ENTERPRISE CORP09/29/2022
DOB NOWSupport of ExcavationSigned-offGALAXY DEVELOPERS LLC09/22/2022
DOB NOWSidewalk ShedSigned-offCOLGATE ENTERPRISE CORP09/15/2022
DOB NOWSupport of ExcavationSigned-offGALAXY DEVELOPERS LLC09/06/2022
DOB NOWFoundationSigned-offGALAXY DEVELOPERS LLC08/01/2022
DOB NOWGeneral ConstructionPermit IssuedGALAXY DEVELOPERS LLC07/13/2022
DOB NOWEarth WorkSigned-offGALAXY DEVELOPERS LLC07/11/2022
DOB NOWPlumbingSigned-offPLBG P & H INC07/01/2022
DOB NOWStructuralSigned-offGALAXY DEVELOPERS LLC03/30/2022
DOB NOWGeneral ConstructionPermit IssuedGALAXY DEVELOPERS LLC03/24/2022
DOB NOWEarth WorkSigned-offGALAXY DEVELOPERS LLC01/21/2022
DOB NOWConstruction FenceSigned-offGALAXY DEVELOPERS LLC12/09/2021
DOB NOWSupport of ExcavationSigned-offGALAXY DEVELOPERS LLC10/06/2021
1 project · most recent 01/25/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
01/25/2022Permit IssuedGALAXY DEVELOPERS LLCAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM 48,000 BTU · Condensing Unit ×60
MXZ-SM96TAM 264 BTU · Condensing Unit ×3
MXZ SM96TAM 240 BTU · Condensing Unit ×2
PURY-EP144TNU-A1 192 BTU · Vrf Outdoor ×2
MXX SM96TAM 288 BTU · Condensing Unit ×1
MZX SM48NAM2 192 BTU · Condensing Unit ×1
Daikin RXYQ48XATJA 48,000 BTU · Vrf Outdoor ×120
Heating
A.O. Smith GSX-75XRPS 400 75 BTU · Water Heater ×60
5 projects · most recent 06/03/2026
General Wiring
FiledStatusContractorScope
06/03/2026Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
08/29/2023Permit IssuedM.R. ELEC'L SERVICE LLC—
10/12/2022CompleteNASH ELECTRIC SERVICES IN—
10/05/2022CancelledCAPUTEK ELEC'L SERVICES,—
09/29/2022CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
12/30/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/28/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
03/28/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/27/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/25/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/29/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
02/20/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/13/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/16/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
12/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/12/2023Fail-Final PL - Up to 9 Requested FloorsFailView ↗
12/06/2022Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 147
DateRequirementInspectorRole
05/31/2026Wall Panels, Curtain Walls, and VeneersJACOB HAASspecial
05/31/2026Concrete - Cast-In-PlaceJACOB HAASspecial
05/31/2026Excavations - Sheeting, Shoring, and BracingJACOB HAASspecial
05/31/2026Fire-Resistant Penetrations and JointsJACOB HAASspecial
05/31/2026MasonryJACOB HAASspecial
05/31/2026Lowest Floor ElevationJACOB HAASprogress
05/31/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJACOB HAASspecial
05/31/2026Exterior Insulation and Finish Systems (EIFS)JACOB HAASspecial
05/31/2026Chimneys and ventsJACOB HAASspecial
05/31/2026Structural Stability – Alterations of existing buildingsJACOB HAASspecial
05/31/2026Post-installed AnchorsJACOB HAASspecial
05/31/2026Subgrade InspectionsJACOB HAASspecial
05/31/2026Electrical motors and elevatorsJACOB HAASenergy_progress
05/31/2026Fenestration areasJACOB HAASenergy_progress
05/31/2026Air barrier - visual inspectionJACOB HAASenergy_progress
05/31/2026Interior lighting powerJACOB HAASenergy_progress
05/31/2026Maintenance informationJACOB HAASenergy_progress
05/31/2026Fenestration and door U-factor and product ratingsJACOB HAASenergy_progress
05/31/2026Insulation placement and R valuesJACOB HAASenergy_progress
05/31/2026Air barrier continuity plan testingJACOB HAASenergy_progress
05/31/2026Protection of exposed foundation insulationJACOB HAASenergy_progress
05/31/2026HVAC-R and service water piping design and insulationJACOB HAASenergy_progress
05/31/2026Lighting in dwelling unitsJACOB HAASenergy_progress
05/31/2026Permanent certificateJACOB HAASenergy_progress
05/31/2026Exterior lighting powerJACOB HAASenergy_progress
Latest 25 of 147.
▾Documents — 346 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch33
09/01/2026B00534294-I1Request digital key ↗
09/01/2026B00555968-I1Request digital key ↗
09/01/2026B00555968-P3Request digital key ↗
Showing 3 of 33 on file for this type
▸DOB NOWPlans/Sketch - Support of Excavation1
09/01/2026B00460851-I1Request digital key ↗
▸Applications & Permits24
▸DOB NOWHPD - Permit Notice16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
09/25/2025322120600Open ↗
08/20/2025322120600Open ↗
08/15/2025322120600Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
09/21/2023340829287Open ↗
▸Zoning, Tax Lot & Property Records37
▸DOB NOWRestrictive Declaration/Easement 17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/16/2026B00492768-P6Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWRestrictive Declaration/Easement 34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/22/2025322120600Open ↗
10/01/2024322161361Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/01/2024322161361Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/01/2024322161361Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications176
▸DOB NOWProgress Inspector Seal & Signature82
08/28/2026B00492768-I1Open ↗
08/28/2026B00492768-I1Open ↗
08/28/2026B00492768-I1Open ↗
Showing 3 of 82 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature59
09/28/2026B00605967-I1Open ↗
09/28/2026B00605967-I1Open ↗
09/28/2026B00605967-I1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature34
09/01/2026B00460851-I1Open ↗
09/01/2026B00534294-I1Open ↗
09/01/2026B00555968-I1Open ↗
Showing 3 of 34 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/03/2021340829287Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sanitary Sewer Certification (HCP/SC)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/16/2026B00492768-P6Open ↗
08/16/2026B00492768-P5Open ↗
08/16/2026B00492768-P1Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/08/2023340829287Open ↗
▸BISBPP: STREET TREES SITE PLAN1
11/08/2023340829287Open ↗
▸BISSTREET TREE CHECKLIST1
10/12/2023340829287Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos12
▸DOB NOWOER: Notice to Proceed9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWOER: Notice of Satisfaction2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/01/2024322161361Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/26/2025322120600Open ↗
08/19/2025322120600Open ↗
10/01/2024322161361Open ↗
Showing 3 of 6 on file for this type
▸BISCURB CUT (CC) SIGNOFF1
07/22/2024340829287Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET3
08/15/2025322120600Open ↗
09/26/2024322161361Open ↗
09/08/2023322113921Open ↗
▸BISADDITIONAL INFORMATION2
04/10/2024340829287Open ↗
10/12/2023340829287Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/03/2021340829287Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/21/2023340829287Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents19
▸DOB NOWSite Survey: Initial5
08/16/2026B00492768-P6Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLOT DIAGRAM2
09/22/2025322120600Open ↗
10/01/2024322161361Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/12/2023340829287Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
09/22/2025322120600Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
11/08/2023340829287Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
10/12/2023340829287Open ↗
▸DOB NOWHPD - Completion Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type