← Back
Elevator cooperative
Mill Rock Plaza
345 EAST 93 STREET · Upper East Side-Yorkville · BIN 1050288
💬 Discuss this project
1974Year Built
32Stories
D4Building Class
C2-8Zoning
340,068 sfGross Floor Area
315Units
LL97 CoveredRent Stabilized8 Open Violations 7 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator cooperative · Owner of record: MILLROCK OWNERS CORP · 25,178 sf lot · 13.51 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 6 docs
Floor 322 filings · 7 docs
Floor 314p · 2 filings · 13 docs
Floor 30
Floor 29
Floor 28
Floor 275p · 2 filings · 7 docs
Floor 26
Floor 251 filing · 13 docs
Floor 242 filings · 18 docs
Floor 231 filing · 7 docs
Floor 22
Floor 211 filing · 11 docs
Floor 201 filing · 7 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14Under Construction1 filing · 7 docs
Floor 13
Floor 12
Floor 113p · 2 filings · 20 docs
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 51 filing · 7 docs
Floor 4
Floor 3
Floor 2Under Construction5p · 2 filings · 20 docs
Floor 1Under Construction9p · 4 filings · 20 docs
CellarUnder Construction1p · 2 filings · 20 docs
Site & exteriorUnder Construction4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MILL ROCK OWNER'S CORP.7903/22/2026
ORSID3507/08/2026
ORSID REALTY CORP1103/22/2026
MILROCK PLAZA OWNERS603/21/2026
ORSID REALTY MILL ROCK OWNERS503/21/2026
REFIT CONSTRUCTION303/21/2026
PT CONSTRUCTION203/22/2026
INTERIOR DESIGN & BUILDERS103/22/2026
PT CONSTRUCTION GROUP103/22/2026
ALPHACRAFT CONSTRUCTION I103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MILLIEN DESIGN AND CONSULTAN1203/21/2026
LMS-ACE SERVICES203/21/2026
AE DESIGN SOLUTION1203/21/2026
DI DIO ARCHITECTURE, PC1003/21/2026
A+ EXPEDITING603/21/2026
I L CONSULTING403/21/2026
MESZAROS ENGINEERING PLLC2003/21/2026
FRANK BUENO EXPEDITING203/21/2026
YOUBER DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ESG BUILDERS LLCGeneral Contractor603/21/2026
H & D MAINTENANCE CO INCGeneral Contractor507/08/2026
DA CONSTRUCTION INCGeneral Contractor407/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor407/08/2026
JR INTERIOR DESIGNS INCGeneral Contractor404/09/2026
ARGON ELECTRICAL CORPElectrical403/22/2026
STONE REMODELING, INCGeneral Contractor303/21/2026
AUROUS CONSTRUCTION COLL*General Contractor303/21/2026
CHLOE CONSTRUCTION LLCGeneral Contractor303/21/2026
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
DOME K LLCGeneral Contractor303/21/2026
JIA WEI CONSTRUCTION INCGeneral Contractor303/21/2026
TOP DOG PLBG & HTG CORPPlumbing307/08/2026
JOHN FITZGERALD PLBG &HTGPlumbing207/08/2026
AMERICAN VENTILATION SERVGeneral Contractor203/21/2026
HM ELECTRICAL INCElectrical203/22/2026
LIQUID PLBG & HTNG SCS INPlumbing207/08/2026
SJL ELECTRIC INC.Electrical103/22/2026
TESTA ELECTRIC CO., INCElectrical103/22/2026
WCK ELECTRIC CORP.Electrical103/22/2026
ARANDA, MANUELFire Protection103/21/2026
HT PLUMBING & HEATING CORPlumbing106/27/2026
INNOVATIVE HEATING SOLUTIPlumbing107/08/2026
GSA ELECTRIC CORP.Electrical103/22/2026
ELEZI LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MESZAROS ENGINEERING PLLC963806/16/2026
MOHAMMAD AHEAD - PROFESSI9286203/09/2026
PIRO STUDIO LLC7503509/24/2025
CHERNY ARCHITECT PLLC1925209/04/2025
AG ENGINEERING PLLC8899207/16/2025
EDG2578207/16/2025
JOCK DEBOER, AIA - SIA7008311/16/2023
CMSC, INC6098310/17/2023
MUNICIPAL TESTING LABORAT230105/01/2023
AYUSO ARCHITECTURE PC7720102/15/2022
Building Lifecycle
All (284)Filed (51)Permit Issued (44)Signed Off (25)Facade (FISP) (17)Violation (60)Inspection (35)Objection (22)Special Inspection (30)
09/29/2026
Permit issued — Plumbing
M01451815-S1-PL
08/10/2026
Cycle 10 facade report submitted
08/03/2026
Cycle 10 facade report signed — SAFE
07/31/2026
Signed off — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detail
M01268397-I1
07/29/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287666-I1
06/25/2026
Cycle 10 facade inspection completed
06/16/2026
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P6
06/16/2026
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P5
06/02/2026
Signed off — Alteration
Replace 1 water closet, 1 lavatory, 1 kitchen sink, 1 gas range and 1 dishwasher. Remove 1 bathtub. Install 1 shower and 1 washer.
