Elevator apt, fireproof without stores
Lafayette (NYCHA)
345 CLASSON AVENUE · BIN 3321866
💬 Discuss this project
1965Year Built
20Stories
D3Building Class
R7-1Zoning
827,000 sfGross Floor Area
882Units
LL97 Covered6 Open Violations 3 unresolved · 3 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 313,570 sf lot · 2.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Permit Issued — active, not yet Signed-off
Roof9p · 4 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
CellarUnder Construction66p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA6307/08/2026
AMERICAN VENTILATION SERVICES804/09/2026
NYC HOUSING AUTHORITY4003/22/2026
NYC HOUSING AUTHORITY 9103/22/2026
NYCHA 99203/22/2026
NEELAM CONSTRUCTION CORP.103/21/2026
NYC HOUSING AUTH403/21/2026
SKYWORX CONTRACTING303/21/2026
NYCHA NY HOUSING AUTHORITY203/21/2026
NEW YORK CITY HOUSING AUTHORITY303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.103/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
STEPHEN B JACOBS GROUP2203/21/2026
AK CONSULTING SERVICES403/21/2026
HIERARCH-E603/21/2026
JOEL PHAGOO P.E. PLLC103/21/2026
LGML GROUP103/21/2026
JOEL PHAGOO P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC MECHANICAL INCGeneral Contractor1107/08/2026
J & N CONSTRUCTION GROUPGeneral Contractor807/08/2026
FJP MECHANICAL INCPlumbing307/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891011/18/2025
SOCOTEC ENGINEERING4983509/11/2025
JOEL PHAGOO ,PE, PLLC2416303/07/2025
AK CONSULTING SERVICES, I6198211/15/2024
TECTONIC ENGINEERING CONS106106/27/2024
MT GROUP798104/15/2024
KMB DESIGN GROUP, LLC513105/14/2019
Building Lifecycle
All (188)Filed (31)Permit Issued (29)Signed Off (8)Facade (FISP) (18)Violation (30)Inspection (14)Objection (28)Special Inspection (30)
08/10/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/10/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/20/2026
Permit issued — Mechanical Systems
B00994757-S2-MS
03/17/2026
Permit issued — Construction Fence
B01279621-S2-FN
03/17/2026
Permit issued — Structural
B00994757-S1-ST
03/17/2026
Permit issued — General Construction
B00994757-I1-GC
03/17/2026
Permit issued — General Construction
B01279621-S4-GC
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/12/2026
Filed — Alteration
NYCHA LAFAYETTE HOUSES (BUILDING #2), INSTALLATION OF A 18285-GALLON OIL TANK CONNECTED TO MOBILE BOILER TRAILERS (QTY: 02) SUBMITTING ON BEHALF OF THE CONTRACTOR IN CONJUNCTION WITH DOB # B00994757. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01279621-P1
03/09/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/06/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/30/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/29/2026
Permit issued — Structural
B00994757-S1-ST
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/20/2026
Signed off — Alteration
Suspended Scaffold and hoist installation for chimney stack installation
B01280426-I1
12/22/2025
Signed off — Alteration
B01097148-I1
12/22/2025
Permit issued — Suspended Scaffold
B01097148-I1-SC
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/19/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01098974-I1
12/19/2025
Signed off — Alteration
B01098980-I1
12/19/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01123691-I1
12/19/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/18/2025
Permit issued — Supported Scaffold
B01123691-I1-SF
12/18/2025
Objection resolved — Addressed
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
12/18/2025
Special inspection requirement — Post-installed Anchors
MARISA HARTE
12/18/2025
Special inspection requirement — Final
MARISA HARTE
12/18/2025
Special inspection requirement — Concrete - Cast-In-Place
MARISA HARTE
12/18/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MARISA HARTE
12/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MARISA HARTE
12/10/2025
Permit issued — Mechanical Systems
B00994757-S2-MS
12/09/2025
Signed off — Alteration
Lafayette Bldg 02, Exterior Facade repairs: Removal/replacement/repairs of concrete slab, exterior wythe reconstruction of brick cavity wall, repointing, sill, shelf angle, masonry, expansion joint and sealant. Abate lead and asbestos materials.
