← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
345 WEST 13 STREET
MANHATTAN · BIN 1011692
💬 Discuss this project
1920Year Built
7Stories
RMBuilding Class
C1-6Zoning
126,372 sfGross Floor Area
47Units
LL97 CoveredRent Stabilized1 Open Violation 0 unresolved · 1 paperwork only ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: UNAVAILABLE OWNER · 18,509 sf lot · 6.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionEquipmentGeneral
Roof1p · 1 filing · 3 docs
Floor 43p · 3 filings · 20 docs
Floor 34p · 1 filing · 9 docs
Floor 2
Floor 11p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
1 job · most recent 04/07/2022
Water/Sanitary
FiledStatusContractorScope
04/07/2022Signed-offDELTA-SIGMA MECH CORPWater/Sanitary
20 jobs · most recent 02/09/2025
General Wiring
FiledStatusContractorScope
02/09/2025CompleteEINSTEIN ELEC'L CORPGeneral Wiring
06/18/2024CompleteCONDUCTOR ELECL SVCS INCGeneral Wiring
06/05/2024Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
06/14/2023CompleteDENMAR ELECTRIC CORPGeneral Wiring
02/23/2023CompleteELECTRICAL CHARGES CORP—
09/22/2022Permit IssuedIDEAL ELEC & HVAC CO INCGeneral Wiring
05/22/2022Permit IssuedCMY ELECTRICAL CORPGeneral Wiring
01/31/2022Permit IssuedSTAR LIGHT ELECTRIC INCGeneral Wiring
01/14/2022CompleteR-2 ELECTRIC INCGeneral Wiring
12/16/2021CompleteJUMPER ELECTRIC CORPGeneral Wiring
12/07/2021CompleteILLUMINOUS ELECTRIC CORP.General Wiring
12/19/2020CompleteDENMAR ELECTRIC CORPGeneral Wiring
09/08/2020CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
08/24/2020CompleteIDEAL ELEC & HVAC CO INCGeneral Wiring
07/23/2020CompleteMAR-KAM ELEC'L CONTR'G INGeneral Wiring
1 job · most recent 12/14/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
12/14/2023Permit IssuedKAY WATERPROOFING CORPSuspended Scaffold (SC)
Building Lifecycle
All (267)Filed (32)Permit Issued (48)Signed Off (22)Facade (FISP) (22)Violation (60)Inspection (23)Objection (30)Special Inspection (30)
07/01/2026
Filed — Alteration
Renovation of Kitchen and 3 Bathrooms. Replacement of fixtures.
M01178480-P1
06/22/2026
Permit issued — General Construction
M00488148-I1-ST
06/12/2026
Special inspection requirement — Final
Scott Vautrin
05/14/2026
Permit issued — General Construction
M01178480-I1-GC
12/22/2025
Permit issued — General Construction
M00597947-I1-GC
12/12/2025
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNITS 3F AND 3G AT 3RD FLOOR. WORK TO BE INCLUDED: REPLACEMENT OF KITCHEN AND BATHROOMS, NEW POWDER ROOM AND NEW FINISHES. NO CHANGE IN USE GROUP, EHRESS OR OCCUPANCY.
M00826624-I1
12/08/2025
Cycle 9 facade report signed — SWARMP
11/27/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Morbitzer
11/25/2025
Cycle 9 facade report submitted
11/24/2025
Objection resolved — Addressed
11/18/2025
Objection raised — Scope
11/12/2025
Signed off — Alteration
M00801915-I1
11/12/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF UNITS 3F AND 3G AT 3RD FLOOR. WORK TO INCLUDE REPLACE AND RELOCATE THE EXHAUST FANS. NO CHANGES TO EXISTING PTAC UNITS. NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
M00826649-I1
11/11/2025
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNITS 3F AND 3G AT 3RD FLOOR. WORK TO BE INCLUDED: REPLACEMENT OF KITCHEN AND BATHROOMS, NEW POWDER ROOM AND NEW FINISHES. NO CHANGE IN USE GROUP, EHRESS OR OCCUPANCY.
M00826624-P1
11/07/2025
Cycle 9 facade inspection completed
05/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/28/2025
Filed — Alteration
Renovation of Kitchen and 3 Bathrooms. Replacement of fixtures.
