Roof8p · 6 filings · 20 docs
ElectricalFire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 5 drawing sheets
Application for the installation and use of mini-crane and mobile equipment at 346 Kent Avenue (aka 350 Kent Avenue) as per plans filed herein. No change in egress, use or occupancy.
On file for this job
8 documents · 1 drawing sheet
Installation of (4) boilers in conjunction with construction of New Building #321914310. New building and all associated filings to be reviewed under the 2008 Building Code per BB 2014-015.
On file for this job
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Bulkhead3p · 1 filing · 14 docs
Fire Protection
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Floor 561p · 1 filing · 5 docs
Mechanical
Installation of (4) boilers in conjunction with construction of New Building #321914310. New building and all associated filings to be reviewed under the 2008 Building Code per BB 2014-015.
On file for this job
5 documents · 1 drawing sheet
Floor 55
Floor 542p · 1 filing · 14 docs
Fire Protection
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Floor 532p · 2 filings · 9 docs
GeneralMechanical
Issued Permit Scope
Protection and Mechanical Methods
Installation of (4) boilers in conjunction with construction of New Building #321914310. New building and all associated filings to be reviewed under the 2008 Building Code per BB 2014-015.
On file for this job
5 documents · 1 drawing sheet
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 523p · 2 filings · 18 docs
Fire ProtectionGeneral
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 512p · 3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 503p · 3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 492 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 482 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 472 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 462 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 452 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 442 filings · 7 docs
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 432p · 3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 422p · 3 filings · 20 docs
Fire ProtectionGeneral
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 412p · 3 filings · 20 docs
Fire Protection
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents
Floor 403p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 396p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 5 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 387p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 6 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 375p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 4 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 365p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 4 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 353p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 343p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 333p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 323p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 313p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 302p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 1 drawing sheet
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 294p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 282p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 1 drawing sheet
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 273p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 266p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 5 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 254p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 2419p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Temporary Use Permit for a sales office, including model units pursuant to section AC 28-111 & BB 2010-002. Filed in conjunction with NB #320914310.
On file for this job
20 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Latest 3 of 4 filings on this floor.
Floor 234p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 224p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 214p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 205p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 4 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 193p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 184p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 174p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 164p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 154p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 144p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 134p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 123p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 111p · 2 filings · 7 docs
Mechanical
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 103p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 91p · 2 filings · 7 docs
Mechanical
Issued Permit Scope
Protection and Mechanical Methods
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 82p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 1 drawing sheet
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 75p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 2 drawing sheets
Floor 64p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 3 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 53p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 1 drawing sheet
Floor 44p · 3 filings · 20 docs
Fire ProtectionMechanical
Issued Permit Scope
Protection and Mechanical Methods
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Installation of temporary alternate protection as per plans filed herewith. This application is filed in conjunction with NB 320914310
On file for this job
3 documents
Exterior supported working and loading platform to be used on the typical floors to load and unload the materials. No changes to the use or to the egress. This application is filed in conjunction with NB 320914310
On file for this job
4 documents · 2 drawing sheets
Floor 32p · 1 filing · 14 docs
Fire Protection
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Floor 219p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneral
Issued Permit Scope
General Construction
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 2 drawing sheets
Temporary Use Permit for a sales office, including model units pursuant to section AC 28-111 & BB 2010-002. Filed in conjunction with NB #320914310.
On file for this job
20 documents · 4 drawing sheets
Floor 1Under Construction12p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE. INSTALL NEW COUNTERTOPS, CABINETRY, BATHROOM, AND FINISHING WORK AS PER PLANS.
On file for this job
2 documents
INSTALL NEW EXHAUST SYSTEM TYPE I FOR COMMERCIAL KITCHEN HOOD IN NEW RESTAURANT TAKE OUT/ NO CHANGE OCCUPANCY OR EGRESS
On file for this job
6 documents · 1 drawing sheet
INTERIOR RENOVATION IN EXISTING COMMERCIAL SPACE. INSTALL NEW BATHROOMS, KITCHENS, BARS, AND FINISHES AS PER PLANS. ALL PL, MS, AND PA APPLICATIONS TO BE FILED SEPARATELY. NB APPLICATION FILED AND APPROVED UNDER 320914310.
On file for this job
9 documents
Latest 3 of 4 filings on this floor.
Mezzanine4p · 1 filing · 14 docs
Fire Protection
Sprinkler/Standpipe installation in conjunction w/ NB #320914310.
On file for this job
14 documents · 4 drawing sheets
Cellar1p · 1 filing · 4 docs
Plumbing
Underground plumbing in conjunction w/NB #320914310.
On file for this job
4 documents · 1 drawing sheet