B01034517-I1
12/09/2025
Special inspection requirement — Electrical motors and elevators
MARISA HARTE
12/09/2025
Special inspection requirement — Lighting controls
MARISA HARTE
12/09/2025
Special inspection requirement — Maintenance information
MARISA HARTE
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
12/09/2025
Special inspection requirement — Shutoff dampers
MARISA HARTE
12/09/2025
Special inspection requirement — Final
MARISA HARTE
12/09/2025
Special inspection requirement — Tenant Protection Plan Compliance
MARISA HARTE
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
12/09/2025
Special inspection requirement — Mechanical Systems
MARISA HARTE
12/09/2025
Special inspection requirement — Lighting in dwelling units
MARISA HARTE
12/08/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/03/2025
Filed — Alteration
Suspended Scaffold and hoist installation for chimney stack installation
B01280426-P2
12/02/2025
Permit issued — Boiler Equipment
B00994757-S4-BE
11/19/2025
Filed — Alteration
Suspended Scaffold and hoist installation for chimney stack installation
B01280426-P1
11/19/2025
Objection raised — Other
11/18/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF CONDENSATE RETURN UNIT WITH MECHANICAL PIPING AND ASSOCIATED ACCESSORIES FOR INTERIOR RENOVATION OF MECHANICAL EQUIPMENT ROOM NOTED ON MECHANICAL DRAWINGS.
B00994757-P5
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MARISA HARTE
11/17/2025
Special inspection requirement — Mechanical Systems
MARISA HARTE
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MARISA HARTE
11/17/2025
Special inspection requirement — Shutoff dampers
MARISA HARTE
11/17/2025
Special inspection requirement — Electrical motors and elevators
MARISA HARTE
11/17/2025
Special inspection requirement — Lighting controls
MARISA HARTE
11/17/2025
Special inspection requirement — Maintenance information
MARISA HARTE
Latest 60 of 188 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/20/2026
DOB NOWConstruction FencePermit IssuedMARIC MECHANICAL INC03/17/2026
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC03/17/2026
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/17/2026
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC03/17/2026
DOB NOWStructuralPermit IssuedMARIC MECHANICAL INC01/29/2026
DOB NOWSuspended ScaffoldSigned-offJ&N CONSTRUCTION GRP CORP12/22/2025
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP12/18/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC12/10/2025
DOB NOWBoiler EquipmentPermit IssuedFJP MECHANICAL INC12/02/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC11/13/2025
DOB NOWPlumbingPermit IssuedFJP MECHANICAL INC11/13/2025
DOB NOWGeneral ConstructionPermit IssuedMARIC MECHANICAL INC11/12/2025
DOB NOWPlumbingPermit IssuedFJP MECHANICAL INC10/28/2025
DOB NOWSuspended ScaffoldSigned-offAMERICAN VENTILATION SERV09/22/2025
DOB NOWMechanical SystemsSigned-offMARIC MECHANICAL INC09/18/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP09/15/2025
DOB NOWConstruction FencePermit IssuedMARIC MECHANICAL INC09/11/2025
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP08/21/2025
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP08/21/2025
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP12/11/2024
DOB NOWGeneral ConstructionSigned-offJ & N CONSTRUCTION GROUP12/02/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC12/02/2024
DOB NOWSupported ScaffoldSigned-offJ & N CONSTRUCTION GROUP10/09/2024
DOB NOWSuspended ScaffoldSigned-offJ&N CONSTRUCTION GRP CORP09/06/2024
DOB NOWConstruction FenceSigned-offJ & N CONSTRUCTION GROUP08/21/2024
DOB NOWSidewalk ShedSigned-offJ & N CONSTRUCTION GROUP08/21/2024
DOB NOWSuspended ScaffoldPermit IssuedD&N CONST & CONSULTNG INC01/17/2024
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR05/29/2019
BISEQISSUEDMNK ENTERPRISES LLC01/12/2024
BISEQISSUEDMNK ENTERPRISES LLC12/23/2022
BISEQISSUEDSKYWORX CONTRACTING INC12/01/2021
BISEQISSUEDSKYWORX CONTRACTING INC11/10/2020
BISEQISSUEDSKYWORX CONTRACTING INC10/25/2019
BISPLISSUEDZONE PLUMBING & HEATING C08/15/2019
BISOTISSUEDJACOBS TELECOMMUN. INC05/10/2019
BISEQISSUEDSKYWORX CONTRACTING INC10/29/2018
BISEQISSUEDSKYWORX CONTRACTING INC11/08/2017
BISOTISSUEDJACOBS TELECOMMUN. INC07/03/2017
