Office, 20+ stories, with or without commercial
345 7 AVENUE
MANHATTAN · BIN 1015137
💬 Discuss this project
1928Year Built
25Stories
O4Building Class
M1-9A/R12Zoning
190,325 sfGross Floor Area
72Units
LL97 Covered3 Open Violations ▸FISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 345 7TH AVENUE REALTY OWNER LLC · 7,714 sf lot · 24.67 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 2 docs
Floor 209p · 2 filings · 7 docs
Floor 19
Floor 187p · 1 filing · 14 docs
Floor 17
Floor 16
Floor 15
Floor 149p · 2 filings · 7 docs
Floor 13
Floor 12
Floor 11
Floor 10
Floor 98p · 2 filings · 12 docs
Floor 82p · 2 filings · 7 docs
Floor 7Under Construction6p · 1 filing · 6 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 12p · 2 filings · 5 docs
Mezzanine3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8203 3RD AVE PROPERTY109/13/2026
345 7TH AVENUE REALTY OWNER1108/30/2026
BERNSTEIN REAL ESTATES6707/08/2026
GSR CONTRACTOR407/08/2026
EMPIRE CAPITAL HOLDINGS2407/08/2026
PARK CONTRACTING GROUP404/09/2026
VENUS CONSTRUCTION703/22/2026
345 7TH AVENUE11003/22/2026
345 7 AVE LLC403/22/2026
EMPIRE 345 SEVENTH LLC103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS1403/21/2026
SHEIKH EXPEDITING403/21/2026
SMEP DESIGN & CONSULTATION LLC203/21/2026
INDESIGN STUDIO203/21/2026
BUILDING VIOLATION SOLUTIONS2203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
AE DESIGN SOLUTION603/21/2026
EA DESIGN GROUP1203/21/2026
VINCENT J. LIOTTA P.E.103/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVEREST SCAFFOLDING INCGeneral Contractor807/08/2026
NATIONAL MAINTENANCEScaffold807/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor603/21/2026
PHASE 3 INTERIORS LLCGeneral Contractor507/08/2026
REEM PLBG & HTG CORPPlumbing407/08/2026
MOREAIR MECHANICAL SERVICGeneral Contractor407/08/2026
PREMIER SANITATION LLCGeneral Contractor303/21/2026
AZARK INCGeneral Contractor303/21/2026
LV CONTRACTING SOLUTIONSGeneral Contractor303/21/2026
REEM PLBG & HTG CORPFire Protection207/08/2026
JOHN CORBETTElectrical203/21/2026
GRUSHINSKY PIPNG & HTG INFire Protection207/08/2026
RELIABLE PLBG & HTG CORPPlumbing207/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
PARK CONTRACTING GROUPGeneral Contractor104/09/2026
ALL PRO PLBG & HTG INCPlumbing107/03/2026
ENA PLUMBING CORPPlumbing107/08/2026
DENNISON ELECTRIC CORPElectrical103/22/2026
UNITECH DESIGNScaffold105/27/2026
GAY JR, TIMOTHYElectrical103/21/2026
HERNANDEZ, GEORGEElectrical103/21/2026
HV ELECTRIC CORPElectrical103/22/2026
RICHARD NEUElectrical103/21/2026
ROBERT S. COVELLOElectrical103/22/2026
SALVATORE FILOTEOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUMTAZ ENTERPRISES9459202/18/2026
CHARLES G MICHEL ENGINEER2871101/07/2026
YAN GAO6619112/11/2023
CROSSCHECK INSPECTION SER544809/13/2022
THOMAS VELTRE, P.E, P.C.459406/30/2020
VINCENT J. LIOTTA P. E.1974110/31/2019
Building Lifecycle
All (246)Filed (44)Permit Issued (49)Signed Off (22)Facade (FISP) (15)Violation (60)Inspection (12)Objection (14)Special Inspection (30)
08/28/2026
Permit issued — Mechanical Systems
M01321167-I1-MS
08/18/2026
Signed off — Alteration
M01357705-I1
06/26/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01222264-I1
06/19/2026
Filed — Alteration
PROPOSE NEW ILLUMINATED CHANNEL LETTERS ON ALUMINUM RACEWAY FOR EXISTING COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01410360-I1
06/01/2026
Special inspection requirement — Final
YUNHO LEE
05/08/2026
Permit issued — Sign
M01393564-I1-SG
05/05/2026
Filed — Alteration
PROPOSED INSTALLATION OF 1 ILLUMINATED NON-FLASHING ACCESSORY BUSINESS SIGN. WORDING "Haagen-Dazs"
