HPD06/10/2024HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD06/10/2024§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERBALANCE AT LOWER SASH AT SOUTH 2 WINDOW IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH
HPD05/29/2018§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION .. 1st RISER FROM SOUTH AT WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
DOB03/01/2013VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
DOB12/13/2011VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
HPD06/22/2011§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE BELL-BUZZER/INTERCOM SYSTEM IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY
DOB12/31/2009V-DOB VIOLATION - ACTIVE
HPD04/16/2008§ 185, 240 M/D LAW PROPERLY FIRE RETARD IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT THE CELLAR CEILING .. AT CELLAR
DOB01/03/2008V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB01/31/2005V-DOB VIOLATION - ACTIVE
DOB02/13/2004V-DOB VIOLATION - ACTIVE
DOB03/19/2003V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB05/04/1998V-DOB VIOLATION - ACTIVE
DOB08/29/1995V-DOB VIOLATION - ACTIVE