BISOTISSUEDJACOBS TELECOMMUN. INC02/07/2017
+ 34 more permits on file
1 project · most recent 11/18/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/18/2025Permit IssuedMARIC MECHANICAL INCVentilation Systems
Ventilation
Greenheck AER-24-02-0615-VGD 4,500 CFM · Exhaust Fan ×10
2 projects · most recent 03/12/2026
Gas Storm
FiledStatusContractorScope
03/12/2026Permit IssuedFJP MECHANICAL INCGas
11/18/2025Permit IssuedFJP MECHANICAL INCGas, Storm
8 projects · most recent 03/18/2026
General Wiring
FiledStatusContractorScope
03/18/2026Permit IssuedOHM'S ELECTRICAL CORPGeneral Wiring
08/26/2025Permit IssuedOHM'S ELECTRICAL CORPGeneral Wiring
02/11/2025CompleteLIT MODE ELECL CONTG INC—
02/11/2025CompleteLIT MODE ELECL CONTG INC—
12/19/2024CompleteLIT MODE ELECL CONTG INC—
08/13/2024CompleteLIT MODE ELECL CONTG INC—
06/06/2021CompleteSEZEKCOL ELECTRIC INCGeneral Wiring
05/10/2021CompleteAMIN ELECTRICAL CORP—
1 project · most recent 11/18/2025
Concrete
FiledStatusContractorScope
11/18/2025Permit IssuedMARIC MECHANICAL INCConcrete
1 project · most recent 03/12/2026
Fence
FiledStatusContractorScope
03/12/2026Permit IssuedMARIC MECHANICAL INCFence
1 project · most recent 03/12/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
03/12/2026Permit IssuedMARIC MECHANICAL INCTenant Protection Plan 72 Hour
1 project · most recent 01/08/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
01/08/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
08/10/2026Fail-Final CND-Occupancy InspectionFailView ↗
08/10/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/08/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
03/17/2026Tenant Protection Plan Compliance—special
03/09/2026Tenant Protection Plan Compliance—special
12/18/2025FinalMARISA HARTEprogress
12/18/2025Subsurface Conditions – Fill Placement & In-Place DensityMARISA HARTEspecial
12/18/2025Concrete - Cast-In-PlaceMARISA HARTEspecial
12/18/2025Structural Stability – Alterations of existing buildingsMARISA HARTEspecial
12/18/2025Tenant Protection Plan ComplianceMARISA HARTEspecial
12/18/2025Post-installed AnchorsMARISA HARTEspecial
12/09/2025Electrical motors and elevatorsMARISA HARTEenergy_progress
12/09/2025FinalMARISA HARTEprogress
12/09/2025Fire-Resistant Penetrations and JointsMARISA HARTEspecial
12/09/2025Tenant Protection Plan ComplianceMARISA HARTEspecial
12/09/2025Mechanical SystemsMARISA HARTEspecial
12/09/2025Lighting in dwelling unitsMARISA HARTEenergy_progress
12/09/2025Maintenance informationMARISA HARTEenergy_progress
12/09/2025Lighting controlsMARISA HARTEenergy_progress
12/09/2025Shutoff dampersMARISA HARTEenergy_progress
12/09/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
11/17/2025Maintenance informationMARISA HARTEenergy_progress
11/17/2025Lighting controlsMARISA HARTEenergy_progress
11/17/2025Electrical motors and elevatorsMARISA HARTEenergy_progress
11/17/2025Shutoff dampersMARISA HARTEenergy_progress
11/17/2025HVAC-R and service water piping design and insulationMARISA HARTEenergy_progress
11/17/2025Mechanical SystemsMARISA HARTEspecial
11/17/2025Fire-Resistant Penetrations and JointsMARISA HARTEspecial
Latest 25 of 82.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch30
08/26/2026B00987386-I1Request digital key ↗
08/25/2026B01034517-I1Request digital key ↗
08/24/2026B01072272-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00127297-I1Request digital key ↗
▸Applications & Permits50
▸BISWORK PERMIT APPLICATION33
01/16/2024340321716Open ↗
12/29/2022340321716Open ↗
12/03/2021340321716Open ↗
Showing 3 of 33 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION17
10/06/2023321515142Open ↗
03/20/2019321932959Open ↗
05/16/2017321573196Open ↗
Showing 3 of 17 on file for this type
▸Seals & Professional Certifications105
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/02/2026B00127297-I1Open ↗
08/24/2026B01098980-I1Open ↗
08/24/2026B01098974-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/05/2026B01123691-I1Open ↗
09/01/2026B01143365-I1Open ↗
09/01/2026B01143365-I1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
05/14/2019321932959Open ↗
04/25/2018321573196Open ↗
05/16/2017321573196Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
08/29/2026B00994757-S1Open ↗
