← Back
BuildNYC
Five to six families
342 WEST 15TH STREET
MANHATTAN · BIN 1013032
💬 Discuss this project
1900Year Built
6Stories
C2Building Class
R8BZoning
3,950 sfGross Floor Area
6Units
Rent Stabilized2 Active Violations ▸
Five to six families · Owner of record: Zhao NYC · 1,528 sf lot · 2.59 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPlumbing and demolition for multiple floors42p · 3 filings · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 5Plumbing and demolition for multiple floors41p · 3 filings · 20 docs
Floor 4Plumbing and demolition for multiple floors37p · 3 filings · 20 docs
Floor 3Plumbing and demolition for multiple floors40p · 3 filings · 20 docs
Floor 2Plumbing and demolition for multiple floors35p · 3 filings · 20 docs
Floor 121p · 1 filing · 20 docs
CellarPlumbing and demolition for multiple floors36p · 2 filings · 20 docs
Basement1p · 1 filing · 20 docs
Sub-Basement21p · 1 filing · 20 docs
Site & exteriorSidewalk bridge installation12p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ma Real Estate1003/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/06/2018$7.5M—ROSIN REAL ESTATE CAPITAL LLC → Zhao NYC$1,899/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JMV Consulting Engineering502/26/2024
KZ Engineering409/16/2021
Tohfaz Uddin PE207/14/2021
Tocci Engineering101/28/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code1203/21/2026
Synergy Building Consultants603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dutchman ContractingGeneral Contractor2007/08/2026
CS BridgeScaffold1107/08/2026
Five Star P and H CoPlumbing507/08/2026
Five Star P & H CoFire Protection507/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JMV Consulting Engineering804502/26/2024
Chen Engineering Services1826101/28/2020
Building Lifecycle
All (121)Filed (12)Permit Issued (30)Signed Off (6)Violation (17)Objection (30)Special Inspection (26)
04/29/2026
Violation issued (HPD, open)
A
06/04/2025
Violation issued (HPD, open)
A
04/22/2024
Signed off — Alteration
RENOVATION OF EXISTING MULTIPLE DWELLING AND EXISTING TRIPLEX APARTMENT ON 2ND THRU 5TH FLOORS AND ROOF. SPRINKLER AND PLUMBING WORK TYPE. NO CHANGE IN USE OR OCCUPANCY, MINOR CHANGE IN EGRESS.
M00285995-I1
04/01/2024
Violation issued (HPD, closed)
A
02/26/2024
Filed — Alteration
RENOVATION OF EXISTING MULTIPLE DWELLING AND EXISTING TRIPLEX APARTMENT ON 2ND THRU 5TH FLOORS AND ROOF. SPRINKLER AND PLUMBING WORK TYPE. NO CHANGE IN USE OR OCCUPANCY, MINOR CHANGE IN EGRESS.
M00285995-P2
02/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
02/05/2024
Special inspection requirement — Sprinkler Systems
Joseph Vuto
12/19/2023
Permit issued — Sprinklers
M00285995-I1-EW-SP
12/18/2023
Permit issued — Plumbing
M00285995-I1-PL
11/15/2023
Violation issued (HPD, closed)
I
10/03/2023
Signed off — Alteration
RENOVATION OF EXISTING MULTIPLE DWELLING AND EXISTING TRIPLEX APARTMENT ON 2ND THRU 5TH FLOORS AND ROOF. MECHANICAL WORK TYPE. NO CHANGE IN USE OR OCCUPANCY, MINOR CHANGE IN EGRESS
M00285990-I1
09/14/2023
Signed off — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00378911-I1
09/14/2023
Signed off — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00378920-I1
09/11/2023
Special inspection requirement — HVAC and service water heating equipment
Joseph Vuto
09/11/2023
Special inspection requirement — Final
Joseph Vuto
09/11/2023
Special inspection requirement — Maintenance information
Joseph Vuto
09/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
09/11/2023
Special inspection requirement — Mechanical Systems
Joseph Vuto
09/11/2023
Special inspection requirement — HVAC insulation and sealing
Joseph Vuto
09/11/2023
Special inspection requirement — HVAC and service water heating system controls
Joseph Vuto
09/05/2023
Filed — Alteration
RENOVATION OF EXISTING MULTIPLE DWELLING AND EXISTING TRIPLEX APARTMENT ON 2ND THRU 5TH FLOORS AND ROOF. MECHANICAL WORK TYPE. NO CHANGE IN USE OR OCCUPANCY, MINOR CHANGE IN EGRESS
M00285990-P1
08/14/2023
Filed — Alteration
RENOVATION OF EXISTING MULTIPLE DWELLING AND EXISTING TRIPLEX APARTMENT ON 2ND THRU 5TH FLOORS AND ROOF. SPRINKLER AND PLUMBING WORK TYPE. NO CHANGE IN USE OR OCCUPANCY, MINOR CHANGE IN EGRESS.