M01239891-I1
06/02/2026
Signed off — Alteration
Replace 1 water closet, 1 lavatory, 1 kitchen sink, 1 gas range and 1 dishwasher. Remove 1 bathtub. Install 1 shower and 1 washer.
M01239891-S1
05/20/2026
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P4
05/20/2026
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P3
05/15/2026
Special inspection requirement — Final
Christian Meszaros
05/15/2026
Special inspection requirement — Post-installed Anchors
Christian Meszaros
05/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christian Meszaros
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2026
Special inspection requirement — Preliminary
Christian Meszaros
05/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/18/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/12/2026
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
03/12/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
03/09/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detail
M01268397-P1
03/09/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/05/2026
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
03/05/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
03/03/2026
Permit issued — General Construction
M01243133-I1-GC
02/26/2026
Permit issued — Suspended Scaffold
M01268397-I1-SC
02/02/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/27/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287666-P1
01/15/2026
Signed off — Alteration
M01117777-I1
01/15/2026
Signed off — Alteration
Plumbing modification work related to the 31st floor Apartment EFG renovation. Work includes the removal, replacement and installation of of plumbing fixtures.
M01117766-I1
01/14/2026
Permit issued — Mechanical Systems
M01117777-I1-MS
01/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/24/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/18/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/16/2025
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P2
12/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christian Meszaros
12/04/2025
Permit issued — Plumbing
M01239891-S1-PL
11/26/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/12/2025
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-P1
11/10/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Signed off — Alteration
Plumbing modification work related to the 27th floor Apartment D/E renovation. Work includes the removal, replacement and installation of of plumbing fixtures.
M01048951-I1
10/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/17/2025
Objection raised — Scope
10/17/2025
Objection resolved — Addressed
10/08/2025
Signed off — Alteration
M01048949-I1
10/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/06/2025
Permit issued — Plumbing
M01270399-S1-PL
10/01/2025
Permit issued — General Construction
M01270399-I1-GC
09/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01287666-I1
09/24/2025
Filed — Alteration
Plumbing modification work related to the 31st floor Apartment EFG renovation. Work includes the removal, replacement and installation of of plumbing fixtures.
M01117766-P1
09/24/2025
Permit issued — Sidewalk Shed
M01287666-I1-SH
09/18/2025
Permit issued — Suspended Scaffold
M01268397-I1-SC
09/18/2025
Permit issued — General Construction
M01239891-I1-GC
09/05/2025
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-S1
09/05/2025
Filed — Alteration
INSTALLATION OF NEW GAS BARBECUE ON SECOND FLOOR TERRACE AND NEW GAS PIPING TO BARBECUE. NO CHANGE IN EGRESS OR OCCUPANCY.