M01178480-I1
02/10/2025
Inspection — Pass-Final House Connection
Pass
View inspection ↗
02/03/2025
Permit issued — Suspended Scaffold
M00976294-I1-SC
12/23/2024
Permit issued — General Construction
M00597947-I1-GC
10/22/2024
Permit issued — Suspended Scaffold
M00976294-I1-SC
09/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/21/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2024
Violation issued (ECB, closed)
Construction
06/21/2024
Violation issued (ECB, closed)
Construction
06/05/2024
Permit issued — Plumbing
M00826624-I1-PL
06/04/2024
Permit issued — Mechanical Systems
M00826649-I1-MS
06/04/2024
Permit issued — General Construction
M00801915-I1-GC
04/22/2024
Signed off — Alteration
plumbing work for apt 3E only
M00833912-S1
04/22/2024
Signed off — Alteration
plumbing work for apt 3E only
M00833912-I1
03/25/2024
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH RENOVATION OF UNITS 3F AND 3G AT 3RD FLOOR. WORK TO BE INCLUDED: REPLACEMENT OF KITCHEN AND BATHROOMS, NEW POWDER ROOM AND NEW FINISHES. NO CHANGE IN USE GROUP, EHRESS OR OCCUPANCY.
M00826624-I1
03/25/2024
Filed — Alteration
M00801915-I1
03/25/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF UNITS 3F AND 3G AT 3RD FLOOR. WORK TO INCLUDE REPLACE AND RELOCATE THE EXHAUST FANS. NO CHANGES TO EXISTING PTAC UNITS. NO CHANGE IN USE GROUP, EGRESS OR OCCUPANCY.
M00826649-I1
02/13/2024
Permit issued — Suspended Scaffold
M00976294-I1-SC
01/26/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/18/2023
Permit issued — Suspended Scaffold
M00976294-I1-SC
12/14/2023
Filed — Alteration
Installation of outriggers for facade repair and inspection
M00976294-I1
12/13/2023
Violation issued (ECB, closed)
Construction
12/08/2023
Permit issued — General Construction
M00597947-I1-GC
12/07/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
10/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/20/2023
Signed off — Alteration
Filing herewith application for interior renovation of apartment 2F
M00705195-I1
09/20/2023
Signed off — Alteration
Filing herewith application for modification of Plumbing fixtures in apartment 2F
M00705208-I1
08/31/2023
Permit issued — General Construction
M00488148-I1-GC
07/24/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF THE APT 4B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00594273-I1
07/05/2023
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF THE APT 4B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00594273-P1
06/15/2023
Permit issued — General Construction
M00833912-I1-GC
06/14/2023
Permit issued — Plumbing
M00833912-S1-PL
05/23/2023
Signed off — Alteration
INTERIOR RENOVATION OF APT 4B IN AN EXISTING BUILDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS
M00594262-I1
04/27/2023
Filed — Alteration
plumbing work for apt 3E only
M00833912-S1
04/24/2023
Signed off — Alteration
SPRINKLER WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF THE APT 4B. NO CHANGE IN USE, EGRESS or OCCUPANCY
M00594288-I1
04/24/2023
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF THE APT 4B. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00594283-I1
04/24/2023
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/10/2023
Filed — Alteration
plumbing work for apt 3E only
M00833912-I1
04/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/24/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/28/2023
Signed off — Alteration
Remove and installation of partitions and finishes. No change to use, egress, or occupancy.
