← Back
Condo, residential unit in elevator building
344 WEST 23 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1013385
💬 Discuss this project
1985Year Built
9Stories
R4Building Class
C1-6AZoning
41,918 sfGross Floor Area
44Units
LL97 CoveredRent Stabilized12 Open Violations 11 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential unit in elevator building · Owner of record: 358 W 23RD ST CONDOMINIUM · 7,406 sf lot · 5.66 FAR built · Flood zone X
Locations of Work
ArchitectureEquipment
Roof2p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VINTAGE REAL ESTATE SERVICES907/08/2026
KINGS GROUP NY CORP1003/22/2026
TARANTO & ASSOCIATES I103/22/2026
358 W 23 ST CONDO.103/22/2026
VEZANDIO CONTRACTING203/21/2026
SANDBERG MANAGEMENT403/21/2026
344 WEST 23RD ST ASSOC203/21/2026
344 WEST 23 STREET CONDOMINIUM1803/21/2026
358 WEST 23RD STREET CONDOMINIUM103/21/2026
344 W 23RD ST CONDO C OWAVECREST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIERARCH-E203/21/2026
JULIAN A. GOMEZ203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor603/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor303/21/2026
JEANNETTE GONZALEZElectrical203/21/2026
DANIEL WEISSMANElectrical103/21/2026
HENRY KHODOSHElectrical103/21/2026
MICHAEL OLIVOElectrical103/21/2026
WEISSMAN DANIELElectrical103/21/2026
ALPHA CONTRACTING CORPGeneral Contractor107/08/2026
MC SUPERSTRUCTURE INCGeneral Contractor107/08/2026
PENTA RESTORATION CORPGeneral Contractor107/08/2026
STREETS & AVENUES DEVELOPGeneral Contractor107/08/2026
P.S.I. MECHANICALPlumbing107/08/2026
AMOR ELECTRIC CORPElectrical103/22/2026
ZFM INCPlumbing107/08/2026
B C PAINTING CORPElectrical103/21/2026
BDS ELECTRIC CORP.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266106/07/2023
VERTICAL LLC8740106/07/2023
Building Lifecycle
All (96)Filed (9)Permit Issued (9)Signed Off (8)Facade (FISP) (12)Violation (47)Inspection (5)Special Inspection (6)
01/07/2025
Signed off — Alteration
REPLACE BATHROOM AND KITCHEN PLUMBING FIXTURES IN SITUE.
M00831708-I1
11/22/2024
Violation issued (HPD, closed)
I
07/01/2024
Signed off — Alteration
Suspended scaffold installation as per plans filed herewith.
M00807020-I1
05/28/2024
Signed off — Alteration
REPLACE BATHROOM AND KITCHEN PLUMBING FIXTURES IN SITUE.
M00831708-S1
01/05/2024
Signed off — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00875566-I1
12/04/2023
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M00807020-S1
09/15/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00003259-I1
09/11/2023
Permit issued — Sidewalk Shed
M00875566-I1-SH
08/29/2023
Signed off — Alteration
INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00144039-I1
08/25/2023
Permit issued — General Construction
M00807020-I1-GC
07/26/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/07/2023
Filed — Alteration
Suspended scaffold installation as per plans filed herewith.
M00807020-I1
05/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/18/2023
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00875566-I1
05/18/2023
Permit issued — Sidewalk Shed
M00875566-I1-SH
04/03/2023
Special inspection requirement — Masonry
John Monroe
04/03/2023
Special inspection requirement — Final
Michael Larkin
03/16/2023
Special inspection requirement — Tenant Protection Plan Compliance
MUHAMMAD HUQ
03/14/2023
Permit issued — Plumbing
M00831708-S1-PL
03/09/2023
Filed — Alteration
REPLACE BATHROOM AND KITCHEN PLUMBING FIXTURES IN SITUE.
M00831708-S1
03/07/2023
Permit issued — General Construction
M00831708-I1-GC
02/28/2023
Filed — Alteration
REPLACE BATHROOM AND KITCHEN PLUMBING FIXTURES IN SITUE.