M01270399-I1
09/04/2025
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added winsafe 1500 back plate and scaffold anchor detail
M01268397-I1
Latest 60 of 284 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedASPECT PLBNG&HTNG CO LLC09/29/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE RESTORATION INC03/03/2026
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC02/26/2026
DOB NOWMechanical SystemsSigned-offJR INTERIOR DESIGNS INC01/14/2026
DOB NOWPlumbingSigned-offA.M.N. CORPORATION12/04/2025
DOB NOWPlumbingPermit IssuedHT PLUMBING & HEATING COR10/06/2025
DOB NOWGeneral ConstructionPermit IssuedELEZI LLC10/01/2025
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL09/24/2025
DOB NOWSuspended ScaffoldSigned-offSKYLINE RESTORATION INC09/18/2025
DOB NOWGeneral ConstructionSigned-offDOME K LLC09/18/2025
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN04/21/2025
DOB NOWGeneral ConstructionSigned-offJR INTERIOR DESIGNS INC03/05/2025
DOB NOWGeneral ConstructionSigned-offJR INTERIOR DESIGNS INC03/05/2025
DOB NOWPlumbingSigned-offMITIE PLUMBING & HTG CORP02/05/2025
DOB NOWGeneral ConstructionSigned-offHELLO CHAPTER LLC02/03/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG11/26/2024
DOB NOWMechanical SystemsSigned-offJR INTERIOR DESIGNS INC11/22/2024
DOB NOWGeneral ConstructionSigned-offLAKE CONTRACTING LLC07/26/2024
DOB NOWMechanical SystemsSigned-offJIA WEI CONSTRUCTION INC05/17/2024
DOB NOWMechanical SystemsSigned-offESG BUILDERS LLC02/13/2024
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/14/2023
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY11/14/2023
DOB NOWMechanical SystemsSigned-offESG BUILDERS LLC11/08/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG06/14/2023
DOB NOWGeneral ConstructionSigned-offAUROUS CONSTRUCTION COLL*06/01/2023
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG05/12/2023
DOB NOWMechanical SystemsSigned-offSTONE REMODELING, INC04/13/2023
DOB NOWGeneral ConstructionSigned-offAMERICAN VENTILATION SERV12/15/2022
DOB NOWGeneral ConstructionSigned-offMG CONSTRUCTION & DESIGN*07/22/2022
DOB NOWGeneral ConstructionSigned-offDA CONSTRUCTION INC06/21/2022
DOB NOWPlumbingSigned-offADVANCED PLUMBING MECH03/11/2022
DOB NOWGeneral ConstructionSigned-offDA CONSTRUCTION INC03/03/2022
DOB NOWGeneral ConstructionSigned-offH & D MAINTENANCE CO INC01/19/2022
DOB NOWMechanical SystemsSigned-offH & D MAINTENANCE CO INC12/08/2021
DOB NOWMechanical SystemsSigned-offH & D MAINTENANCE CO INC06/10/2021
DOB NOWPlumbingSigned-offG.BASSOLINO PLUMBING LTD05/28/2021
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL04/16/2021
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN03/16/2021
DOB NOWGeneral ConstructionSigned-offCHLOE CONSTRUCTION LLC03/03/2021
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL07/23/2020
+ 54 more permits on file
2 projects · most recent 06/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/16/2026Permit IssuedHT PLUMBING & HEATING CORGas
03/12/2020Permit IssuedTOP DOG PLBG & HTG CORPGas, Water/Sanitary
25 projects · most recent 05/19/2026
General Wiring
FiledStatusContractorScope
05/19/2026CompleteKINGS ELECTRIC CO., INC.General Wiring
04/26/2026CompleteAMBER ELECTL CONTNG INCGeneral Wiring