M00725632-I1
Latest 60 of 267 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY503/22/2026
345 WEST 13 CONDOMINIUM103/22/2026
345 WEST 13 STREET CONDOMINIUM3903/22/2026
TO THE OWNER OF203/22/2026
CITI CONTRACTING OF NEW Y203/22/2026
345 WEST 13TH ST303/22/2026
OWNER OF 345 WEST 13 STRE103/22/2026
ANDALORO CONSTRUCTION COR103/22/2026
THE OWNER OF203/22/2026
NATIONAL NECC CONST CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CODE1003/21/2026
FAVIO MARIA BARRIONUEVO203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
JM ZONING, LLC.1803/21/2026
BUILTIN STUDIO203/21/2026
NOEL BUILDING CONSULTING INC603/21/2026
GREEN STUDIO203/21/2026
KUSHNER STUDIOS203/21/2026
AV EXPEDITING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
REMODELING SPACE NY LLCGeneral Contractor1107/08/2026
NOVA CONSTRUCTION SERVICEGeneral Contractor707/08/2026
LMA GROUP INCGeneral Contractor607/08/2026
KAY WATERPROOFING CORPGeneral Contractor607/08/2026
YATES EXTERIOR RESTORATIONGeneral Contractor406/28/2026
YATES REST GROUP LTDGeneral Contractor307/08/2026
K.J. REMODELING OF NY CO*General Contractor303/21/2026
NEW ENTITY LLCGeneral Contractor303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
BONAIUTO ANTHONYElectrical203/21/2026
KG SPRINKLER CORPFire Protection207/08/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
BETTER BUILDERS CONCEPTSGeneral Contractor203/21/2026
HYDROTAC SERVICES LLCPlumbing207/08/2026
CENTRAL CONSTRUCTION MANAGEMENTGeneral Contractor203/21/2026
CORTLANDT CONTRACTING CORPGeneral Contractor204/09/2026
ANTHONY BONAIUTOElectrical203/21/2026
IVAN BUTKOVICElectrical203/21/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
CLIFTON WALDRONElectrical103/21/2026
DENMAR ELECTRIC CORPElectrical103/22/2026
DICAPUA, JOHNElectrical103/21/2026
JEFF SKOWRONSKIElectrical103/21/2026
JOHN DICAPUAElectrical103/21/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMMOR ARCHITECTURE LLP3054411/11/2025
GEORGE J. XERAKIAS, PE1658112/14/2023
INTEGRITY CONSULTING SERV666104/10/2023
EDWARD F ZEVALLOS ARCHITE1025106/06/2022
KENDALL ENGINEERING PC4154304/07/2022
ANZ CONSULTING ENGINEERIN3946311/11/2021
FALCON ENGINEERING CO.LLC5649211/08/2021
WELLS DESIGN & CONSULTING7750209/21/2021
MT GROUP798103/23/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedYATES EXTERIOR RESTORATION06/22/2026
DOB NOWGeneral ConstructionSigned-offECOSTRUCTURE DESIGN BUILD05/14/2026
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP12/22/2025
DOB NOWSuspended ScaffoldPermit IssuedKAY WATERPROOFING CORP.02/03/2025
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP12/23/2024
DOB NOWSuspended ScaffoldPermit IssuedKAY WATERPROOFING CORP.10/22/2024
DOB NOWPlumbingSigned-offMASTER TECH PLUMBING LLC06/05/2024
DOB NOWMechanical SystemsSigned-offCORTLANDT CONTRACTING COR06/04/2024
DOB NOWGeneral ConstructionSigned-offCORTLANDT CONTRACTING COR06/04/2024
DOB NOWSuspended ScaffoldPermit IssuedKAY WATERPROOFING CORP.02/13/2024
DOB NOWSuspended ScaffoldPermit IssuedKAY WATERPROOFING CORP.12/18/2023
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP12/08/2023
DOB NOWGeneral ConstructionPermit IssuedYATES EXTERIOR RESTORATIO08/31/2023
DOB NOWGeneral ConstructionSigned-offK.J. REMODELING OF NY CO*06/15/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/14/2023
DOB NOWStructuralPermit IssuedCENTRAL CONSTRUCTION MANAGEMENT02/15/2023
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/17/2023