M00831708-I1
02/18/2023
Special inspection requirement — Final
WILLIAM MUIR
01/18/2023
Signed off — Alteration
OT: Remove/ Replace Interior Partitions, Doors, Ceilings, Millwork, and Flooring. No change in Use, Occupancy, or Egress.
M00695685-I1
01/03/2023
Special inspection requirement — Post-installed Anchors
John Monroe
08/30/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2022
Signed off — Alteration
M00695744-I1
07/21/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2022
Permit issued — Plumbing
M00695744-I1-PL
03/23/2022
Permit issued — General Construction
M00695685-I1-GC
03/16/2022
Filed — Alteration
OT: Remove/ Replace Interior Partitions, Doors, Ceilings, Millwork, and Flooring. No change in Use, Occupancy, or Egress.
M00695685-I1
03/16/2022
Filed — Alteration
M00695744-I1
03/10/2022
Special inspection requirement — Final
LAZAR KESIC
02/16/2022
Violation issued (HPD, closed)
A
12/23/2021
Cycle 9 facade report submitted
12/22/2021
Cycle 9 facade report signed — SWARMP
12/09/2021
Cycle 9 facade inspection completed
04/01/2021
Violation issued (HPD, closed)
A
02/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/27/2019
Permit issued — Sidewalk Shed
M00144039-I1-SH
03/26/2019
Filed — Alteration
INSTALL HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2014 NYC BUILDING CODE.
M00144039-I1
01/23/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/10/2018
Violation issued (HPD, closed)
I
03/06/2018
Violation issued (ECB, closed)
Construction
11/30/2017
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00003259-I1
11/30/2017
Permit issued — Sidewalk Shed
M00003259-I1-SH
11/06/2017
Violation issued (HPD, closed)
I
05/10/2017
Cycle 8 facade report signed — SWARMP
02/16/2017
Cycle 8 facade report submitted
01/19/2017
Cycle 8 facade inspection completed
04/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/02/2015
Violation issued (HPD, closed)
I
05/30/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/09/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offMC SUPERSTRUCTURE INC09/11/2023
DOB NOWGeneral ConstructionSigned-offPENTA RESTORATION CORP08/25/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING05/18/2023
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC03/14/2023
DOB NOWGeneral ConstructionSigned-offALPHA CONTRACTING CORP03/07/2023
DOB NOWPlumbingSigned-offP.S.I. MECHANICAL04/22/2022
DOB NOWGeneral ConstructionSigned-offSTREETS & AVENUES DEVELOP03/23/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP03/27/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/30/2017
BISPLISSUEDORBIT PLBG & HTG INC02/06/2018
BISOTISSUEDREYCO SERVICES LLC01/23/2018
BISOTISSUEDPREMIERONE RESTORATION IN01/12/2018
BISOTISSUEDPREMIERONE REST. INC02/10/2012
BISEQISSUEDVEZANDIO CONTRACTING CORP11/18/2011
BISOTISSUEDP & J RENOVATIONS INC09/30/2011
BISPLISSUEDJ & R P/H CONT INC07/20/2006
BISOTISSUEDPIER HEAD ASSOCIATES06/28/2006
BISOTISSUEDBREND RENOVATION CORP04/17/2006
BISPLISSUEDR.J.C. MECHANICAL CORP04/14/2006
BISMHISSUEDCAPITAL CRAFTSMEN, INC03/14/2006
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/23/2006
BISOTISSUEDMIGHTIGALE CONSTR. INC.02/17/2005
BISOTISSUEDPIER HEAD ASSOCIATES01/19/2005
BISPLISSUEDSEAVIEW PLUMBING INC11/29/2004
BISOTISSUEDPIER HEAD ASSOCIATES11/26/2004
BISOTISSUEDCUSTOM CAS07/16/2004
BISPLISSUEDJEFFREY VULPIS PLMBNG LLC02/05/2003
BISPLISSUEDZEFI PLBG AND HTG INC01/21/2003
BISOTISSUEDBENCH MARK INTERIORS INC03/13/2001
BISOTISSUEDDSA BUILDERS INC11/01/1999
BISEQISSUEDSPRING ENTERPRISES INC05/16/1995
BISOTISSUEDWOLF INSTALLATIONS INC12/05/1994
17 projects · most recent 06/26/2026
General Wiring Lighting
FiledStatusContractorScope
06/26/2026Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
05/21/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
03/18/2026CompleteIKAROS ELECTRICAL ENT INC—
01/22/2026Pending PaymentAMOR ELECTRIC CORPGeneral Wiring
11/06/2025CompleteAMOR ELECTRIC CORPGeneral Wiring
08/01/2025CompleteFALCO ELEC'L SERVICES INCGeneral Wiring