M01393564-I1
04/27/2026
Special inspection requirement — Final
JUSTIN KIM
04/17/2026
Signed off — Alteration
FILING TO REFURBISH EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00922809-I1
04/06/2026
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01336145-I1
03/20/2026
Permit issued — Plumbing
M01357705-S1-PL
03/13/2026
Permit issued — General Construction
M01357705-I1-GC
03/04/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/18/2026
Filed — Alteration
M01357705-I1
02/18/2026
Filed — Alteration
M01357705-S1
02/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
02/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
02/09/2026
Special inspection requirement — Final
Mumtaz Hussain
01/24/2026
Permit issued — General Construction
M01336145-I1-GC
01/07/2026
Filed — Alteration
THE INSTALLATION AND RELOCATION OF FAN COIL UNITS AS PER THE PLANS FILED HEREWITH; NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01321167-I1
01/02/2026
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE ON FIRST FLOOR ONLY: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01336145-I1
12/31/2025
Special inspection requirement — Maintenance information
Charles Michel
12/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Charles Michel
12/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Charles Michel
12/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Charles Michel
12/22/2025
Permit issued — Sidewalk Shed
M01323927-I1-SH
11/26/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01323927-I1
11/18/2025
Special inspection requirement — Mechanical Systems
Charles Michel
11/18/2025
Special inspection requirement — Final
Charles Michel
08/27/2025
Violation issued (ECB, open)
Construction
07/11/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01222264-I1
07/11/2025
Permit issued — Suspended Scaffold
M01222264-I1-SC
06/11/2024
Signed off — Alteration
MECHANICAL WORK INCONJUNTION APPLICATION # M00607960
M00797300-I1
05/02/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/29/2024
Permit issued — Sprinklers
M00737805-I1-EW-SP
03/28/2024
Signed off — Alteration
M00737772-I1
01/17/2024
Objection raised — Other
01/17/2024
Objection resolved — Addressed
12/14/2023
Objection raised — Admin
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection raised — Admin
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection raised — Admin
12/14/2023
Objection resolved — Addressed
12/14/2023
Objection raised — Admin
12/14/2023
Objection resolved — Addressed
12/11/2023
Filed — Alteration
ERECT AN ILLUMINATED SIGN ON WALL. NOT WITHIN VIEW OF ARTERIAL HIGHWAY OR PUBLIC PARK 1/2 ACRE OR MORE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00974152-I1
12/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
YAN GAO
12/08/2023
Special inspection requirement — Final
YAN GAO
11/16/2023
Violation issued (ECB, closed)
Construction
10/17/2023
Permit issued — General Construction
M00730893-I1-GC
09/05/2023
Signed off — Alteration
Structural renovations for new awning. No change in use, egress or occupancy.
M00737743-I1
08/30/2023
Permit issued — General Construction
M00922809-I1-GC
08/23/2023
Filed — Alteration
FILING TO REFURBISH EXISTING 1ST FLOOR COMMERCIAL SPACE AS PER PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00922809-I1
08/21/2023
Special inspection requirement — Final
FAZAL BANGASH
08/04/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2023
Signed off — Alteration
Architectural modifications as per plans. No change to use, egress or occupancy.
