Office with commercial, 7-19 stories
346 MADISON AVENUE
MANHATTAN · Midtown-Times Square · BIN 1035370
💬 Discuss this project
1915Year Built
11Stories
O6Building Class
C5-3Zoning
140,280 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 3 unresolved · 11 paperwork only ▸FISP: No Report Filed
Office with commercial, 7-19 stories · Owner of record: 346 MADISON AVENUE, LLC · 13,125 sf lot · 10.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 5 docs
Floor 11Under Construction3 filings · 11 docs
Floor 10Under Construction1p · 5 filings · 18 docs
Floor 9Under Construction1p · 5 filings · 18 docs
Floor 8Under Construction2p · 6 filings · 20 docs
Floor 7Under Construction1p · 5 filings · 18 docs
Floor 6Under Construction1p · 5 filings · 18 docs
Floor 5Under Construction2p · 6 filings · 20 docs
Floor 4Under Construction2p · 6 filings · 20 docs
Floor 3Under Construction3p · 7 filings · 20 docs
Floor 2Under Construction3p · 6 filings · 20 docs
Floor 1Under Construction6p · 5 filings · 18 docs
CellarUnder Construction2p · 3 filings · 11 docs
Basement1p · 1 filing · 5 docs
Sub-BasementUnder Construction1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL GREEN REALTY909/29/2026
CASA GROUP209/01/2026
346 MADISON AVENUE17403/22/2026
DELV HOLDINGS203/21/2026
346 MADISON203/21/2026
346 MADISON AVENUE LLA103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2025$85.0M—346 MADISON AVENUE, LLC → 346 MADISON AVENUE OWNER LLC$606/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION203/21/2026
NEXUS CONSULTING NYC, INC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E BRIDGE & SCAFFOLD LLC.General Contractor809/10/2026
BREEZE NATIONAL INCGeneral Contractor609/29/2026
JOSEPH ROMAGNOLOElectrical103/21/2026
MAYO, EUGENEElectrical103/21/2026
NICHOLAS, GILBERTElectrical103/21/2026
PEDERSON, RONALDElectrical103/21/2026
BLAKE, PETERElectrical103/21/2026
SWEET, ROBERTElectrical103/21/2026
F.S. SITE CORPFire Protection108/16/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
PUGLIESE FRANKElectrical103/21/2026
FRANK PUGLIESEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G. BLINN CONSULTING, LLC2894508/19/2026
SHAHRISH SHUVO ENGINEERIN8524108/10/2026
HRF SERVICES CORP5616108/29/2024
Building Lifecycle
All (139)Filed (31)Permit Issued (16)Signed Off (1)Facade (FISP) (9)Violation (60)Inspection (4)Objection (4)Special Inspection (14)
09/28/2026
Permit issued — General Construction
M01412342-I1-GC
09/28/2026
Permit issued — General Construction
M01438941-I1-GC
09/14/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-A3
09/09/2026
Permit issued — Sidewalk Shed
M01416533-S1-SH
08/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S4
08/25/2026
Permit issued — Protection and Mechanical Methods
M01416533-S4-PMM
08/21/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-A2
08/20/2026
Special inspection requirement — Final
LUIS VALDERRUTEN
08/19/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P9
08/19/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-A1
08/19/2026
Permit issued — General Construction
M01412292-I1-GC
08/18/2026
Filed — Alteration
Interior demo of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans
M01409210-P1
08/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Special inspection requirement — Post-installed Anchors
GREG BLINN
08/14/2026
Permit issued — General Construction
M01412344-I1-GC
08/14/2026
Permit issued — Standpipe
M01438214-I1-EW-SD
08/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P8
08/11/2026
Special inspection requirement — Final
LUIS VALDERRUTEN
08/10/2026
Filed — Alteration
Install temporary dry standpipe system with air pressurized alarm system during renovation of the building.
M01438214-I1
08/07/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P3
08/06/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P7
08/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/06/2026
Special inspection requirement — Post-installed Anchors
Shahrish Shuvo
08/05/2026
Filed — Alteration
Debris Chute
M01412292-I1
08/05/2026
Filed — Alteration
Glass Wall Demolition
M01438941-I1
08/05/2026
Special inspection requirement — Post-installed Anchors
GREG BLINN
07/30/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P6
07/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2026
Special inspection requirement — Final
LUIS VALDERRUTEN
07/29/2026
Objection resolved — Resolved
07/29/2026
Special inspection requirement — Standpipe Systems
Shahrish Shuvo
07/27/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P4
07/27/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P5
07/22/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P1
07/22/2026
Filed — Alteration
Demolition of rooftop mechanical units (HVAC and MEP) and supporting dunnage, cooling towers, tanks, and sealed skylights.