06/10/2025CompleteAMOR ELECTRIC CORPGeneral Wiring
01/01/2024CompleteDISCOVER ELEC COMPANY INC—
12/12/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
12/11/2023CompleteDISCOVER ELEC COMPANY INC—
07/24/2023CompleteNASH ELECTRIC SERVICES IN—
05/18/2022Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
05/12/2022CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
11/13/2020CompleteY.S ELECTRICGeneral Wiring, Lighting
03/21/2019Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 12/04/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/04/2023Signed-offPENTA RESTORATION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/21/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/03/2023MasonryJohn Monroespecial
04/03/2023FinalMichael Larkinprogress
03/16/2023Tenant Protection Plan ComplianceMUHAMMAD HUQspecial
02/18/2023FinalWILLIAM MUIRprogress
01/03/2023Post-installed AnchorsJohn Monroespecial
03/10/2022FinalLAZAR KESICprogress
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch8
09/06/2026M00003259-I1Request digital key ↗
09/02/2026M00695685-I1Request digital key ↗
09/02/2026M00695744-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00144039-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
02/06/2018123170031Open ↗
01/23/2018123170031Open ↗
01/12/2018123275669Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
12/19/2017123170031Open ↗
11/21/2017123275669Open ↗
01/18/2012120949117Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00003259-I1Open ↗
09/02/2026M00695685-I1Open ↗
09/02/2026M00695744-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
01/23/2018123170031Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
11/21/2017123275669Open ↗
11/14/2011120891151Open ↗
10/06/2011120840705Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026M00831708-I1Open ↗
08/31/2026M00695685-I1Open ↗
08/23/2026M00807020-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/14/2011120891151Open ↗
10/06/2011120840705Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026M00807020-I1Open ↗
08/23/2026M00807020-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/21/2017123275669Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
10/14/2011120840705Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/19/2017123170031Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
12/19/2017123170031Open ↗
11/21/2017123275669Open ↗
▸Environmental & Asbestos8
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
01/18/2012120949117Open ↗
10/06/2011120840705Open ↗
10/06/2011120840705Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00695685-I1Open ↗
09/02/2026M00695744-I1Open ↗
08/31/2026M00807020-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/19/2017123170031Open ↗
11/22/2017123275669Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
01/23/2018123170031Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
08/29/2013120949117Open ↗
▸BISTECHNICAL REPORT: ENERGY2
01/18/2012120949117Open ↗
10/06/2011120840705Open ↗
▸Inspections & Test Reports1
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
09/26/2018123170031Open ↗
▸Approvals, Objections & Sign-offs9
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
08/29/2013120949117Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
09/26/2018123170031Open ↗
09/26/2018123170031Open ↗
08/29/2013120949117Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
01/18/2012120949117Open ↗
11/14/2011120891151Open ↗
10/06/2011120840705Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
12/19/2017123170031Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
12/19/2017123170031Open ↗
11/21/2017123275669Open ↗
01/18/2012120949117Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
09/26/2018123170031Open ↗
05/25/2018123275669Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications1
08/13/2026M00807020-S1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00003259-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00807020-S1Open ↗