08/29/2026B01279621-S4Open ↗
08/28/2026B00994757-P5Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/09/2015340321716Open ↗
07/09/2015340274580Open ↗
05/06/2014340135295Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/13/2011320380182Open ↗
10/07/2011320365939Open ↗
06/21/2011320324644Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
11/09/2015340321716Open ↗
07/09/2015340274580Open ↗
05/06/2014340135295Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
11/09/2015340321716Open ↗
07/09/2015340274580Open ↗
05/06/2014340135295Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
10/13/2011320380182Open ↗
10/07/2011320365939Open ↗
06/21/2011320324644Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
04/04/2008310121105Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/20/2019321932959Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes3
03/20/2019321932959Open ↗
05/16/2017321573196Open ↗
01/26/2017321515142Open ↗
▸Environmental & Asbestos24
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/02/2026B00127297-I1Open ↗
08/20/2026B00994757-S3Open ↗
08/20/2026B00994757-S2Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/20/2019321932959Open ↗
05/16/2017321573196Open ↗
01/26/2017321515142Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/15/2026B00994757-S1Open ↗
08/13/2026B01034517-I1Open ↗
08/13/2026B01072272-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/06/2014340135295Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/30/2009320087847Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
02/04/2016340135295Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/04/2008310121105Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
05/14/2019321932959Open ↗
04/25/2018321573196Open ↗
05/16/2017321573196Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
10/02/2023321515142Open ↗
04/25/2018321573196Open ↗
02/04/2016340135295Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/02/2023321515142Open ↗
05/06/2014340135295Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/06/2014340135295Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
—340213423Open ↗
▸BISNYCECC ANALYSIS1
05/06/2014340135295Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
10/04/2023321515142Open ↗
10/02/2023321515142Open ↗
11/09/2015340321716Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs59
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter31
08/24/2026B01097148-I1Open ↗
08/23/2026B01123691-I1Open ↗
08/20/2026B00994757-S4Open ↗
Showing 3 of 31 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
10/04/2024340321716Open ↗
10/05/2023321515142Open ↗
04/25/2018321573196Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
01/16/2024340321716Open ↗
01/16/2024340321716Open ↗
04/25/2018321573196Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
06/23/2014320992182Open ↗
10/13/2011320380182Open ↗
10/07/2011320365939Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/13/2026B01034517-I1Open ↗
08/13/2026B01072272-I1Open ↗
▸BISSUPERSEDING LETTER1
12/29/2022340321716Open ↗
▸BISSHED LETTER1
04/15/2014320324644Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
10/02/2023321515142Open ↗
03/20/2019321932959Open ↗
04/25/2018321573196Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET9
03/20/2019321932959Open ↗
05/16/2017321573196Open ↗
01/26/2017321515142Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
11/09/2015340321716Open ↗
07/09/2015340274580Open ↗
05/06/2014340135295Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
12/29/2022340321716Open ↗
12/03/2021340321716Open ↗
11/10/2020340321716Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
05/14/2019321932959Open ↗
05/02/2019321932959Open ↗
05/02/2019321932959Open ↗
Showing 3 of 4 on file for this type
▸Other Documents16
▸DOB NOWCalculations6
08/13/2026B01280426-P2Open ↗
08/13/2026B01143365-I1Open ↗
08/13/2026B01097148-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
08/13/2026B00987386-I1Open ↗
08/13/2026B01143365-I1Open ↗
08/13/2026B01280426-P1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/15/2014320324644Open ↗
04/05/2012320324644Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/06/2015340135295Open ↗
▸BISOP-4 - Special Report1
02/10/2015320324644Open ↗