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/12/2023
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP12/09/2022
DOB NOWMechanical SystemsSigned-offLMA GROUP INC11/30/2022
DOB NOWGeneral ConstructionSigned-offLMA GROUP INC11/30/2022
DOB NOWMechanical SystemsSigned-offREMODELING SPACE NY LLC09/23/2022
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC09/23/2022
DOB NOWMechanical SystemsSigned-offREMODELING SPACE NY LLC09/23/2022
DOB NOWGeneral ConstructionSigned-offBETTER BUILDERS CONCEPTS09/13/2022
DOB NOWGeneral ConstructionSigned-offNEW ENTITY LLC08/16/2022
DOB NOWGeneral ConstructionSigned-offTEKA ENTERPRISES INC07/16/2022
DOB NOWPlumbingSigned-offDELTA-SIGMA MECH CORP07/05/2022
DOB NOWStructuralPermit IssuedYATES REST GROUP LTD02/22/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/17/2022
DOB NOWSprinklersSigned-offH M SPRINKLER INC01/17/2022
DOB NOWGeneral ConstructionPermit IssuedKAY WATERPROOFING CORP01/07/2022
DOB NOWMechanical SystemsSigned-offLMA GROUP INC12/20/2021
DOB NOWGeneral ConstructionSigned-offLMA GROUP INC12/17/2021
DOB NOWGeneral ConstructionSigned-offREMODELING SPACE NY LLC12/10/2021
DOB NOWPlumbingSigned-offA.M.N. CORPORATION12/10/2021
DOB NOWMechanical SystemsSigned-offREMODELING SPACE NY LLC12/10/2021
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/09/2021
DOB NOWGeneral ConstructionPermit IssuedYATES REST GROUP LTD06/17/2021
DOB NOWPlumbingSigned-offTORR MECHANICAL LLC09/14/2020
+ 58 more permits on file
▾Field Inspections (DOB CAP) — 23
DateTypeResultReport
11/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/10/2025Pass-Final House ConnectionPassView ↗
09/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/07/2023Fail-Final CND-Occupancy InspectionFailView ↗
10/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2023No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/24/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/18/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/18/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/12/2026FinalScott Vautrinprogress
11/26/2025Fire-Resistant Penetrations and JointsThomas Morbitzerspecial
02/24/2023Fire-Resistance Rated ConstructionThomas Tsueprogress
02/24/2023Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
02/24/2023Lighting controlsThomas Tsueenergy_progress
02/24/2023Interior lighting powerThomas Tsueenergy_progress
02/24/2023Lighting in dwelling unitsThomas Tsueenergy_progress
02/24/2023FinalThomas Tsueprogress
12/20/2022Fire-Resistant Penetrations and JointsThomas Morbitzerspecial
12/20/2022FinalThomas Morbitzerprogress
12/20/2022Energy Code Compliance InspectionsThomas Morbitzerprogress
12/20/2022Fire-Resistance Rated ConstructionThomas Morbitzerprogress
12/20/2022Lighting in dwelling unitsThomas Morbitzerenergy_progress
09/07/2022FinalRONNY BECKERprogress
04/26/2022Lighting controlsEdward Zevallosenergy_progress
04/26/2022Lighting in dwelling unitsEdward Zevallosenergy_progress
04/26/2022Interior lighting powerEdward Zevallosenergy_progress
04/26/2022FinalEdward Zevallosprogress
04/26/2022Fire-Resistant Penetrations and JointsEdward Zevallosspecial
09/21/2021FinalMatthew Croninprogress
09/21/2021MasonryAnthony Volpespecial
09/21/2021Post-installed AnchorsAnthony Volpespecial
09/20/2021Maintenance informationALBERT ZIRINOenergy_progress
09/20/2021HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
09/20/2021HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
Latest 25 of 43.