M00607960-I1
Latest 60 of 246 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMECHANICAL EAST CO.,INC08/28/2026
DOB NOWSignSigned-offUNITECH DESIGN INC05/08/2026
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/20/2026
DOB NOWGeneral ConstructionSigned-offKHAWAJA RESTORATION03/13/2026
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC01/24/2026
DOB NOWSidewalk ShedPermit IssuedPARK CONTRACTING GROUP12/22/2025
DOB NOWSuspended ScaffoldSigned-offSTRUCTUAL PRESV SYSTEM07/11/2025
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN03/29/2024
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC10/17/2023
DOB NOWGeneral ConstructionSigned-offLV CONTRACTING SOLUTIONS08/30/2023
DOB NOWStructuralSigned-offPHASE 3 INTERIORS LLC06/28/2023
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN03/08/2023
DOB NOWSidewalk ShedPermit IssuedGSR CONTRACTOR INC11/15/2022
DOB NOWPlumbingSigned-offENA PLUMBING CORP10/13/2022
DOB NOWMechanical SystemsSigned-offAZARK INC10/07/2022
DOB NOWGeneral ConstructionPermit IssuedPHASE 3 INTERIORS LLC09/06/2022
DOB NOWMechanical SystemsSigned-offPHASE 3 INTERIORS LLC09/06/2022
DOB NOWSprinklersSigned-offRELIABLE PLBG & HTG CORP09/01/2022
DOB NOWSprinklersPermit IssuedFIVE BOROUGH NYC LLC09/01/2022
DOB NOWPlumbingSigned-offRELIABLE PLBG & HTG CORP08/31/2022
DOB NOWGeneral ConstructionSigned-offARIEL CONSULTANTS LLC08/30/2022
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC03/11/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/14/2021
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC09/14/2021
DOB NOWMechanical SystemsPermit IssuedMOREAIR MECHANICAL SERVIC11/20/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC10/31/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC10/09/2020
DOB NOWMechanical SystemsPermit IssuedMOREAIR MECHANICAL SERVIC08/17/2020
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC06/30/2020
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG03/16/2020
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC03/11/2020
DOB NOWSprinklersSigned-offREEM PLUMBING & HEATING C03/03/2020
DOB NOWSprinklersPermit IssuedREEM PLBG & HTG CORP02/28/2020
DOB NOWPlumbingPermit IssuedREEM PLBG & HTG CORP02/28/2020
DOB NOWSprinklersSigned-offREEM PLUMBING & HEATING C02/06/2020
DOB NOWSprinklersPermit IssuedREEM PLBG & HTG CORP02/05/2020
DOB NOWPlumbingPermit IssuedWATSON'S PLBG, HTG, & BDG12/24/2019
DOB NOWMechanical SystemsSigned-offMOREAIR MECHANICAL SERVIC11/01/2019
DOB NOWPlumbingSigned-offREEM PLBG & HTG CORP10/03/2019
DOB NOWSupported ScaffoldSigned-offEVEREST SCAFFOLDING INC07/24/2019
+ 59 more permits on file
1 project · most recent 02/10/2020
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
02/10/2020Permit IssuedMOREAIR MECHANICAL SERVICAir Conditioning Systems, Associated Ducts and Piping
Cooling
Trane TTA090H 90,000 BTU · Condensing Unit ×4
TWE09043B 95,050 BTU · Ahu ×4
4 projects · most recent 09/13/2022
FiledStatusContractorScope
09/13/2022———
08/26/2022Permit IssuedFIVE BOROUGH NYC LLC28 heads
07/06/2022Signed-offGRUSHINSKY PIPNG & HTG IN4 heads
02/10/2020Permit IssuedREEM PLBG & HTG CORP37 heads
5 projects · most recent 09/13/2022
Water/Sanitary
FiledStatusContractorScope
09/13/2022Signed-offENA PLUMBING CORPWater/Sanitary
08/26/2022Signed-offRELIABLE PLBG & HTG CORPWater/Sanitary
02/10/2020Signed-offREEM PLUMBING & HEATING CWater/Sanitary
12/18/2019Permit IssuedWATSON'S PLBG, HTG, & BDGWater/Sanitary
07/29/2019Signed-offREEM PLBG & HTG CORPWater/Sanitary
25 projects · most recent 08/06/2026
General Wiring Lighting
FiledStatusContractorScope
08/06/2026Permit IssuedATMOS ELECTRIC SVCE CORPGeneral Wiring
07/31/2026CompleteHIVOLTS ELECTRICAL INC—
07/09/2026Permit IssuedVOLTRON ELECTRIC LLC—
07/07/2026Permit IssuedVOLTRON ELECTRIC LLC—
04/02/2026CompletePAPPAS & FODERA ELECT'LGeneral Wiring
03/13/2026CompleteATMOS ELECTRIC SVCE CORPGeneral Wiring
12/22/2025Permit IssuedRICHARD NEU—
08/08/2023Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
11/16/2022Permit IssuedRICHARD NEU—
10/11/2022Permit IssuedSTABILITY ELEC ENTERP INCGeneral Wiring
05/31/2022Permit IssuedLINTECH ELECTRIC, INCGeneral Wiring
