← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Eastchester Heights
3457 EASTCHESTER ROAD · BIN 2117009
💬 Discuss this project
1935Year Built
6Stories
D1Building Class
R6Zoning
254,000 sfGross Floor Area
326Units
LL97 CoveredRent Stabilized710 Active Violations 707 unresolved · 3 paperwork only ▸
Elevator apt, semi-fireproof without stores · Owner of record: Eastchester Heights Housing Development Fund · 108,066 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSuspended scaffold for facade repair2p · 1 filing · 3 docs
Site & exteriorScaffolding installation and tie-ins3p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Eastchester Heights1003/22/2026
Taconic Investment Partners103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joel Phagoo P.E207/20/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold507/08/2026
Crew Contracting of NJScaffold303/21/2026
Ecny Electrical ContractorsElectrical103/22/2026
Metropolitan Electric of NY IElectrical103/22/2026
Modern Trend Electrical ContractingElectrical103/21/2026
Metropolitan Electric of NY IElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Joel Phagoo, PE2416107/20/2020
Building Lifecycle
All (75)Filed (3)Permit Issued (7)Signed Off (3)Violation (60)Special Inspection (2)
07/15/2026
Violation issued (HPD, closed)
C
07/15/2026
Violation issued (HPD, closed)
C
07/15/2026
Violation issued (HPD, open)
C
07/15/2026
Violation issued (HPD, open)
C
07/08/2026
Violation issued (HPD, open)
C
07/08/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, open)
B
06/12/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, open)
C
06/12/2026
Violation issued (HPD, closed)
C
05/08/2026
Violation issued (HPD, closed)
A
02/10/2026
Violation issued (ECB, closed)
Elevators
01/12/2026
Violation issued (ECB, closed)
Elevators
11/20/2025
Signed off — Alteration
Installation of suspended scaffold for facade repair & inspection.
X01205328-I1
10/08/2025
Violation issued (HPD, open)
C
10/08/2025
Violation issued (HPD, open)
C
08/13/2025
Violation issued (ECB, closed)
Elevators
04/15/2025
Permit issued — Suspended Scaffold
X01205328-I1-SC
04/03/2025
Filed — Alteration
Installation of suspended scaffold for facade repair & inspection.
X01205328-I1
01/09/2025
Violation issued (ECB, closed)
Elevators
12/16/2024
Violation issued (HPD, closed)
B
12/16/2024
Violation issued (HPD, closed)
B
12/16/2024
Violation issued (HPD, closed)
B
12/16/2024
Violation issued (HPD, closed)
B
11/13/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
11/03/2024
Violation issued (HPD, open)
B
11/03/2024
Violation issued (HPD, open)
C
10/31/2024
Violation issued (HPD, closed)
C
10/31/2024
Violation issued (HPD, closed)
A
10/30/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/27/2024
Violation issued (ECB, closed)
Elevators
08/27/2024
Violation issued (ECB, closed)
Elevators
08/07/2024
Violation issued (HPD, open)
C
08/07/2024
Violation issued (HPD, open)
C
08/07/2024
Violation issued (HPD, open)
A
07/12/2024
Violation issued (HPD, open)
B
07/12/2024
Violation issued (HPD, open)
B
07/12/2024
Violation issued (HPD, open)
B
06/13/2024
Violation issued (HPD, closed)
B
06/13/2024
Violation issued (HPD, closed)
C
05/29/2024
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (HPD, open)
C
04/05/2024
Violation issued (HPD, open)
B
04/05/2024
Violation issued (HPD, open)
B
03/20/2024
Violation issued (ECB, closed)
Elevators
02/22/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (HPD, closed)
C
02/22/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (HPD, open)
B
02/22/2024
Violation issued (HPD, open)
A
02/15/2024
Violation issued (HPD, open)
B
02/15/2024
Violation issued (HPD, open)
B
02/15/2024
Violation issued (HPD, open)
B
02/15/2024
Violation issued (HPD, open)
C
12/12/2023
Violation issued (ECB, open)
Elevators
11/11/2023
Violation issued (HPD, open)
B
11/11/2023
Violation issued (HPD, closed)
A
11/11/2023
Violation issued (HPD, open)
B
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offHoneybee Services04/15/2025
DOB NOWSidewalk ShedSigned-offYarks NYC11/04/2020
DOB NOWSupported ScaffoldSigned-offCrew Contracting of NJ07/21/2020
