Miscellaneous two family
342 WEST 84 STREET
MANHATTAN · BIN 1033834
💬 Discuss this project
1889Year Built
3Stories
B9Building Class
R8BZoning
4,104 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Miscellaneous two family · Owner of record: 342 WEST 84TH STREET LLC · 1,839 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 32p · 1 filing · 18 docs
Floor 23p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar1p · 1 filing · 18 docs
Basement1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
E C MANAGEMENT603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/14/2022$4.2M—Private party → 342 WEST 84TH STREET LLC$1,036/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PIRO STUDIO LLC801/26/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DI DIO ARCHITECTURE, PC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCE TEAM CONSULTANT *General Contractor903/21/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PIRO STUDIO LLC7503601/26/2025
J. MEDINA ENGINEERING LLC7034208/08/2023
Building Lifecycle
All (50)Filed (8)Permit Issued (5)Signed Off (4)Violation (2)Inspection (5)Special Inspection (26)
02/18/2025
Signed off — Alteration
MODIFICATIONS TO EXISTING WATER/SANITARY AND GAS FIXTURES/ PIPING THROUGHOUT BUILDING.
M00875065-I1
01/26/2025
Filed — Alteration
MODIFICATIONS TO EXISTING WATER/SANITARY AND GAS FIXTURES/ PIPING THROUGHOUT BUILDING.
M00875065-P3
12/03/2024
Violation issued (HPD, closed)
I
09/03/2024
Filed — Alteration
MODIFICATIONS TO EXISTING WATER/SANITARY AND GAS FIXTURES/ PIPING THROUGHOUT BUILDING.
M00875065-P2
09/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
08/09/2024
Permit issued — Plumbing
M00875065-I1-PL
07/23/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/02/2024
Filed — Alteration
MODIFICATIONS TO EXISTING WATER/SANITARY AND GAS FIXTURES/ PIPING THROUGHOUT BUILDING.
M00875065-P1
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
06/20/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/09/2024
Signed off — Alteration
M00875061-S1
04/04/2024
Permit issued — Structural
M00875061-S1-ST
03/07/2024
Signed off — Alteration
M00875070-I1
01/26/2024
Signed off — Alteration
M00875061-I1
10/23/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/09/2023
Special inspection requirement — Final
Jarib Medina
08/09/2023
Special inspection requirement — Structural Cold-Formed Steel
Jarib Medina
08/09/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jarib Medina
08/09/2023
Special inspection requirement — Concrete - Cast-In-Place
Jarib Medina
08/09/2023
Special inspection requirement — Structural Steel - Details
Jarib Medina
08/08/2023
Filed — Alteration
M00875061-P1
08/03/2023
Permit issued — Mechanical Systems
M00875070-I1-MS
08/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Jarib Medina
08/03/2023
Special inspection requirement — Structural Steel - Details
Jarib Medina
08/03/2023
Special inspection requirement — Final
Jarib Medina
08/03/2023
Special inspection requirement — Concrete - Cast-In-Place
Jarib Medina
08/03/2023
Special inspection requirement — Structural Cold-Formed Steel
Jarib Medina
08/02/2023
Permit issued — Plumbing
M00875065-I1-PL
08/01/2023
Permit issued — General Construction
M00875061-I1-GC
06/05/2023
Filed — Alteration
M00875061-S1
05/27/2023
Filed — Alteration
MODIFICATIONS TO EXISTING WATER/SANITARY AND GAS FIXTURES/ PIPING THROUGHOUT BUILDING.
M00875065-I1
05/27/2023
Filed — Alteration
M00875070-I1
05/26/2023
Filed — Alteration
M00875061-I1
05/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
PIETRO ROSATO
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
PIETRO ROSATO
05/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
PIETRO ROSATO
05/22/2023
Special inspection requirement — Fenestration air leakage
PIETRO ROSATO
05/22/2023
Special inspection requirement — Lighting in dwelling units
PIETRO ROSATO
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
PIETRO ROSATO
05/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PIETRO ROSATO
05/22/2023
Special inspection requirement — Air barrier - visual inspection
PIETRO ROSATO
05/22/2023
Special inspection requirement — Insulation placement and R values
PIETRO ROSATO
05/22/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
PIETRO ROSATO
05/15/2023
Special inspection requirement — Mechanical Systems
PIETRO ROSATO
05/15/2023
Special inspection requirement — Final
PIETRO ROSATO
05/15/2023
Special inspection requirement — Final
PIETRO ROSATO
03/16/2022
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/09/2024
DOB NOWStructuralSigned-offADVANCE TEAM CONSULTANT *04/04/2024
DOB NOWMechanical SystemsSigned-offADVANCE TEAM CONSULTANT *08/03/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP08/02/2023
DOB NOWGeneral ConstructionSigned-offADVANCE TEAM CONSULTANT *08/01/2023
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/23/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
06/20/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/03/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/26/2024Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
08/09/2023FinalJarib Medinaprogress
08/09/2023Structural Cold-Formed SteelJarib Medinaspecial
08/09/2023Structural Stability – Alterations of existing buildingsJarib Medinaspecial
08/09/2023Concrete - Cast-In-PlaceJarib Medinaspecial
08/09/2023Structural Steel - DetailsJarib Medinaspecial
08/03/2023Structural Stability – Alterations of existing buildingsJarib Medinaspecial
08/03/2023Structural Steel - DetailsJarib Medinaspecial
08/03/2023FinalJarib Medinaprogress
08/03/2023Concrete - Cast-In-PlaceJarib Medinaspecial
08/03/2023Structural Cold-Formed SteelJarib Medinaspecial
05/26/2023HVAC-R and service water heating equipmentPIETRO ROSATOenergy_progress
05/26/2023Energy Code Compliance InspectionsPIETRO ROSATOprogress
05/26/2023HVAC-R and service water heating system controlsPIETRO ROSATOenergy_progress
05/26/2023HVAC-R and service water piping design and insulationPIETRO ROSATOenergy_progress
05/22/2023Fenestration air leakagePIETRO ROSATOenergy_progress
05/22/2023Lighting in dwelling unitsPIETRO ROSATOenergy_progress
05/22/2023Energy Code Compliance InspectionsPIETRO ROSATOprogress
05/22/2023Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
05/22/2023Air barrier - visual inspectionPIETRO ROSATOenergy_progress
05/22/2023Insulation placement and R valuesPIETRO ROSATOenergy_progress
05/22/2023Fenestration and door U-factor and product ratingsPIETRO ROSATOenergy_progress
05/15/2023Mechanical SystemsPIETRO ROSATOspecial
05/15/2023FinalPIETRO ROSATOprogress
Latest 25 of 26.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/31/2026M00875070-I1Request digital key ↗
08/31/2026M00875061-I1Request digital key ↗
08/31/2026M00875061-S1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/31/2026M00875061-S1Open ↗
08/13/2026M00875061-P1Open ↗
08/13/2026M00875065-P1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026M00875070-I1Open ↗
08/29/2026M00875070-I1Open ↗
08/29/2026M00875070-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/31/2026M00875061-S1Open ↗
08/26/2026M00875065-P3Open ↗
08/26/2026M00875065-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/29/2026M00875070-I1Open ↗
08/28/2026M00875061-I1Open ↗
08/25/2026M00875065-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/31/2026M00875061-S1Open ↗
08/26/2026M00875065-P3Open ↗
08/26/2026M00875065-P2Open ↗
Showing 3 of 8 on file for this type