▾Documents — 1,025 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch26
09/06/2026M00036346-I1Contact architect ↗
09/06/2026M00052349-I1Contact architect ↗
09/04/2026M00488148-I1Contact architect ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00380882-I1Contact architect ↗
09/04/2026M00276759-P3Contact architect ↗
09/04/2026M00276759-P2Contact architect ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00293954-I1Contact architect ↗
08/15/2026M00293954-P1Contact architect ↗
▸Applications & Permits214
▸BISWORK PERMIT APPLICATION117
09/03/2020140933603Open ↗
07/29/2020122885743Open ↗
07/07/2020122885743Open ↗
Showing 3 of 117 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION97
10/24/2022120071162Open ↗
10/24/2022103219875Open ↗
10/24/2022120323471Open ↗
Showing 3 of 97 on file for this type
▸Seals & Professional Certifications210
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION111
12/20/2019140629247Open ↗
12/20/2019140629247Open ↗
12/17/2019123868145Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature31
09/06/2026M00036346-I1Open ↗
09/05/2026M00293954-P1Open ↗
09/05/2026M00293954-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
08/31/2026M01178480-P1Open ↗
08/30/2026M07999616-I1Open ↗
08/28/2026M00833912-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/28/2026M00833912-I1Open ↗
08/28/2026M00543984-I1Open ↗
08/25/2026M00293954-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
06/08/2018140773535Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/03/2020140933603Open ↗
06/08/2018140773535Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/08/2018140773535Open ↗
Showing 1 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment105
▸BISSCHEDULE B - PLUMBING44
03/31/2021122990308Open ↗
02/23/2021122818898Open ↗
12/17/2020122990308Open ↗
Showing 3 of 44 on file for this type
▸BISSELF-CERT PLUMBING NOTICE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
04/22/2019122818898Open ↗
Showing 1 of 14 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/12/2018121286544Open ↗
Showing 1 of 3 on file for this type
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/20/2021123868145Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes13
12/17/2019123868145Open ↗
08/16/2018122885743Open ↗
04/30/2021140933603Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan6
09/04/2026M00276759-P3Open ↗
09/04/2026M00276759-P2Open ↗
09/04/2026M00276759-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos71
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/06/2026M00036346-I1Open ↗
09/05/2026M00293954-I1Open ↗
09/05/2026M00293954-P1Open ↗
Showing 3 of 28 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
08/03/2020140933603Open ↗
12/17/2019123868145Open ↗
08/16/2018122885743Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance89
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS38
12/17/2019123868145Open ↗
09/12/2019123392042Open ↗
09/12/2019123392042Open ↗
Showing 3 of 38 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS18
09/03/2021140933603Open ↗
08/19/2020122885743Open ↗
10/18/2019121790758Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
09/03/2021140933603Open ↗
04/13/2021122818898Open ↗
04/13/2021122990308Open ↗
Showing 3 of 9 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
08/15/2026M00543984-I1Open ↗
08/13/2026M00594283-I1Open ↗
08/13/2026M00594262-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
03/23/2022123868145Open ↗
04/13/2021122818898Open ↗
04/13/2021122990308Open ↗
▸BISINTERIOR LIGHTING POWER1
03/23/2022123868145Open ↗
▸BISLIGHTING IN DWELLING UNITS1
03/23/2022123868145Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/23/2022123868145Open ↗
▸BISLIGHTING CONTROLS1
03/23/2022123868145Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/03/2020140933603Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports27
▸BISTECHNICAL REPORT: RESPONSIBILITY21
11/23/2021123868145Open ↗
10/19/2021123868145Open ↗
10/18/2021123868145Open ↗
Showing 3 of 21 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
10/11/2022103219875Open ↗
09/27/2022102164765Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/10/2022123868145Open ↗
▸Approvals, Objections & Sign-offs71
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
10/20/2022120071162Open ↗
09/28/2022102164765Open ↗
07/21/2022123868145Open ↗
Showing 3 of 38 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/26/2020140933603Open ↗
08/26/2020140933603Open ↗
Showing 2 of 5 on file for this type
▸BISFINAL2
10/19/2022120071162Open ↗
03/23/2022123868145Open ↗
▸BISSHED LETTER2
03/11/2019140629247Open ↗
Showing 1 of 2 on file for this type
▸BISSUPERSEDING LETTER1
03/11/2019140629247Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M00597947-I1Open ↗
▸Cost, Insurance & Ownership88
▸BISCOST AFFIDAVIT77
09/03/2021140933603Open ↗
04/20/2021122818898Open ↗
01/27/2021122990308Open ↗
Showing 3 of 77 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT6
07/03/2018123588386Open ↗
Showing 1 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
10/19/2022120323471Open ↗
10/19/2022120071162Open ↗
07/20/2022123868145Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms93
▸BISEFILING COVER SHEET41
12/17/2019123868145Open ↗
08/16/2018122885743Open ↗
Showing 2 of 41 on file for this type
▸BISADDITIONAL INFORMATION23
04/05/2021122990308Open ↗
03/30/2021122990308Open ↗
02/24/2021122818898Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM21
12/20/2019140629247Open ↗
12/18/2019140629247Open ↗
10/18/2019121790758Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET8
08/03/2020140933603Open ↗
06/08/2018140773535Open ↗
Showing 2 of 8 on file for this type
▸Other Documents4
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M00976294-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M00488148-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00976294-I1Open ↗