← Back
BuildNYC
Elevator cooperative
345 BAY RIDGE PARKWAY
BROOKLYN · Bay Ridge · BIN 3148286
💬 Discuss this project
1929Year Built
6Stories
D4Building Class
R5BZoning
35,280 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized73 Active Violations 6 likely answered 1 old, status unconfirmed ▸FDNY Report ↗
Elevator cooperative · 9,400 sf lot · 3.75 FAR built · Flood zone X
Locations of Work
Architecture
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Unit 5H2p · 1 filing · 20 docs
Floor 4Unit 4H2p · 1 filing · 20 docs
Floor 3Unit 3H2p · 1 filing · 20 docs
Floor 2
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Eoc-NY406/09/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MMSR Consulting Group803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
United Construction and DesignGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Eoc-NY6548406/09/2023
Building Lifecycle
09/29/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/23/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT PUBLIC HALL, 1st STORY
HPD violation · closed
01/23/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY
HPD violation · closed
01/07/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT BUILDING VESTIBULE DOOR AT PUBLIC HALL, 1st STORY
HPD violation · closed
11/15/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER BALANCE AT LOWER SASH WINDOW. 2ND WINDOW AT NORTH IN THE 3rd ROOM FROM…
HPD violation · closed
176 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offUnited Construction06/21/2023
1 project · most recent 06/09/2023
Gas Water/Sanitary
FiledStatusContractorScope
06/09/2023——Gas, Water/Sanitary
1 project · most recent 04/29/2023
General Wiring
FiledStatusContractorScope
04/29/2023Permit IssuedClairmont Electrical ContractingGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/09/2023Insulation placement and R valuesDavid Merabyanenergy_progress
06/09/2023Fire-Resistance Rated ConstructionDavid Merabyanprogress
06/09/2023Energy Code Compliance InspectionsDavid Merabyanprogress
06/09/2023Interior lighting powerDavid Merabyanenergy_progress
06/08/2023Fire-Resistant Penetrations and JointsDavid Merabyanspecial
06/08/2023Fire-Resistant Penetrations and JointsDavid Merabyanspecial
06/08/2023FinalDavid Merabyanprogress
06/08/2023Fire-Resistant Penetrations and JointsDavid Merabyanspecial
06/08/2023Fire-Resistant Penetrations and JointsDavid Merabyanspecial
21 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account