← Back
BuildNYC
Elevator cooperative
345 EAST 54TH STREET
MANHATTAN · BIN 1039948
💬 Discuss this project
1960Year Built
7Stories
D4Building Class
R8BZoning
37,732 sfGross Floor Area
59Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: 345 East 54th Owners · 8,234 sf lot · 4.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6B, Unit 6C8p · 2 filings · 19 docs
Floor 5
Floor 4
Floor 31 filing · 2 docs
Floor 21 filing · 2 docs
Floor 1Unit 1A8p · 2 filings · 14 docs
CellarNew curb valve installation7p · 1 filing · 20 docs
Site & exteriorPipe scaffold installation42p · 2 filings · 16 docs
Filed — no permit issuedExcavation and Underpinning5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Matthew Adam Properties503/21/2026
345 E 54 Street Owners503/21/2026
345 East 54th Owners403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Umang Pawar103/04/2026
Robert Germain Jr. PE411/12/2024
Ndkazalas Architecture202/23/2024
McCray Architect108/25/2023
JS Drafting & Design206/21/2021
Peter Pizzimenti, Architect203/10/2021
Ashraf606/19/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
D.W.G. Services103/21/2026
Ndkazalas Architecture203/21/2026
HH Building Consulting & Architectu1203/21/2026
D.P. Consulting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pratt Construction & RestorationScaffold707/08/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
Ips PlumbingPlumbing207/08/2026
Minos ConstructionGeneral Contractor203/21/2026
SJG ConstructionGeneral Contractor203/21/2026
Neptune MechanicalPlumbing107/08/2026
The Metro Group ElectricElectrical103/21/2026
Dual Fuel CompanyGeneral Contractor107/08/2026
Glendale Electl ContngElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Robert F. Germain Jr. PE5100411/12/2024
Concrete Solutions Lab Co5344202/23/2024
Niza Works of Architects6101206/21/2021
Building Lifecycle
All (127)Filed (18)Permit Issued (11)Signed Off (9)Facade (FISP) (12)Violation (45)Inspection (8)Special Inspection (24)
03/04/2026
Filed — Alteration
M01364744-I1
05/09/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-S2
05/08/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-I1
05/08/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-S1
03/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2025
Signed off — Alteration
FORMALLY FILING PLUMBING WORK ASSOCIATED WITH ALTERATION TYPE II FOR INTERIOR ALTERATIONS TO APT. 1A. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01007214-I1
01/02/2025
Signed off — Alteration
FORMALLY FILING PLUMBING WORK ASSOCIATED WITH ALTERATION TYPE II FOR INTERIOR ALTERATIONS TO APT. 1A. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01007214-S1
12/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/26/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
11/12/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-P1
11/12/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
C
11/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
10/25/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/24/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/30/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/09/2024
Permit issued — General Construction
M01057349-I1-GC
06/18/2024
Permit issued — Plumbing
M01057349-S1-PL
06/18/2024
Permit issued — Boiler Equipment
M01057349-S2-BE
06/12/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-S2
06/12/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-I1
06/12/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW OUTSIDE GAS METER, NEW GAS TRAIN, RECONNECT LOW PRESSURE GAS LINE HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01057349-S1
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
05/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
05/28/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
05/28/2024
Special inspection requirement — Final
Robert Germain Jr.
05/28/2024
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
05/16/2024
Violation issued (HPD, closed)
A
05/16/2024
Violation issued (HPD, closed)
B
05/16/2024
Violation issued (HPD, closed)
A
05/16/2024
Violation issued (HPD, closed)
C
05/16/2024
Violation issued (HPD, closed)
C
05/16/2024
Violation issued (HPD, closed)
A
05/16/2024
Violation issued (HPD, closed)
B
05/08/2024
Permit issued — Plumbing
M01007214-S1-PL
03/20/2024
Permit issued — General Construction
M01007214-I1-GC
02/23/2024
Filed — Alteration
FORMALLY FILING PLUMBING WORK ASSOCIATED WITH ALTERATION TYPE II FOR INTERIOR ALTERATIONS TO APT. 1A. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01007214-I1
02/23/2024
Filed — Alteration
FORMALLY FILING PLUMBING WORK ASSOCIATED WITH ALTERATION TYPE II FOR INTERIOR ALTERATIONS TO APT. 1A. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01007214-S1
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MINA HANNA
02/16/2024
Special inspection requirement — Energy Code Compliance Inspections
MINA HANNA
02/16/2024
Special inspection requirement — Final
Nickolas Kazalas
02/16/2024
Special inspection requirement — Lighting controls
MINA HANNA
02/16/2024
Special inspection requirement — Interior lighting power
MINA HANNA
08/25/2023
Filed — Alteration
M00920075-I1
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/31/2022
Cycle 9 facade report signed — SAFE
05/16/2022
Cycle 9 facade report submitted
04/21/2022
Cycle 9 facade inspection completed
12/09/2021
Signed off — Alteration
Replace existing Toilet in Bathroom,
M00445827-I1
08/30/2021
Signed off — Alteration
THIS PROJECT CONSISTS OF AN ALTERATION OF MINOR CHARACTER (KITCHEN RENO).
