← Back
Walk-up cooperative
343 WEST 47 STREET
MANHATTAN · BIN 1025089
💬 Discuss this project
1920Year Built
4Stories
C6Building Class
R8Zoning
5,272 sfGross Floor Area
4Units
Rent Stabilized
Walk-up cooperative · Owner of record: MIDTOWN WEST 47 ST LLC · 2,510 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction30p · 1 filing · 20 docs
Floor 7Under Construction79p · 1 filing · 20 docs
Floor 6Under Construction76p · 1 filing · 20 docs
Floor 5Under Construction76p · 1 filing · 20 docs
Floor 4Under Construction82p · 1 filing · 20 docs
Floor 3Under Construction85p · 1 filing · 20 docs
Floor 2Under Construction84p · 1 filing · 20 docs
Floor 1Under Construction83p · 1 filing · 20 docs
CellarUnder Construction87p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AIRITA MANAGEMENT CORP6209/25/2026
MIDTOWN WEST 47TH ST6207/08/2026
MNK ENTERPRISES807/08/2026
343 WEST 47TH STREET1007/08/2026
RELIABLE ENTERPRISES1007/08/2026
MIDTOWN WEST 47ST LLC203/22/2026
343 W 47 ST LLC603/22/2026
AIRHAN MANAGEMENT CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A & T DESIGN GROUP LLC1088805/12/2026
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
02/13/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
02/13/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
06/11/2026Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
06/11/2026FinalROBERT LINprogress
06/11/2026MasonryROBERT LINspecial
06/11/2026Structural Steel - WeldingROBERT LINspecial
06/11/2026Post-installed AnchorsROBERT LINspecial
06/11/2026Structural Steel - High Strength BoltingROBERT LINspecial
06/11/2026Concrete - Cast-In-PlaceROBERT LINspecial
06/11/2026Structural Steel - DetailsROBERT LINspecial
06/11/2026Structural Cold-Formed SteelROBERT LINspecial
06/11/2026FinalROBERT LINprogress
06/11/2026Footing and FoundationROBERT LINprogress
06/11/2026Concrete - Cast-In-PlaceROBERT LINspecial
04/30/2026Concrete - Cast-In-PlaceROBERT LINspecial
04/30/2026FinalROBERT LINprogress
04/30/2026Structural Steel - WeldingROBERT LINspecial
04/30/2026Structural Steel - High Strength BoltingROBERT LINspecial
04/30/2026Structural Steel - DetailsROBERT LINspecial
04/30/2026Structural Cold-Formed SteelROBERT LINspecial
04/30/2026Post-installed AnchorsROBERT LINspecial
04/30/2026MasonryROBERT LINspecial
04/30/2026Concrete - Cast-In-PlaceROBERT LINspecial
04/30/2026Footing and FoundationROBERT LINprogress
04/30/2026FinalROBERT LINprogress
04/30/2026Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
09/04/2025Post-installed AnchorsROBERT LINspecial
Latest 25 of 62.
Nothing on file for this building.