02/19/2026CompleteJTE ELECTRICAL SERVICES—
12/17/2025CompleteBRIGHTLINK ELECTRIC INC.General Wiring
09/23/2025CompleteOPTIMAL ELECTRIC, INC—
07/02/2025CompleteE & M ELECTRICAL NY CORPGeneral Wiring
05/02/2025CompleteKINGS ELECTRIC CO., INC.—
03/17/2025CompleteARGON ELECTRICAL CORPGeneral Wiring
02/06/2025CompleteASCUATECH ELECTRICAL CORP—
09/06/2024CompleteGRX EURO ELECTRIC CORPGeneral Wiring
06/12/2024CompleteFIU CORP DBA FIU ELECTRIC—
05/17/2024CompleteARGON ELECTRICAL CORPGeneral Wiring
04/17/2024CompleteRJ ELECTRICAL CONTRACTORSGeneral Wiring
03/01/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
03/01/2024CompleteARGON ELECTRICAL CORPGeneral Wiring
1 project · most recent 01/27/2026
Sidewalk Shed
FiledStatusContractorScope
01/27/2026Signed-offPOWERS BRIDGING & SCAFFOLSidewalk Shed
3 projects · most recent 06/16/2026
Tenant Protection Plan 72 Hour Suspended Scaffold
FiledStatusContractorScope
06/16/2026Permit IssuedHT PLUMBING & HEATING CORTenant Protection Plan 72 Hour
03/09/2026Signed-offSKYLINE RESTORATION INCSuspended Scaffold
07/16/2025Permit IssuedSKYLINE RESTORATION INCTenant Protection Plan 72 Hour
1 project · most recent 03/09/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/09/2026Signed-offSKYLINE RESTORATION INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
03/18/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/09/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/02/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/24/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/18/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/26/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/10/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
05/15/2026Post-installed AnchorsChristian Meszarosspecial
05/15/2026FinalChristian Meszarosprogress
05/15/2026Fire-Resistant Penetrations and JointsChristian Meszarosspecial
05/15/2026Tenant Protection Plan Compliance—special
05/15/2026Tenant Protection Plan Compliance—special
05/15/2026PreliminaryChristian Meszarosprogress
03/12/2026Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
03/12/2026Post-installed AnchorsMOHAMMAD AHEADspecial
03/05/2026Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
03/05/2026Post-installed AnchorsMOHAMMAD AHEADspecial
12/11/2025Tenant Protection Plan ComplianceChristian Meszarosspecial
09/03/2025Tenant Protection Plan ComplianceVladimir Lukyanov-Chernyspecial
09/03/2025Fire-Resistant Penetrations and JointsVladimir Lukyanov-Chernyspecial
07/29/2025Tenant Protection Plan ComplianceVladimir Lukyanov-Chernyspecial
07/29/2025Lighting in dwelling unitsVladimir Lukyanov-Chernyenergy_progress
07/29/2025Insulation placement and R valuesVladimir Lukyanov-Chernyenergy_progress
06/18/2025Structural Stability – Alterations of existing buildingsAnthony Stasiospecial
06/18/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
06/18/2025FinalRebecca Reillyprogress
06/18/2025MasonryAnthony Stasiospecial
06/11/2025FinalVladimir Lukyanov-Chernyprogress
04/17/2025Lighting in dwelling unitsKenny Makenergy_progress
04/17/2025FinalKayan Tseprogress
04/17/2025Energy Code Compliance InspectionsKenny Makprogress
02/12/2025Lighting in dwelling unitsKenny Makenergy_progress
Latest 25 of 101.
