← Back
Predominantly retail with other uses
3420 QUENTIN ROAD
BROOKLYN · Marine Park-Mill Basin-Bergen Beach · BIN 3212907
💬 Discuss this project
1937Year Built
2Stories
K4Building Class
R3-2Zoning
3,714 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Predominantly retail with other uses · 2,859 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 3 filings · 20 docs
Floor 1Under Construction5p · 2 filings · 20 docs
Cellar1p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BITOPI CONSULTANTS LLC104/09/2026
KEMS ENGINEERING AND CONSTRUCTION612/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TUMEN, INCGeneral Contractor207/08/2026
CT IDEAL SUPPRESSIONGeneral Contractor107/08/2026
L.J.S. PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036104/09/2026
CL ENGINEERING P.C.6781612/28/2023
Building Lifecycle
All (75)Filed (7)Permit Issued (4)Signed Off (3)Violation (15)Inspection (1)Objection (16)Special Inspection (29)
06/12/2026
Permit issued — Mechanical Systems
B01376899-I1-MS
04/15/2026
Objection raised — Other
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection raised — Other
04/15/2026
Objection resolved — Resolved
04/09/2026
Filed — Alteration
FILING FOR A NEW KITCHEN HOOD, EXHAUST FAN AND ASSOCIATED DUCT WORK AS PER PLAN SHOWS. THERE IS NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01376899-I1
04/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
03/23/2026
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
03/23/2026
Special inspection requirement — Final
KAMRUL AHSAN
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/29/2024
Signed off — Alteration
Remove one refrigeration unit on roof and legalize another on roof. Legalize split HVAC system for 1st floor commercial space to comply with ECB 39055126R and ECB 3905530J.
B00703281-I1
01/10/2024
Signed off — Alteration
Remove Gas Piping and Gas Meter related to 1st floor furnace to comply with violation 39055130J
B00703279-I1
01/10/2024
Signed off — Alteration
Removal of steel shed on roof to comply with ECB 39055131L
B00703274-I1
12/28/2023
Filed — Alteration
Remove Gas Piping and Gas Meter related to 1st floor furnace to comply with violation 39055130J
B00703279-P2
12/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/28/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
12/19/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
12/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
12/15/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/26/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
05/26/2023
Special inspection requirement — Final
Steven Bendoraitis
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
05/26/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
05/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
05/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
05/24/2023
Filed — Alteration
Remove one refrigeration unit on roof and legalize another on roof. Legalize split HVAC system for 1st floor commercial space to comply with ECB 39055126R and ECB 3905530J.
B00703281-P1
05/24/2023
Filed — Alteration
Remove Gas Piping and Gas Meter related to 1st floor furnace to comply with violation 39055130J
B00703279-P1
05/17/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
05/17/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
05/17/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
05/17/2023
Special inspection requirement — Maintenance information
Steven Bendoraitis
05/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/17/2023
Special inspection requirement — Final
Steven Bendoraitis
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
05/17/2023
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
01/13/2023
Violation issued (ECB, closed)
Construction
01/13/2023
Violation issued (ECB, closed)
Boilers
10/25/2022
Permit issued — General Construction
B00703274-I1-GC
10/11/2022
Objection resolved — Addressed
08/17/2022
Objection resolved — Addressed
07/26/2022
Objection raised — Other
07/08/2022
Permit issued — Plumbing
B00703279-I1-PL
07/07/2022
Permit issued — Mechanical Systems
B00703281-I1-MS
06/16/2022
Objection resolved — Addressed
06/16/2022
Objection resolved — Addressed
05/24/2022
Objection raised — Scope
05/24/2022
Objection raised — Energy
05/24/2022
Objection raised — Admin
05/19/2022
Objection resolved — Addressed
05/18/2022
Objection raised — Energy
05/17/2022
Objection raised — Energy
05/17/2022
Objection resolved — Addressed
05/12/2022
Filed — Alteration
Remove one refrigeration unit on roof and legalize another on roof. Legalize split HVAC system for 1st floor commercial space to comply with ECB 39055126R and ECB 3905530J.
B00703281-I1
05/12/2022
Filed — Alteration
Remove Gas Piping and Gas Meter related to 1st floor furnace to comply with violation 39055130J
B00703279-I1
05/12/2022
Filed — Alteration
Removal of steel shed on roof to comply with ECB 39055131L
B00703274-I1
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedCT IDEAL SUPPRESSION06/12/2026
DOB NOWGeneral ConstructionSigned-offTUMEN, INC10/25/2022
DOB NOWPlumbingSigned-offL.J.S. PIPING AND HEATING07/08/2022
DOB NOWMechanical SystemsSigned-offTUMEN, INC07/07/2022
1 project · most recent 04/09/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/09/2026Permit IssuedCT IDEAL SUPPRESSIONVentilation Systems
Ventilation
Captiveaire NCA16FA 2,800 CFM · Exhaust Fan ×1
2 projects · most recent 04/10/2024
General Wiring
FiledStatusContractorScope
04/10/2024CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
06/17/2022CancelledPOWER SURGE ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
04/09/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
04/07/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
03/23/2026Mechanical SystemsKAMRUL AHSANspecial
03/23/2026FinalKAMRUL AHSANprogress
12/28/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
12/28/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
12/19/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
12/19/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/26/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/26/2023Mechanical SystemsCHRISTIAN LOZADAspecial
05/26/2023FinalSteven Bendoraitisprogress
05/26/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/26/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
05/26/2023Maintenance informationSteven Bendoraitisenergy_progress
05/26/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
05/26/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
05/17/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
05/17/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
05/17/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
05/17/2023Maintenance informationSteven Bendoraitisenergy_progress
05/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/17/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
05/17/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
05/17/2023FinalSteven Bendoraitisprogress
05/17/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
Latest 25 of 29.
▾Documents — 49 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
09/03/2026B01376899-I1Request digital key ↗
08/29/2026B00703281-P1Request digital key ↗
08/29/2026B00703279-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature18
09/24/2026B00703279-P2Open ↗
09/18/2026B01376899-I1Open ↗
09/01/2026B00703274-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/24/2026B00703279-P2Open ↗
09/18/2026B01376899-I1Open ↗
09/18/2026B01376899-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/03/2026B01376899-I1Open ↗
08/29/2026B00703281-I1Open ↗
08/29/2026B00703279-P2Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026B01376899-I1Open ↗
08/29/2026B00703279-P1Open ↗
08/29/2026B00703279-P2Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00703281-I1Open ↗