DOB NOWSidewalk ShedSigned-offYarks NYC02/21/2020
DOB NOWSidewalk ShedSigned-offYarks NYC02/08/2019
DOB NOWSidewalk ShedSigned-offYarks NYC01/11/2019
DOB NOWSidewalk ShedSigned-offYarks NYC08/24/2018
BISOTISSUEDBright Power11/18/2021
BISOTISSUEDRainier Restoration08/26/2021
BISOTISSUEDRainier Restoration07/21/2021
BISOTISSUEDBright Power03/03/2021
BISOTISSUEDBright Power03/01/2021
BISOTISSUEDBright Power Installation01/16/2020
BISOTISSUEDRainier Restoration09/12/2019
BISEQISSUEDArsenal Scaffold09/08/2014
4 projects · most recent 04/25/2022
FiledStatusContractorScope
04/25/2022CompleteMetropolitan Electric of NY I—
11/21/2021Permit IssuedModern Trend Electrical Contracting—
01/31/2020CompleteEcny Electrical Contractors2 meters, 1 new_meters
08/23/2018Permit IssuedGreen Power Electric—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/20/2020Post-installed AnchorsJOEL PHAGOOspecial
07/20/2020FinalJOEL PHAGOOprogress
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
08/26/2026X00073181-I1Request digital key ↗
08/19/2026X01205328-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00372968-I1Request digital key ↗
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION5
11/05/2021240267420Open ↗
09/21/2021240309242Open ↗
01/15/2020240267420Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION5
11/18/2021240309242Open ↗
03/03/2021240267420Open ↗
01/15/2020240267420Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications13
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
01/15/2020240267420Open ↗
09/05/2014240071471Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
01/15/2020240267420Open ↗
09/05/2014240071471Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/15/2020240267420Open ↗
09/05/2014240071471Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/09/2019220699634Open ↗
04/17/2019220699634Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026X00073181-I1Open ↗
08/13/2026X00372968-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/13/2021240309242Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026X00372968-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026X00372968-I1Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES2
01/15/2020240267420Open ↗
04/17/2019220699634Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
11/18/2021240309242Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026X00372968-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/13/2021240309242Open ↗
01/15/2020240267420Open ↗
08/26/2019220699634Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/22/2022240309242Open ↗
11/18/2021240309242Open ↗
10/13/2021240309242Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/17/2022240309242Open ↗
06/09/2022220699634Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/05/2014240071471Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/13/2021240309242Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
08/17/2022240309242Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
04/17/2019220699634Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/15/2020240267420Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
09/22/2022240309242Open ↗
06/09/2022220699634Open ↗
11/18/2021240309242Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/13/2022220699634Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
10/13/2021240309242Open ↗
01/15/2020240267420Open ↗
08/26/2019220699634Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/17/2022240309242Open ↗
06/09/2022220699634Open ↗
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET3
10/13/2021240309242Open ↗
01/15/2020240267420Open ↗
09/05/2014240071471Open ↗
▸BISADDITIONAL INFORMATION3
10/13/2021240309242Open ↗
10/13/2021240309242Open ↗
01/15/2020240267420Open ↗
▸BISEFILING COVER SHEET1
04/17/2019220699634Open ↗
▸BISBOROUGH INTAKE FORM1
03/03/2021240267420Open ↗
▸Other Documents5
▸BISDHCR DOCUMENT2
08/26/2019220699634Open ↗
08/26/2019220699634Open ↗
▸BISTax Abatement Miscellaneous1
09/27/2022240309242Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01205328-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01205328-I1Open ↗