M00501551-I1
06/23/2021
Special inspection requirement — Lighting in dwelling units
Nicolas Zapata
06/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offDual Fuel Company08/09/2024
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating06/18/2024
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating06/18/2024
DOB NOWPlumbingSigned-offNeptune Mechanical05/08/2024
DOB NOWGeneral ConstructionSigned-offMinos Construction03/20/2024
DOB NOWGeneral ConstructionSigned-offSJG Construction04/26/2021
DOB NOWPlumbingSigned-offIps Plumbing04/16/2021
DOB NOWPlumbingSigned-offIps Plumbing04/02/2021
DOB NOWSupported ScaffoldSigned-offPratt Construction & Res*09/25/2019
DOB NOWSupported ScaffoldSigned-offPratt Construction & Res*04/11/2019
DOB NOWSidewalk ShedSigned-offPratt Construction & Res*04/04/2019
BISOTISSUEDAras Contracting02/23/2021
BISOTISSUEDSJG Construction01/06/2020
BISOTISSUEDPratt Construction & Restoration06/18/2019
BISOTISSUEDAras Contracting06/17/2019
BISEQISSUEDPratt Construction & Restoration04/08/2019
BISEQISSUEDEverest Scaffolding08/25/2017
BISEQISSUEDColgate Enterprise04/19/2013
BISOTISSUEDJ.V.S. Contracting Group04/16/2013
BISOTISSUEDJ.V.S. Restoration10/24/2012
BISOTISSUEDChase Construction06/13/2005
BISBLISSUEDAbilene01/07/1998
BISPLISSUEDJohn Catania08/22/1995
BISOTISSUEDMichael J.cummins05/23/1995
BISFBISSUEDBrooklyn Boiler Repair Company12/20/1991
12 projects · most recent 04/03/2026
General Wiring Boiler Controls
FiledStatusContractorScope
04/03/2026CompleteLens Electric—
04/03/2026CompleteLens Electric—
01/05/2026CompleteThe Metro Group ElectricGeneral Wiring
06/12/2025CompleteGlendale Electl ContngGeneral Wiring
07/29/2024CompleteSTX ElectricalBoiler Controls
09/21/2023Permit IssuedNJS Electrical ServicesGeneral Wiring
11/14/2022CompleteAL-Lectric Elect'l ContractingGeneral Wiring
05/13/2021CompleteMartinez Electrical Cont—
04/29/2021Permit IssuedJRS ElectricGeneral Wiring
09/03/2020CompleteBrandl ElectricGeneral Wiring
11/03/2019CompleteSteven Farkas—
03/25/2019CompleteSteven Farkas—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/26/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/24/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
11/14/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/14/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
11/08/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/08/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
05/29/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
05/29/2024Tenant Protection Plan ComplianceRobert Germain Jr.special
05/28/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
05/28/2024FinalRobert Germain Jr.progress
05/28/2024Chimneys and ventsRobert Germain Jr.special
02/21/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/16/2024Fire-Resistant Penetrations and JointsMINA HANNAspecial
02/16/2024Energy Code Compliance InspectionsMINA HANNAprogress
02/16/2024FinalNickolas Kazalasprogress
02/16/2024Lighting controlsMINA HANNAenergy_progress
02/16/2024Interior lighting powerMINA HANNAenergy_progress
06/23/2021Lighting in dwelling unitsNicolas Zapataenergy_progress
06/23/2021Fire-Resistant Penetrations and JointsNicolas Zapataspecial
06/23/2021FinalNicolas Zapataprogress
06/23/2021Energy Code Compliance InspectionsNicolas Zapataprogress
06/21/2021FinalNicolas Zapataprogress
06/21/2021Fire-Resistant Penetrations and JointsNicolas Zapataspecial
06/21/2021Energy Code Compliance InspectionsNicolas Zapataprogress
06/21/2021Lighting in dwelling unitsNicolas Zapataenergy_progress
06/19/2019FinalEric Fosterprogress
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch10
09/03/2026M00501551-I1Request digital key ↗
09/03/2026M00501551-P1Request digital key ↗
08/29/2026M00920075-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00150013-I1Request digital key ↗
08/15/2026M00150013-P1Request digital key ↗
08/15/2026M00150013-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00150008-I1Request digital key ↗
08/15/2026M00150008-P2Request digital key ↗
08/15/2026M00150008-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00445827-I1Request digital key ↗
08/15/2026M00445827-P1Request digital key ↗
