← Back
BuildNYC
Two family converted from one family
3434 HUGUENOT AVENUE
BRONX · BIN 2083024
💬 Discuss this project
1925Year Built
1.75Stories
B3Building Class
R3-2Zoning
2,602 sfGross Floor Area
2Units
0 Active Violations
Two family converted from one family · 5,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Sub-BasementRenovation and addition to existing two-family dwelling5 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Errol McIntosh, R.A.507/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting Service303/21/2026
Building Lifecycle
07/14/2023
Objection raised — Other
07/12/2023
Objection raised — Admin
07/12/2023
Objection raised — Scope
07/11/2023
Filed — Alteration
PLUMBING PLANS FOR THE RENOVATION AND AN ADDITION TO EXISTING TWO FAMILY DWELLING.
X00649644-I1
07/07/2023
Objection resolved — Addressed
41 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 07/11/2023
Water/Sanitary
FiledStatusContractorScope
07/11/2023——Water/Sanitary
1 project · most recent 05/15/2023
FiledStatusContractorScope
05/15/2023———
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/13/2023Structural Stability – Alterations of existing buildings—special
05/13/2023Masonry—special
05/12/2023Concrete - Cast-In-Place—special
01/06/2022Footing and Foundation—progress
01/06/2022Final—progress
12/16/2021Final—progress
11/02/2021Fenestration and door U-factor and product ratings—energy_progress
11/02/2021Fenestration areas—energy_progress
11/02/2021Insulation placement and R values—energy_progress
11/02/2021Protection of exposed foundation insulation—energy_progress
11/02/2021Fenestration air leakage—energy_progress
11/02/2021Lighting in dwelling units—energy_progress
11/02/2021Air barrier - visual inspection—energy_progress
11/02/2021Concrete - Cast-In-Place—special
11/02/2021Excavations - Sheeting, Shoring, and Bracing—special
11/02/2021Fire-Resistant Penetrations and Joints—special
11/02/2021Masonry—special
11/02/2021Underpinning—special
08/18/2021Structural Stability – Alterations of existing buildings—special
24 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account