M00285995-P1
05/18/2023
Permit issued — Mechanical Systems
M00285990-I1-MS
05/09/2023
Signed off — Alteration
M00285999-I1
05/04/2023
Signed off — Alteration
Installation of temporary suspended scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00541322-I1
03/15/2023
Violation issued (HPD, closed)
A
02/21/2023
Permit issued — Mechanical Systems
M00285990-I1-MS
01/18/2023
Permit issued — Sprinklers
M00285995-I1-PL
01/17/2023
Permit issued — Sprinklers
M00285995-I1-EW-SP
10/07/2022
Special inspection requirement — Maintenance information
Joseph Vuto
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
10/07/2022
Special inspection requirement — Mechanical Systems
Joseph Vuto
10/07/2022
Special inspection requirement — Final
Joseph Vuto
10/07/2022
Special inspection requirement — HVAC and service water heating system controls
Joseph Vuto
10/07/2022
Special inspection requirement — HVAC and service water heating equipment
Joseph Vuto
10/07/2022
Special inspection requirement — HVAC insulation and sealing
Joseph Vuto
10/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Vuto
10/07/2022
Special inspection requirement — Sprinkler Systems
Joseph Vuto
08/03/2022
Permit issued — Sidewalk Shed
M00378911-I1-SH
08/02/2022
Permit issued — Supported Scaffold
M00378920-I1-SF
06/14/2022
Permit issued — Mechanical Systems
M00285990-I1-MS
06/14/2022
Permit issued — Structural
M00285999-I1-ST
02/17/2022
Permit issued — Plumbing
M00285995-I1-PL
02/16/2022
Violation issued (HPD, closed)
A
02/15/2022
Permit issued — Sprinklers
M00285995-I1-EW-SP
12/22/2021
Permit issued — Mechanical Systems
M00285990-I1-MS
12/21/2021
Permit issued — Structural
M00285999-I1-ST
12/21/2021
Permit issued — Mechanical Systems
M00285990-I1-MS
11/01/2021
Permit issued — Mechanical Systems
M00285990-I1-MS
09/16/2021
Filed — Alteration
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00378920-P1
09/16/2021
Filed — Alteration
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00378911-P1
08/06/2021
Permit issued — Sidewalk Shed
M00378911-I1-SH
08/02/2021
Permit issued — Supported Scaffold
M00378920-I1-SF
07/14/2021
Filed — Alteration
Installation of temporary suspended scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00541322-P1
06/17/2021
Filed — Alteration
Installation of temporary suspended scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00541322-I1
06/17/2021
Permit issued — Protection and Mechanical Methods
M00541322-I1-PM
05/26/2021
Permit issued — Structural
M00285999-I1-ST
03/12/2021
Permit issued — Plumbing
M00285995-I1-EW-SP
03/12/2021
Permit issued — Plumbing
M00285995-I1-PL
08/20/2020
Permit issued — Sidewalk Shed
M00378911-I1-SH
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offFive Star P & H Co12/19/2023
DOB NOWPlumbingSigned-offFive Star P and H Co12/18/2023
DOB NOWMechanical SystemsSigned-offDutchman Contracting05/18/2023
DOB NOWMechanical SystemsSigned-offDutchman Contracting02/21/2023
DOB NOWPlumbingSigned-offFive Star P and H Co01/18/2023
DOB NOWSprinklersSigned-offFive Star P & H Co01/17/2023
DOB NOWSidewalk ShedSigned-offCS Bridge08/03/2022
DOB NOWSupported ScaffoldSigned-offCS Bridge08/02/2022
DOB NOWMechanical SystemsSigned-offDutchman Contracting06/14/2022
DOB NOWStructuralSigned-offDutchman Contracting06/14/2022
DOB NOWPlumbingSigned-offFive Star P and H Co02/17/2022