▸Applications & Permits23
▸BISPLAN / WORK APPROVAL APPLICATION13
09/17/2021123713561Open ↗
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION10
02/23/2021140996117Open ↗
01/07/2020123713561Open ↗
06/19/2019123860884Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00150013-P2Open ↗
09/05/2026M00150013-I1Open ↗
09/05/2026M00150013-P1Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
03/25/2020140841025Open ↗
01/07/2020123713561Open ↗
12/26/2019123860884Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026M01057349-S2Open ↗
09/23/2026M01057349-S2Open ↗
09/01/2026M01057349-S1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026M00150008-I1Open ↗
09/01/2026M01007214-I1Open ↗
09/01/2026M01007214-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
06/10/2019140853583Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
06/10/2019140853583Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
06/10/2019140853583Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
04/24/2013121593640Open ↗
10/23/2012120898341Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/24/2013121593640Open ↗
10/23/2012120898341Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
03/17/2011120586008Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes4
08/06/2019123713561Open ↗
05/13/2019123860884Open ↗
06/10/2019140853583Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
02/12/2021140996117Open ↗
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
09/05/2026M00150013-P2Open ↗
09/05/2026M00150013-I1Open ↗
09/05/2026M00150013-P1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
08/06/2019123713561Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
02/07/2011120586008Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
06/18/2019123860884Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/19/2021123713561Open ↗
11/18/2021123713561Open ↗
11/18/2021123713561Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/07/2020123713561Open ↗
12/26/2019123860884Open ↗
08/06/2019123713561Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/14/2021140996117Open ↗
12/10/2021140853583Open ↗
11/18/2021123713561Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
06/10/2019140853583Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/14/2021140996117Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
08/24/2017140686416Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/26/2019123860884Open ↗
▸BISNYCECC ANALYSIS1
06/10/2019140853583Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00501551-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY10
11/19/2021123713561Open ↗
11/18/2021123713561Open ↗
11/18/2021123713561Open ↗
Showing 3 of 10 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
12/14/2021140996117Open ↗
12/10/2021140853583Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/18/2026M01364744-I1Open ↗
▸DOB NOWSOIL REPORT1
08/18/2026M01364744-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
12/16/2021140996117Open ↗
12/13/2021140853583Open ↗
11/19/2021123713561Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
04/24/2013121593640Open ↗
10/23/2012120898341Open ↗
03/16/2011120586008Open ↗
Showing 3 of 4 on file for this type
▸BISFINAL2
12/14/2021140996117Open ↗
12/10/2021140853583Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
03/17/2011120586008Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/22/2019123713561Open ↗
▸Cost, Insurance & Ownership13
▸BISCOST AFFIDAVIT10
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
12/26/2019123860884Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
12/14/2021140996117Open ↗
12/10/2021140853583Open ↗
11/18/2021123713561Open ↗
▸Filing & Intake Forms15
▸BISEFILING JOB APPLICATION COVER SHEET5
04/08/2021141001010Open ↗
01/31/2021140996117Open ↗
06/10/2019140853583Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
08/06/2019123713561Open ↗
05/13/2019123860884Open ↗
04/24/2013121593640Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
10/27/2021123713561Open ↗
06/18/2019123860884Open ↗
06/07/2019123860884Open ↗
▸BISBOROUGH INTAKE FORM3
03/25/2020140841025Open ↗
12/26/2019123860884Open ↗
01/05/2018140686416Open ↗