← Back
BuildNYC
Mansion type or town house
3420 BEDFORD AVENUE
BROOKLYN · Midwood · BIN 3210111
💬 Discuss this project
2019Year Built
2.5Stories
A7Building Class
R2Zoning
12,335 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Mansion type or town house · Owner of record: 3428 Bedford · 21,000 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Generator installation1p · 1 filing · 2 docs
Floor 1Accessory off-street parking garage curb cut9p · 3 filings · 10 docs
CellarBoiler replacement project7p · 2 filings · 13 docs
Site & exteriorProposed construction fence4p · 2 filings · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3420 Bedford2203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Yona Love Consulting Services1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.N.C. General ContractorsScaffold1107/08/2026
M.N.C. General ContractorsGeneral Contractor707/08/2026
R & S Plumbing & HeatingPlumbing307/08/2026
Net Power ElectricElectrical103/21/2026
MNC General Contractingspecialty_contractor107/08/2026
Preston NYCGeneral Contractor105/06/2019
Safety Fire SprinklerFire Protection211/29/2021
Theodore Wagner Plumbing and HeatingPlumbing106/02/1992
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica1795407/13/2022
Building Lifecycle
10/16/2026
Elevator Category 1 inspection report filed
04/26/2023
Signed off — Alteration
B00147522-I1
12/21/2022
Signed off — Alteration
NEW CURB CUT
B00093656-I1
12/20/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/15/2022
Objection resolved — Addressed
63 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMNC General Contracting10/24/2022
DOB NOWBoiler EquipmentSigned-offR & S Plumbing & Heating05/17/2022
DOB NOWMechanical SystemsSigned-offMNC General Contracting11/01/2021
DOB NOWCurb CutSigned-offMNC General Contracting11/01/2021
DOB NOWCurb CutSigned-offMNC General Contracting11/01/2021
DOB NOWConstruction FenceSigned-offMNC General Contracting10/28/2021
DOB NOWStructuralSigned-offMNC General Contracting11/27/2020
DOB NOWConstruction FenceSigned-offMNC General Contracting10/30/2020
DOB NOWConstruction FenceSigned-offMNC General Contracting09/28/2020
DOB NOWConstruction FenceSigned-offMNC General Contracting09/25/2019
DOB NOWConstruction FenceSigned-offMNC General Contracting08/13/2019
DOB NOWConstruction FenceSigned-offMNC General Contracting04/10/2019
BIS—ISSUEDM.N.C. General Contractors10/24/2022
BIS—ISSUEDM.N.C. General Contractors06/23/2022
BISPLISSUEDR & S Plumbing & Heating05/16/2022
BISSPISSUEDSafety Fire Sprinkler11/29/2021
BIS—ISSUEDM.N.C. General Contractors11/26/2021
BISOTISSUEDM.N.C. General Contractors10/29/2021
BIS—ISSUEDM.N.C. General Contractors10/29/2021
BISSPISSUEDSafety Fire Sprinkler12/04/2020
BISOTISSUEDM.N.C. General Contractors11/30/2020
BISPLISSUEDR & S Plumbing & Heating11/02/2020
BIS—ISSUEDM.N.C. General Contractors10/30/2020
BIS—ISSUEDM.N.C. General Contractors10/29/2020
BIS—ISSUEDM.N.C. General Contractors10/29/2020
BIS—ISSUEDM.N.C. General Contractors10/21/2020
BIS—ISSUEDM.N.C. General Contractors10/21/2020
BIS—ISSUEDM.N.C. General Contractors06/04/2019
BIS—ISSUEDM.N.C. General Contractors06/04/2019
BIS—ISSUEDPreston NYC05/06/2019
BISOTISSUEDMMJ Contracting06/23/1995
BISMHISSUEDMMJ Contracting06/20/1994
BISPLISSUEDTheodore Wagner Plumbing and Heating06/02/1992
BISOTISSUEDLM Gen. Contracting05/22/1992
BISOTISSUEDLM Gen. Contracting10/22/1991
2 projects · most recent 06/02/2022
General Wiring
FiledStatusContractorScope
06/02/2022CompleteNet Power ElectricGeneral Wiring
08/13/2019CompleteDB Electric—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/20/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/03/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
09/21/2022Fail-Final Curb Cut Non-Directive 14FailView ↗
07/12/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/03/2022Fire-Resistant Penetrations and JointsMICHAEL KARANTINIDIS, P.E.special
08/03/2022Heating SystemsMICHAEL KARANTINIDIS, P.E.special
08/03/2022HVAC-R and service water heating system controlsMICHAEL KARANTINIDIS, P.E.energy_progress
08/03/2022Maintenance informationMICHAEL KARANTINIDIS, P.E.energy_progress
08/03/2022HVAC-R and service water heating equipmentMICHAEL KARANTINIDIS, P.E.energy_progress
08/03/2022HVAC-R and service water piping design and insulationMICHAEL KARANTINIDIS, P.E.energy_progress
258 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account