DOB NOWSprinklersSigned-offFive Star P & H Co02/15/2022
DOB NOWMechanical SystemsSigned-offDutchman Contracting12/22/2021
DOB NOWStructuralSigned-offDutchman Contracting12/21/2021
DOB NOWMechanical SystemsSigned-offDutchman Contracting12/21/2021
DOB NOWMechanical SystemsSigned-offDutchman Contracting11/01/2021
DOB NOWSidewalk ShedSigned-offCS Bridge08/06/2021
DOB NOWSupported ScaffoldSigned-offCS Bridge08/02/2021
DOB NOWProtection and Mechanical MethodsSigned-offCS Bridge06/17/2021
DOB NOWStructuralSigned-offDutchman Contracting05/26/2021
DOB NOWSprinklersSigned-offFive Star P & H Co03/12/2021
DOB NOWPlumbingSigned-offFive Star P and H Co03/12/2021
DOB NOWSidewalk ShedSigned-offCS Bridge08/20/2020
DOB NOWSupported ScaffoldSigned-offCS Bridge08/20/2020
DOB NOWMechanical SystemsSigned-offDutchman Contracting07/23/2020
DOB NOWStructuralSigned-offDutchman Contracting06/19/2020
DOB NOWPlumbingSigned-offFive Star P and H Co03/16/2020
DOB NOWSprinklersSigned-offFive Star P & H Co03/16/2020
DOB NOWMechanical SystemsSigned-offDutchman Contracting03/04/2020
DOB NOWStructuralSigned-offDutchman Contracting02/19/2020
BISOTISSUEDDutchman Contracting05/18/2023
BISOTISSUEDDutchman Contracting12/13/2022
BISOTISSUEDDutchman Contracting06/29/2022
BISOTISSUEDDutchman Contracting12/03/2020
BISOTISSUEDDutchman Contracting05/28/2020
BISOTISSUEDDutchman Contracting05/11/2020
BISOTISSUEDDutchman Contracting02/04/2020
BIS—ISSUEDB2B Associates08/13/2007
BIS—ISSUEDB2B Associates10/04/2006
BISBLISSUEDRockway Fuel Oil09/17/2002
3 projects · most recent 11/09/2022
General Wiring
FiledStatusContractorScope
11/09/2022CompleteUltra ElectricGeneral Wiring
12/13/2021CompleteUltra Electric5 meters, 2 new_meters
07/31/2020CompleteNash Electric Services—
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
02/05/2024Fire-Resistant Penetrations and JointsJoseph Vutospecial
02/05/2024Sprinkler SystemsJoseph Vutospecial
09/11/2023HVAC and service water heating equipment Joseph Vutoenergy_progress
09/11/2023FinalJoseph Vutoprogress
09/11/2023Maintenance informationJoseph Vutoenergy_progress
09/11/2023Fire-Resistant Penetrations and JointsJoseph Vutospecial
09/11/2023Mechanical SystemsJoseph Vutospecial
09/11/2023HVAC insulation and sealing Joseph Vutoenergy_progress
09/11/2023HVAC and service water heating system controls Joseph Vutoenergy_progress
10/07/2022Maintenance informationJoseph Vutoenergy_progress
10/07/2022Fire-Resistant Penetrations and JointsJoseph Vutospecial
10/07/2022Mechanical SystemsJoseph Vutospecial
10/07/2022FinalJoseph Vutoprogress
10/07/2022HVAC and service water heating system controls Joseph Vutoenergy_progress
10/07/2022HVAC and service water heating equipment Joseph Vutoenergy_progress
10/07/2022HVAC insulation and sealing Joseph Vutoenergy_progress
10/07/2022Fire-Resistant Penetrations and JointsJoseph Vutospecial
10/07/2022Sprinkler SystemsJoseph Vutospecial
01/06/2020Post-installed AnchorsHENLIA CHENspecial
01/06/2020MasonryHENLIA CHENspecial
01/06/2020Structural Steel - WeldingHENLIA CHENspecial
01/06/2020Structural Steel - High Strength BoltingHENLIA CHENspecial
01/06/2020Structural Steel - DetailsHENLIA CHENspecial
01/06/2020Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
01/06/2020Structural Cold-Formed SteelHENLIA CHENspecial
Latest 25 of 26.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00285995-P1Request digital key ↗
