RoofUnder Construction18p · 7 filings · 20 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents · 2 drawing sheets
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
On file for this job
4 documents
Modification of structural steel to support generator on 3rd floor roof.
On file for this job
7 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 193p · 2 filings · 20 docs
MechanicalPlumbing
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 2 drawing sheets
Modification of plumbing system to support emergency surge capacity renovations on floors 6, 10 & 15-18 & medical gas on floors B1 & 1-19.
On file for this job
13 documents · 1 drawing sheet
Floor 18Under Construction18p · 3 filings · 20 docs
DMMechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents · 1 drawing sheet
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 3 drawing sheets
Modification of plumbing system to support emergency surge capacity renovations on floors 6, 10 & 15-18 & medical gas on floors B1 & 1-19.
On file for this job
13 documents · 2 drawing sheets
Floor 17Under Construction20p · 4 filings · 20 docs
DMMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
TEMPORARY HOIST RUN-BACK STRUCTURE DURING BLDG RENOVATIONS, FILED SEPARATELY. RUN-BACK STRUCTURE SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
On file for this job
7 documents · 1 drawing sheet
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 16Under Construction36p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures & all associated domestic water, sanitary & vent piping and capping it back to the risers. The scope also involves removal of all existing medical gas piping & associated equipment back to the risers
On file for this job
15 documents · 8 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 15Under Construction35p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures & all associated domestic water, sanitary & vent piping and capping it back to the risers. The scope also involves removal of all existing medical gas piping & associated equipment back to the risers
On file for this job
15 documents · 8 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 3 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 14Under Construction30p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures & all associated domestic water, sanitary & vent piping and capping it back to the risers. The scope also involves removal of all existing medical gas piping & associated equipment back to the risers
On file for this job
15 documents · 8 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Floor 13Under Construction95p · 8 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Removal of plumbing fixtures & all associated domestic water, sanitary & vent piping and capping it back to the risers. The scope also involves removal of all existing medical gas piping & associated equipment back to the risers
On file for this job
15 documents · 11 drawing sheets
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents · 2 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Latest 3 of 8 filings on this floor.
Floor 12Under Construction16p · 2 filings · 18 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Structural modification consisting of new core drill openings through existing slabs and infill of existing slab openings.
On file for this job
7 documents
Floor 11Under Construction12p · 1 filing · 11 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Floor 10Under Construction24p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Mechanical modification on the 5th , 6th & 10th floor. There is no change in egress, use or occupancy.
On file for this job
29 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 9Under Construction13p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Modification of plumbing system to support emergency surge capacity renovations on floors 6, 10 & 15-18 & medical gas on floors B1 & 1-19.
On file for this job
13 documents · 1 drawing sheet
Floor 8Under Construction13p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Modification of plumbing system to support emergency surge capacity renovations on floors 6, 10 & 15-18 & medical gas on floors B1 & 1-19.
On file for this job
13 documents · 1 drawing sheet
Floor 7Under Construction23p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents · 2 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Modification of mechanical systems to support Emergency Surge Capacity renovations on floors 15-19
On file for this job
27 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 6Under Construction78p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
On file for this job
8 documents · 5 drawing sheets
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
On file for this job
4 documents
Latest 3 of 8 filings on this floor.
Floor 5Under Construction21p · 6 filings · 20 docs
MechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Structural
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Structural modification consisting of new core drill openings through existing slabs and infill of existing slab openings.
On file for this job
7 documents
Filing to replace filters with enhanced electronic filtration technology, add bipolar ionization, provide UV lighting at cooling coils, and provide fan-HEPA filter modules in dental exam rooms as part of COVID Emergency Air Qualit Improvements.
On file for this job
6 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 4Under Construction66p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
On file for this job
8 documents · 6 drawing sheets
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
On file for this job
4 documents
Latest 3 of 5 filings on this floor.
Floor 3Under Construction70p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
On file for this job
8 documents · 4 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 2Under Construction13p · 2 filings · 17 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Filing to replace filters with enhanced electronic filtration technology, add bipolar ionization, provide UV lighting at cooling coils, and provide fan-HEPA filter modules in dental exam rooms as part of COVID Emergency Air Qualit Improvements.
On file for this job
6 documents · 1 drawing sheet
Floor 1Under Construction25p · 6 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents · 1 drawing sheet
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents
Mechanical modification as shown on plans. There is no change in egress, use or occupancy.
On file for this job
17 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
CellarUnder Construction32p · 5 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Interior renovation on part of Basement 2, Basement 1, 1st 3rd, 7th, 10th, 13th floors as indicated on attached plans. There is no change to occupancy, use or egress.
On file for this job
4 documents · 7 drawing sheets
Refurbishment of Boiler #4, replacement of burners for Boiler #s 1 through 4, providing all new boiler plant controls, providing a new building wide Building Automation System (BAS)
On file for this job
11 documents · 2 drawing sheets
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
On file for this job
4 documents
Latest 3 of 5 filings on this floor.
Basement1p · 1 filing · 5 docs
Mechanical
Installation of new emergency Generator and associated mechanical equipment as indicated on plans.
On file for this job
5 documents · 1 drawing sheet
Sub-BasementUnder Construction39p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler & Plumbing modification on floors 1B, 3, 4, 6 & 13
On file for this job
8 documents
HVAC and mechanical modifications on floors Basement, 1B , 3, 4, 6 & 13.
On file for this job
4 documents
Interior renovation on floors 1B , 3, 4, 6 & 13.
On file for this job
8 documents
Latest 3 of 4 filings on this floor.