01/31/2020Permit IssuedH. & L. ELECTRIC INCGeneral Wiring
08/15/2019Permit IssuedROBERT S. COVELLO—
07/19/2019CompleteBOROWIDE ELECT'L CONTR'S—
06/27/2019Permit IssuedHV ELECTRIC CORPGeneral Wiring
1 project · most recent 11/26/2025
Sidewalk Shed
FiledStatusContractorScope
11/26/2025Permit IssuedPARK CONTRACTING GROUPSidewalk Shed
1 project · most recent 07/11/2025
FiledStatusContractorScope
07/11/2025Signed-offSTRUCTUAL PRESV SYSTEM—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/04/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/02/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/04/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
06/01/2026FinalYUNHO LEEprogress
04/27/2026FinalJUSTIN KIMprogress
02/13/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
02/09/2026Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
02/09/2026FinalMumtaz Hussainprogress
12/31/2025Maintenance informationCharles Michelenergy_progress
12/31/2025HVAC-R and service water heating system controlsCharles Michelenergy_progress
12/31/2025HVAC-R and service water piping design and insulationCharles Michelenergy_progress
12/31/2025HVAC-R and service water heating equipmentCharles Michelenergy_progress
11/18/2025Mechanical SystemsCharles Michelspecial
11/18/2025FinalCharles Michelprogress
12/08/2023Structural Stability – Alterations of existing buildingsYAN GAOspecial
12/08/2023FinalYAN GAOprogress
08/21/2023FinalFAZAL BANGASHprogress
09/25/2022FinalEUGENE BIFULCOprogress
09/09/2022FinalEUGENE BIFULCOprogress
08/23/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/23/2022Heating SystemsEUGENE BIFULCOspecial
08/22/2022Sprinkler SystemsEUGENE BIFULCOspecial
08/22/2022Mechanical SystemsEUGENE BIFULCOspecial
08/22/2022FinalEUGENE BIFULCOprogress
07/06/2022Interior lighting powerEUGENE BIFULCOenergy_progress
07/06/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/06/2022Energy Code Compliance InspectionsEUGENE BIFULCOprogress
07/06/2022Lighting controlsEUGENE BIFULCOenergy_progress
Latest 25 of 54.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MinigrowRetailFloor 1
Project M00002044 Alteration · LOC Issued · 12/07/2017
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,483 on file (BIS + DOB NOW)
▸Plans & Drawings46
▸DOB NOWPlans/Sketch30
09/06/2026M00002044-I1Request digital key ↗
09/06/2026M00066151-I1Request digital key ↗
09/06/2026M00066126-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00190919-I1Request digital key ↗
09/05/2026M00269315-I1Request digital key ↗
09/05/2026M00306069-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/05/2026M00196074-I1Request digital key ↗
09/05/2026M00329996-I1Request digital key ↗
09/04/2026M00407420-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00234907-I1Request digital key ↗
09/05/2026M00306069-S1Request digital key ↗
09/04/2026M00364125-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00306069-I1Request digital key ↗
09/05/2026M00320309-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00196049-I1Request digital key ↗
09/04/2026M00421078-I1Request digital key ↗
▸Applications & Permits282
▸BISPLAN / WORK APPROVAL APPLICATION172
10/16/2023102720067Open ↗
10/13/2023102720067Open ↗
10/12/2023102720067Open ↗
Showing 3 of 172 on file for this type
▸BISWORK PERMIT APPLICATION103
10/05/2020140961305Open ↗
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
Showing 3 of 103 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
05/19/2020123661037Open ↗
05/19/2020123661037Open ↗
05/15/2020123796366Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWState DEC Permit1
09/05/2026M00190919-I1Open ↗
▸Seals & Professional Certifications375
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION155
03/25/2020123735814Open ↗
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
Showing 3 of 155 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST53
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
01/21/2020123796295Open ↗
Showing 3 of 53 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT47
10/03/2020140961305Open ↗
01/29/2020123701422Open ↗
01/21/2020123796295Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/06/2026M00002044-I1Open ↗
09/06/2026M00066126-I1Open ↗