09/05/2026M00285995-P2Request digital key ↗
08/15/2026M00285995-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00285995-P1Request digital key ↗
09/05/2026M00285995-P2Request digital key ↗
08/15/2026M00285995-I1Request digital key ↗
▸DOB NOWPlans/Sketch2
09/03/2026M00541322-I1Request digital key ↗
09/03/2026M00541322-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00285990-P1Request digital key ↗
08/15/2026M00285990-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/03/2026M00378920-P1Request digital key ↗
09/03/2026M00378920-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/03/2026M00378911-I1Request digital key ↗
09/03/2026M00378911-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00285999-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
10/25/2022121206131Open ↗
12/27/2019121206131Open ↗
11/25/2019121206131Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
01/13/2020121206131Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature15
08/29/2026M00285990-I1Open ↗
08/29/2026M00285990-I1Open ↗
08/28/2026M00285995-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00285995-P1Open ↗
09/05/2026M00285995-I1Open ↗
09/05/2026M00285995-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026M00285990-I1Open ↗
08/29/2026M00285990-I1Open ↗
08/29/2026M00285990-I1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan3
09/05/2026M00285995-P1Open ↗
09/05/2026M00285995-P2Open ↗
08/15/2026M00285995-I1Open ↗
▸BISTenant Protection Plan and Notes1
01/13/2020121206131Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00285995-P2Open ↗
09/05/2026M00285995-P1Open ↗
08/15/2026M00285990-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
01/13/2020121206131Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/06/2023121206131Open ↗
09/06/2023121206131Open ↗
12/13/2019121206131Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
01/22/2020121206131Open ↗
01/22/2020121206131Open ↗
01/17/2020121206131Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
09/06/2023121206131Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/06/2023121206131Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/06/2023121206131Open ↗
▸BISFENESTRATION AREAS1
09/06/2023121206131Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
09/06/2023121206131Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/06/2023121206131Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/06/2023121206131Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00285990-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY4
09/06/2023121206131Open ↗
09/06/2023121206131Open ↗
01/13/2020121206131Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
09/06/2023121206131Open ↗
09/06/2023121206131Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/06/2023121206131Open ↗
▸BISFINAL1
09/06/2023121206131Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/06/2023121206131Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT1
01/13/2020121206131Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/06/2023121206131Open ↗
▸BISWELDERS AFFIDAVIT1
02/05/2020121206131Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00285995-P2Open ↗
08/16/2026M00285995-I1Open ↗
▸BISEFILING COVER SHEET1
01/13/2020121206131Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
01/13/2020121206131Open ↗