ECB07/12/2021Sidewalk shed parapet panel not provided or not in compliance w/section.noted:at time of inspection of a none active jobsite observed sidewalk shed missing parapet panel sign.remedy:comply w/code$6K due
ECB11/26/2021Work w/o permit.atoi of 3STYNB,observed needle beams installed@EXP4.upon rev dept records (BIS&dobnow) it was observed that no permit issuedfor needle beams installation.obtain permits as required.Nothing owed — awaiting certificate of correction
ECB11/26/2021Jobsite fence not const or maintained pursuant to subsec atoi of 3STYNB,observed jobsite fence installed@EXP1¬ maintained as per code.const fence covered w/gravity&illegal sign&posters maintain fence as perNothing owed — awaiting certificate of correction
ECB11/16/2021Failure to provide sidewalk shed parapet panel as required. At the time of my inspection,i observed that the sidewalk shed erections at exp#1 was missing its parapet panel as required by code. That informationNothing owed — awaiting certificate of correction
ECB02/26/2020Pedestrian protectoin does not meet code specifications.at the time ofinspection of a 3 story NB,observed sidewalk shed at exp#1 that does not meet code specifications.sidewalk shed has been damaged and detiriNothing owed — awaiting certificate of correction
ECB02/26/2020BC33012-failure to provide overhead protection for adjacent property.at the time of inspection of a 3 story NB,observed that there is no overhead protection provided for adjacent property at exp#4 to protect puNothing owed — awaiting certificate of correction
ECB02/28/2019Duties of construction superintendent.at the time of inspection of a 4STORY NB at roof level upon requesting to speak to the superintendent a person steped forward and stated his name was steve and he is the coNothing owed — awaiting certificate of correction
ECB02/28/2019BC3309.10/roof projection.at the time of inspection of new building active jobsite.at the roof level copping installed building 2 floors above adjoining property at both expo#2 and 4.the stucco not completed.iNothing owed — awaiting certificate of correction
ECB02/28/2019Failure to provide design drawings for platforms at the time of my inspction of 4 story NB active jobsite i observed a pipe scaffold in rearof building expo #3 6 sections high approx 39FT tall,the end section aNothing owed — awaiting certificate of correction
ECB02/28/2019Failure to provde adequate housekeeping.at the time of my inspection of a 4 story NB at roof level i observed at expo 3 rear yard the entirerear of the building rear yard is covered with construction debris froNothing owed — awaiting certificate of correction
ECB02/28/2019Failure to provide pedestrian protection.note:at time of inspection of new building i observed inadequate protection on exposure#2 and 4.expo#2 is a residential building with front area directly under site.expoNothing owed — awaiting certificate of correction
ECB02/28/2019BC3314.1/supported scaffold not to code specification.note:at time of inspection i observed supported scaffold in multiple locations throughout site with the follwing objections.inadequate footing-missing crossNothing owed — awaiting certificate of correction
ECB02/28/2019BC3314.1/suspended scaffold not to code specification.note;at time of inspection i observed suspended scaffold on exposure #2 in use with the following obsjections.damaged/bent scaffold frames that support theNothing owed — awaiting certificate of correction
ECB02/28/2019Failure to provide signage as requires.note:at time of inspection of new building with on going work i did not observe florr designation signs in conspicious areas on any floors,no floor designation signs poseNothing owed — awaiting certificate of correction
ECB02/28/2019Failure to provide approved construction documents on site at the timeof inspection of new building active jobsite.upon request site failed to provide plans for for suspended scaffold,supported scaffold and sidNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB09/02/2020Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2020; DOB's record still lists it as active
DOB05/29/2019Failure to certify correction on immediately hazardous (class 1) ECB violationIssued 2019; DOB's record still lists it as active4 identical filings
Contractors warehouse · Owner of record: AAA- Arrow Realty · 2,504 sf lot · 2 FAR built · Flood zone X