09/06/2026M00066168-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
09/03/2026M00066151-I1Open ↗
09/02/2026M01321167-I1Open ↗
09/02/2026M01321167-I1Open ↗
Showing 3 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026M01321167-I1Open ↗
09/02/2026M00797262-I1Open ↗
09/02/2026M00797300-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/03/2020140961305Open ↗
12/18/2019140879556Open ↗
Showing 2 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/03/2020140961305Open ↗
12/18/2019140879556Open ↗
Showing 2 of 8 on file for this type
▸BISProfessional and Owner Certification (POC3)2
03/02/2020123796366Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment106
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE26
06/20/2019123595029Open ↗
Showing 1 of 26 on file for this type
▸BISEQUIPMENT USE PERMITS23
03/09/2023122284269Open ↗
07/31/2020123411076Open ↗
07/31/2020123411076Open ↗
Showing 3 of 23 on file for this type
▸BISSCHEDULE B - PLUMBING20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT16
07/31/2020123411076Open ↗
07/18/2020123411076Open ↗
03/25/2020123735814Open ↗
Showing 3 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
12/20/2022123462047Open ↗
10/29/2020123663160Open ↗
Showing 2 of 6 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/09/2023122284269Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTENANT PROTECTION PLAN AND NOTES7
10/03/2020140961305Open ↗
12/13/2019123865353Open ↗
06/28/2019123781666Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos108
▸BISASBESTOS: CERTIFICATION (DEP ACP5)49
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
01/21/2020123796295Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/06/2026M00002044-I1Open ↗
09/06/2026M00066142-I1Open ↗
09/05/2026M00190919-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance125
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS73
03/25/2020123735814Open ↗
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
Showing 3 of 73 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS31
01/27/2021123781666Open ↗
10/13/2020123506152Open ↗
09/04/2020123796295Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
10/13/2020123506152Open ↗
09/04/2020123796295Open ↗
07/18/2020123411076Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
12/18/2019140879556Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
09/02/2026M00730899-I1Open ↗
08/13/2026M00737772-I1Open ↗
08/13/2026M00730893-I1Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
03/09/2023122284269Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY19
03/13/2023122284269Open ↗
08/29/2022140961305Open ↗
01/27/2021123781666Open ↗
Showing 3 of 19 on file for this type
▸BISMECHANICAL SYSTEMS1
03/09/2023122284269Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs107
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST54
07/12/2023123007691Open ↗
07/12/2023123506152Open ↗
07/12/2023123462047Open ↗
Showing 3 of 54 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
10/16/2023102720067Open ↗
10/13/2023102720067Open ↗
10/12/2023102720067Open ↗
Showing 3 of 11 on file for this type
▸BISFINAL2
03/09/2023122284269Open ↗
08/29/2022140961305Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership129
▸BISCOST AFFIDAVIT124
01/27/2021123781666Open ↗
10/13/2020123506152Open ↗
10/13/2020123506152Open ↗
Showing 3 of 124 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
07/12/2023123007691Open ↗
07/12/2023123462047Open ↗
05/16/2023121619301Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms154
▸BISEFILING COVER SHEET85
03/02/2020123796366Open ↗
01/29/2020123701422Open ↗
01/22/2020123796295Open ↗
Showing 3 of 85 on file for this type
▸BISBOROUGH INTAKE FORM36
03/25/2020123735814Open ↗
08/21/2019123902349Open ↗
07/24/2019120395429Open ↗
Showing 3 of 36 on file for this type
▸BISADDITIONAL INFORMATION25
10/18/2023102720067Open ↗
07/15/2019123146620Open ↗
07/15/2019123146620Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
10/03/2020140961305Open ↗
12/18/2019140879556Open ↗
Showing 2 of 8 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/18/2019140879556Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01222264-I1Open ↗