DOB09/02/2020FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/11/2020OBSERVED ON 02/11/20 AT 4PM AT EXPOSURE #3 ROOF JOISTS WERE REPLACED AND REFRAMED ALONG WITH THE SUB STRAIGHTS FOR THE REAR PORTION OF THE ROOF. FULL HEIGHT PARTITION FRAMING OBSERVED ON THE 2ND FLOOR FROM REAR$12K due
HPD01/05/2016SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ( 12'' X12'' ) CEILING TILES IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... PRESENT AT SOUTH WALL ( APPROX- 16 SQ,FT ) IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES ... IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY
HPD01/05/2016SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE ( 12'' X 12'' ) CEILING TILES IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 1, 1st STORY