← Back
BuildNYC
Two family converted from one family
3438 HUGUENOT AVENUE
BRONX · BIN 2083025
💬 Discuss this project
1925Year Built
1Stories
B3Building Class
R3-2Zoning
1,734 sfGross Floor Area
2Units
17 Active Violations 15 unresolved · 2 paperwork only ▸
Two family converted from one family · 5,000 sf lot · 0.35 FAR built · Flood zone X
Locations of Work
PlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Sub-BasementMinor plumbing work4p · 1 filing · 7 docs
Filed — no permit issued2p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RLD3 Engineering306/16/2026
Nyron Hall Engineering110/08/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Designworks Consultant203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Infiniti Esc PlumbingPlumbing206/28/2026
Gonco ElectricalElectrical103/22/2026
Building Lifecycle
06/16/2026
Filed — Alteration
INSTALLATION OF ELECTRIC SMART TANK Proterra 50, AND GAS TANKLES WATER HEATER. REMOVAL OF OLD BOILER, RELOCATE WASHER & DRYER
X01106440-P2
04/27/2026
Filed — Alteration
INSTALLATION OF ELECTRIC SMART TANK Proterra 50, AND GAS TANKLES WATER HEATER. REMOVAL OF OLD BOILER, RELOCATE WASHER & DRYER
X01106440-P1
02/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/20/2026
Permit renewed — Plumbing
Renewed without changes
X01106440-I1-PL
11/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
33 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing02/20/2026
DOB NOWPlumbingPermit IssuedInfiniti Esc Plumbing02/04/2025
1 project · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Permit IssuedInfiniti Esc PlumbingGas, Water/Sanitary
1 project · most recent 11/08/2024
General Wiring
FiledStatusContractorScope
11/08/2024CompleteGonco ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
18 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account