← Back
Two family frame
3457 FT INDEPENDENCE ST
BRONX · BIN 2015998
💬 Discuss this project
1910Year Built
2Stories
B2Building Class
C8-1Zoning
1,740 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two family frame · 2,004 sf lot · 0.87 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 24p · 1 filing · 20 docs
Floor 1
Sub-Basement4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SEPTEMBER1107/08/2026
OWNER 3457 FT INDEPENDENC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RAUCH ARCHITECTURE D.P.C.710/24/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R&R CONTRACTING MGMT CORPGeneral Contractor107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
LIQUID PLBG & HTNG SCS INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAUCH ARCHITECTURE D.P.C.7888205/10/2022
Building Lifecycle
All (49)Filed (7)Permit Issued (3)Signed Off (1)Violation (3)Inspection (9)Special Inspection (26)
12/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/24/2023
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-P7
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/08/2023
Signed off — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-I1
04/13/2023
Permit issued — Plumbing
X00554860-S1-PL
06/21/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/24/2022
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-P4
05/12/2022
Special inspection requirement — Lighting controls
Matthew Rauch
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Rauch
05/12/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Matthew Rauch
05/12/2022
Special inspection requirement — Mechanical Systems
Matthew Rauch
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Matthew Rauch
05/12/2022
Special inspection requirement — Final
Matthew Rauch
05/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Rauch
05/12/2022
Special inspection requirement — Structural Wood Frame
Matthew Rauch
05/12/2022
Special inspection requirement — Interior lighting power
Matthew Rauch
05/12/2022
Special inspection requirement — Fenestration areas
Matthew Rauch
05/12/2022
Special inspection requirement — Lighting in dwelling units
Matthew Rauch
05/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Matthew Rauch
05/12/2022
Special inspection requirement — Insulation placement and R values
Matthew Rauch
05/10/2022
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-P3
05/10/2022
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-P2
05/03/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Rauch
05/03/2022
Special inspection requirement — Mechanical Systems
Matthew Rauch
05/03/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Matthew Rauch
05/03/2022
Special inspection requirement — Energy Code Compliance Inspections
Matthew Rauch
05/03/2022
Special inspection requirement — Final
Matthew Rauch
05/03/2022
Special inspection requirement — Fire-Resistance Rated Construction
Matthew Rauch
05/03/2022
Special inspection requirement — Structural Wood Frame
Matthew Rauch
05/03/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Matthew Rauch
05/03/2022
Special inspection requirement — Insulation placement and R values
Matthew Rauch
05/03/2022
Special inspection requirement — Interior lighting power
Matthew Rauch
05/03/2022
Special inspection requirement — Fenestration areas
Matthew Rauch
05/03/2022
Special inspection requirement — Lighting controls
Matthew Rauch
05/03/2022
Special inspection requirement — Lighting in dwelling units
Matthew Rauch
04/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/06/2021
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-P1
10/22/2021
Permit issued — Plumbing
X00554860-S1-PL
10/11/2021
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-S1
09/08/2021
Permit issued — General Construction
X00554860-I1-GC-CX
08/14/2021
Filed — Alteration
NEW AND RELOCATED FIXTURES PER PLANS. GAS WORK PER PLANS.
X00554860-I1
02/26/2007
Violation issued (ECB, closed)
Construction
02/23/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/1999
Violation issued (ECB, open)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedLIQUID PLBG & HTNG SCS IN04/13/2023
DOB NOWPlumbingPermit IssuedALL PRO PLBG & HTG INC10/22/2021
DOB NOWGeneral ConstructionSigned-offR&R CONTRACTING MGMT CORP09/08/2021
1 project · most recent 10/24/2023
Air Conditioning Systems Heating Systems
FiledStatusContractorScope
10/24/2023Signed-offR&R CONTRACTING MGMT CORPAir Conditioning Systems, Heating Systems
1 project · most recent 10/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/24/2023Permit IssuedWARWICK PLUMBING INCGas, Water/Sanitary
1 project · most recent 10/05/2021
General Wiring
FiledStatusContractorScope
10/05/2021Permit IssuedVILLAGE ELECTL CONTRS INCGeneral Wiring
1 project · most recent 10/24/2023
Wood
FiledStatusContractorScope
10/24/2023Permit IssuedWARWICK PLUMBING INCWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
04/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/18/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/18/2022Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/12/2022Lighting controlsMatthew Rauchenergy_progress
05/12/2022Fire-Resistant Penetrations and JointsMatthew Rauchspecial
05/12/2022Structural Stability – Alterations of existing buildingsMatthew Rauchspecial
05/12/2022Mechanical SystemsMatthew Rauchspecial
05/12/2022Energy Code Compliance InspectionsMatthew Rauchprogress
05/12/2022FinalMatthew Rauchprogress
05/12/2022Fire-Resistance Rated ConstructionMatthew Rauchprogress
05/12/2022Structural Wood FrameMatthew Rauchprogress
05/12/2022Interior lighting powerMatthew Rauchenergy_progress
05/12/2022Fenestration areasMatthew Rauchenergy_progress
05/12/2022Lighting in dwelling unitsMatthew Rauchenergy_progress
05/12/2022Fenestration and door U-factor and product ratingsMatthew Rauchenergy_progress
05/12/2022Insulation placement and R valuesMatthew Rauchenergy_progress
05/03/2022Fire-Resistant Penetrations and JointsMatthew Rauchspecial
05/03/2022Mechanical SystemsMatthew Rauchspecial
05/03/2022Structural Stability – Alterations of existing buildingsMatthew Rauchspecial
05/03/2022Energy Code Compliance InspectionsMatthew Rauchprogress
05/03/2022FinalMatthew Rauchprogress
05/03/2022Fire-Resistance Rated ConstructionMatthew Rauchprogress
05/03/2022Structural Wood FrameMatthew Rauchprogress
05/03/2022Fenestration and door U-factor and product ratingsMatthew Rauchenergy_progress
05/03/2022Insulation placement and R valuesMatthew Rauchenergy_progress
05/03/2022Interior lighting powerMatthew Rauchenergy_progress
05/03/2022Fenestration areasMatthew Rauchenergy_progress
05/03/2022Lighting controlsMatthew Rauchenergy_progress
Latest 25 of 26.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00554860-P1Request digital key ↗
08/24/2026X00554860-S1Request digital key ↗
08/24/2026X00554860-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026X00554860-I1Open ↗
08/13/2026X00554860-P3Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00554860-P3Open ↗
08/24/2026X00554860-P2Open ↗
08/24/2026X00554860-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/29/2026X00554860-I1Open ↗
09/29/2026X00554860-I1Open ↗
09/29/2026X00554860-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/29/2026X00554860-I1Open ↗
08/26/2026X00554860-P3Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026X00554860-S1Open ↗
08/24/2026X00554860-I1Open ↗
08/24/2026X00554860-P7Open ↗
Showing 3 of 7 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00554860-I1Open ↗
▸Other Documents4
▸DOB NOWPlot Diagram2
08/13/2026X00554860-I1Open ↗
08/13/2026X00554860-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026X00554860-P3Open ↗
08/13/2026X00554860-I1Open ↗