▾Documents — 984 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch46
09/04/2026M00472744-P4Request digital key ↗
09/04/2026M00472744-P3Request digital key ↗
09/04/2026M00472744-S1Request digital key ↗
Showing 3 of 46 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00310938-I1Request digital key ↗
09/05/2026M00297882-I1Request digital key ↗
08/15/2026M00297882-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00472744-P4Request digital key ↗
08/15/2026M00472744-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/03/2026M00373589-I1Request digital key ↗
08/15/2026M00373589-P1Request digital key ↗
▸Applications & Permits171
▸BISPLAN / WORK APPROVAL APPLICATION93
04/29/2025123798765Open ↗
06/20/2023104023879Open ↗
06/16/2023104023879Open ↗
Showing 3 of 93 on file for this type
▸BISWORK PERMIT APPLICATION74
08/03/2023104023879Open ↗
10/02/2020123887810Open ↗
09/15/2020123887080Open ↗
Showing 3 of 74 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
10/07/2020123887080Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
10/07/2020123887080Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records3
▸BISFLOOD ZONE DESIGN CERTIFICATION2
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications243
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
03/25/2020123887810Open ↗
03/25/2020123887810Open ↗
01/31/2020123887080Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature49
09/04/2026M00472744-I1Open ↗
09/04/2026M00472744-P4Open ↗
09/04/2026M00472744-P3Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
09/15/2026M00512626-P1Open ↗
09/15/2026M00512626-P1Open ↗
09/01/2026M01059698-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
09/01/2026M01270399-P2Open ↗
09/01/2026M01059698-I1Open ↗
09/01/2026M01059698-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
08/25/2020140944192Open ↗
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
10/17/2019123710939Open ↗
04/26/2019123849595Open ↗
Showing 2 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
08/25/2020140944192Open ↗
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
08/25/2020140944192Open ↗
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment44
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE18
02/24/2020123189192Open ↗
04/26/2019123849595Open ↗
Showing 2 of 18 on file for this type
▸BISSCHEDULE B - PLUMBING14
08/18/2020123189192Open ↗
Showing 1 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection28
▸BISTenant Protection Plan and Notes19
03/25/2020123887810Open ↗
01/16/2020123798765Open ↗
10/17/2019123710939Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWTenant Protection Plan5
08/13/2026M00297882-P1Open ↗
08/13/2026M00373589-P1Open ↗
08/13/2026M00297882-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos82
▸DOB NOWDEP ACP-5: Asbestos Assessment Report45
09/04/2026M00472744-P4Open ↗
09/04/2026M00472744-P3Open ↗
09/04/2026M00472744-S1Open ↗
Showing 3 of 45 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)28
04/13/2020123887810Open ↗
03/25/2020123887810Open ↗
01/31/2020123887080Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance84
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
03/25/2020123887810Open ↗
01/31/2020123887080Open ↗
01/16/2020123798765Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS20
12/20/2021123887080Open ↗
03/04/2021140750845Open ↗
10/15/2020123710939Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
12/20/2021123887080Open ↗
03/04/2021140750845Open ↗
10/15/2020123710939Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/15/2026M00472744-I1Open ↗
Showing 1 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC ANALYSIS2
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/16/2025123798765Open ↗
▸BISINTERIOR LIGHTING POWER1
05/16/2025123798765Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY19
08/09/2023104023879Open ↗
08/09/2023104023879Open ↗
12/20/2021123887080Open ↗
Showing 3 of 19 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/02/2025123798765Open ↗
▸Approvals, Objections & Sign-offs58
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
10/02/2025123798765Open ↗
12/21/2021123887080Open ↗
03/04/2021140750845Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSUPERSEDING LETTER5
08/03/2023104023879Open ↗
10/02/2020123887810Open ↗
03/02/2020123189192Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
10/02/2025123798765Open ↗
10/02/2025123798765Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership77
▸BISCOST AFFIDAVIT73
12/20/2021123887080Open ↗
11/16/2021123887080Open ↗
11/15/2021123887080Open ↗
Showing 3 of 73 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
05/16/2025123798765Open ↗
06/13/2023104023879Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms88
▸BISEFILING COVER SHEET28
03/25/2020123887810Open ↗
01/31/2020123887080Open ↗
01/16/2020123798765Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM26
08/03/2023104023879Open ↗
10/02/2020123887810Open ↗
04/13/2020123887810Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION26
11/18/2021123887080Open ↗
10/27/2020123887080Open ↗
10/07/2020123887080Open ↗
Showing 3 of 26 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
08/25/2020140944192Open ↗
11/21/2019140871607Open ↗
11/21/2019140872125Open ↗
Showing 3 of 8 on file for this type
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
06/28/2023104023879Open ↗
04/26/2019123849595Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWDHCR Document5
09/04/2026M00472744-P4Open ↗
09/04/2026M00472744-P3Open ↗
09/04/2026M00472744-S1Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
02/08/2021140750845Open ↗
02/02/2021140750845Open ↗
02/02/2021140750845Open ↗
▸DOB NOWCalculations2
08/13/2026M01268397-I1Open ↗
08/13/2026M01268397-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01268397-P1Open ↗
08/13/2026M01268397-I1Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type