M01412342-I1
07/15/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S7
07/15/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-P2
07/15/2026
Permit issued — Protection and Mechanical Methods
M01416533-S7-PMM
07/13/2026
Permit issued — Protection and Mechanical Methods
M01416533-S6-PMM
07/13/2026
Permit issued — Protection and Mechanical Methods
M01416533-S5-PMM
07/10/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S6
07/10/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S5
07/10/2026
Objection raised — Admin
07/10/2026
Special inspection requirement — Final
06/22/2026
Permit issued — Supported Scaffold
M01416533-S2-SF
06/22/2026
Permit issued — General Construction
M01409210-I1-GC
06/18/2026
Filed — Alteration
M01412344-I1
06/18/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S2
06/18/2026
Permit issued — Construction Fence
M01416533-I1-FN
06/18/2026
Permit issued — Sidewalk Shed
M01416533-S1-SH
06/18/2026
Permit issued — Protection and Mechanical Methods
M01416533-S3-PMM
06/17/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S1
06/17/2026
Filed — Full Demolition
PMM FD equipment use
M01412252-I1
06/17/2026
Filed — Alteration
Interior demo of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans
M01409210-I1
06/17/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-I1
06/17/2026
Filed — Alteration
TEMPORARY NEEDLE BEAM SYSTEM AS PER DRAWINGS. NEEDLE BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01416533-S3
06/16/2026
Special inspection requirement — Demolition
06/12/2026
Special inspection requirement — Final
LUIS VALDERRUTEN
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBREEZE NATIONAL INC09/28/2026
DOB NOWGeneral ConstructionPermit IssuedBREEZE NATIONAL INC09/28/2026
DOB NOWSidewalk ShedPermit IssuedS&E BRIDGE & SCAFFOLD LLC.09/09/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBREEZE NATIONAL INC08/25/2026
DOB NOWGeneral ConstructionPermit IssuedBREEZE NATIONAL INC08/19/2026
DOB NOWGeneral ConstructionPermit IssuedBREEZE NATIONAL INC08/14/2026
DOB NOWStandpipePermit IssuedF.S. SITE CORP08/14/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E BRIDGE & SCAFFOLD LLC.07/15/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E BRIDGE & SCAFFOLD LLC.07/13/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E BRIDGE & SCAFFOLD LLC.07/13/2026
DOB NOWSupported ScaffoldPermit IssuedS&E BRIDGE & SCAFFOLD LLC.06/22/2026
DOB NOWGeneral ConstructionPermit IssuedBREEZE NATIONAL INC06/22/2026
DOB NOWConstruction FencePermit IssuedS&E BRIDGE & SCAFFOLD LLC.06/18/2026
DOB NOWSidewalk ShedPermit IssuedS&E BRIDGE & SCAFFOLD LLC.06/18/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E BRIDGE & SCAFFOLD LLC.06/18/2026
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC07/03/2019
BISPLISSUEDL&J PLG & HTG CO OF NY IN10/03/2018
BISOTISSUEDSTRUCTURE VENTURES LLC10/01/2018
BISPLISSUEDASPRO PLUMBING INC03/05/2018
BISSPISSUEDASHLAR MECHANICAL CORP06/12/2017
BISSPISSUEDALLSTATE SPRINKLER LLC09/12/2016
BISPLISSUEDA & M WARSHAW PLBG & HTG08/26/2016
BISMHISSUEDCERTIFIED OF N.Y. INC08/24/2016
BISOTRE-ISSUEDCERTIFIED OF N.Y. INC08/24/2016
BISOTISSUEDPERMASTEELISA NORTH AMERI08/03/2016
BISSPISSUEDASHLAR MECHANICAL CORP02/19/2016
BISPLISSUEDASPRO PLUMBING INC01/27/2016
BISSPISSUEDASHLAR MECHANICAL CORP12/30/2015
BISOTISSUED4 STAR CONTRACTING INC05/19/2015
BISEQISSUEDEVEREST SCAFFOLDING INC03/09/2015
BISPLISSUEDASPRO PLUMBING INC01/09/2015
BISOTISSUEDSTORECRAFTERS, INC01/08/2015
BISMHISSUEDSTORECRAFTERS, INC01/08/2015
BISMHISSUEDSTORECRAFTERS, INC11/19/2014
BISOTISSUEDSTORECRAFTERS, INC11/19/2014
BISOTISSUED4 STAR CONTRACTING INC11/12/2014
BISSPISSUEDASHLAR MECHANICAL CORP03/31/2014
BISOTISSUEDSTORECRAFTERS, INC02/19/2014
BISOTISSUEDSTORECRAFTERS, INC01/21/2014
BISMHISSUEDSTORECRAFTERS, INC01/21/2014
+ 26 more permits on file
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026Permit IssuedF.S. SITE CORP26 outlets
1 project · most recent 08/10/2026
FiledStatusContractorScope
08/10/2026———
6 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedREDGRAVE ELECTL MAINTNCE—
07/21/2026Permit IssuedNASH ELECTRIC SERVICES IN—
06/23/2026Permit IssuedREDGRAVE ELECTL MAINTNCE—
06/16/2026Permit IssuedNASH ELECTRIC SERVICES IN—
04/29/2020CompleteE-J ELEC. INSTALLATION COGeneral Wiring
06/28/2019CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 09/14/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
09/14/2026Permit IssuedS&E BRIDGE & SCAFFOLD LLCFence, Scaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/20/2026FinalLUIS VALDERRUTENprogress
08/17/2026Post-installed AnchorsGREG BLINNspecial
08/11/2026FinalLUIS VALDERRUTENprogress
08/06/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/06/2026Post-installed AnchorsShahrish Shuvospecial
08/05/2026Post-installed AnchorsGREG BLINNspecial
07/30/2026FinalLUIS VALDERRUTENprogress
07/29/2026Standpipe SystemsShahrish Shuvospecial
07/10/2026Final—progress
06/16/2026Demolition—special
06/12/2026FinalLUIS VALDERRUTENprogress
06/04/2026Structural Stability – Alterations of existing Buildings—special
06/04/2026FinalLUIS VALDERRUTENprogress
06/27/2019FinalPAUL BAILEYprogress
▾Documents — 788 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/16/2026M01412252-I1Request digital key ↗
08/16/2026M01412344-I1Request digital key ↗
08/16/2026M01412342-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/01/2026M08050533-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00186395-I1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION83
09/20/2018123561010Open ↗
09/20/2018123561010Open ↗
01/25/2017122868824Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION71
10/04/2018123561010Open ↗
10/01/2018123561010Open ↗
07/03/2017122103080Open ↗
Showing 3 of 71 on file for this type
▸Seals & Professional Certifications216
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION101
01/10/2020122868824Open ↗
02/19/2019123561010Open ↗
02/19/2019123561010Open ↗
Showing 3 of 101 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST37
09/20/2018123561010Open ↗
09/22/2016122451792Open ↗
09/02/2016122868824Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM33
01/28/2014121894076Open ↗
01/28/2014121894076Open ↗
Showing 2 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
09/20/2018123561010Open ↗
09/20/2018123561010Open ↗
09/22/2016122451792Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/27/2026M01416533-A3Open ↗
09/27/2026M01416533-A4Open ↗
09/27/2026M01416533-A5Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026M00186395-I1Open ↗
08/27/2026M01412344-I1Open ↗
08/26/2026M01409210-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/24/2026M01438214-I1Open ↗
08/28/2026M01416533-P7Open ↗
08/25/2026M01416533-P9Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/06/2015140317734Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/06/2015140317734Open ↗
▸Trade Schedules & Equipment92
▸BISSELF-CERT PLUMBING NOTICE37
02/04/2015122103071Open ↗
05/03/2014121778497Open ↗
Showing 2 of 37 on file for this type
▸BISSCHEDULE B - PLUMBING25
12/03/2013121826532Open ↗
Showing 1 of 25 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA13
05/08/2018122195356Open ↗
01/06/2014121355434Open ↗
01/06/2014121336919Open ↗
Showing 3 of 13 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
09/20/2018123561010Open ↗
01/25/2017122868824Open ↗
01/20/2017122868824Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE PERMITS1
12/17/2013121154026Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/18/2013121154026Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
09/02/2016122868824Open ↗
08/08/2016122828324Open ↗
▸DOB NOWTenant Protection Plan1
09/05/2026M00186395-I1Open ↗
▸Environmental & Asbestos76
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)24
09/20/2018123561010Open ↗
09/22/2016122451792Open ↗
09/16/2016122195356Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026M01409210-P1Open ↗
08/16/2026M01412342-I1Open ↗
08/16/2026M01438941-I1Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
04/04/2014121778497Open ↗
01/28/2014121894076Open ↗
Showing 2 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWOER: Notice to Proceed2
09/05/2026M00186395-I1Open ↗
08/13/2026M01097672-I1Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWOER: Notice of Satisfaction1
09/05/2026M00186395-I1Open ↗
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
01/10/2020122868824Open ↗
11/05/2018121826523Open ↗
09/20/2018123561010Open ↗
Showing 3 of 15 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
01/10/2020122868824Open ↗
02/19/2019123561010Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
03/06/2015140317734Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/06/2015140317734Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs57
▸BISADMINISTRATIVE OBJECTIONS35
09/10/2014122111543Open ↗
Showing 1 of 35 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
01/15/2020122451792Open ↗
01/15/2020122195356Open ↗
01/10/2020122868824Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/19/2019123561010Open ↗
Showing 1 of 4 on file for this type
▸Cost, Insurance & Ownership80
▸BISCOST AFFIDAVIT80
01/15/2020122451792Open ↗
01/15/2020122195356Open ↗
01/10/2020122868824Open ↗
Showing 3 of 80 on file for this type
▸Filing & Intake Forms75
▸BISEFILING COVER SHEET57
09/20/2018123561010Open ↗
09/20/2018123561010Open ↗
09/22/2016122451792Open ↗
Showing 3 of 57 on file for this type
▸BISADDITIONAL INFORMATION7
03/20/2017122103080Open ↗
Showing 1 of 7 on file for this type
▸BISBOROUGH INTAKE FORM6
01/15/2020122451792Open ↗
01/15/2020122195356Open ↗
01/10/2020122868824Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet5
03/06/2015140317734Open ↗
Showing 1 of 5 on file for this type
▸Other Documents3
▸BISPC FILING CLUSTER DETAILS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructure Photographs1
08/14/2026M01412252-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026M01412252-I1Open ↗