← Back
Miscellaneous two family
346 WEST 121 STREET
MANHATTAN · Harlem (South) · BIN 1059155
💬 Discuss this project
1901Year Built
3Stories
B9Building Class
R7BZoning
3,600 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,514 sf lot · 2.38 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 8 docs
Floor 2Under Construction23p · 2 filings · 20 docs
Floor 1Under Construction29p · 3 filings · 20 docs
CellarUnder Construction35p · 3 filings · 20 docs
Sub-BasementUnder Construction27p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EDMUND LEWIS CONTRACTING403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/19/2024$3.3M—— → —$910/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ERIC K. DANIELS ARCHITECT, PC604/13/2026
OLD STRUCTURES ENGINEERING201/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY LINE INTERIORS INCGeneral Contractor304/09/2026
ETHOS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ERIC K. DANIELS ARCHITECT4060402/18/2026
CHEN ENGINEERING SERVICES1826109/29/2025
Building Lifecycle
All (65)Filed (8)Permit Issued (4)Violation (8)Inspection (9)Objection (6)Special Inspection (30)
09/02/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Eric Daniels
04/22/2026
Special inspection requirement — Final
Eric Daniels
04/22/2026
Special inspection requirement — Lighting in dwelling units
Eric Daniels
04/22/2026
Special inspection requirement — Insulation placement and R values
04/22/2026
Special inspection requirement — Air barrier - visual inspection
04/22/2026
Special inspection requirement — Fenestration air leakage
04/22/2026
Special inspection requirement — Interior lighting power
Eric Daniels
04/22/2026
Special inspection requirement — Lighting controls
Eric Daniels
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/22/2026
Special inspection requirement — Fenestration areas
04/22/2026
Special inspection requirement — Masonry
Eric Daniels
04/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Daniels
04/13/2026
Filed — Alteration
CAP AND REMOVE, REPLACE, RELOCATE, AND INSTALL NEW PLUMBING FIXTURES AS INDICATED ON PLANS. NO CHANGE TO EGRESS, BULK OR OCCUPANCY.
M01168120-P1
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/20/2026
Permit issued — Structural
M01205297-I1-ST
03/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2026
Special inspection requirement — Structural Steel - Details
HENLIA CHEN
03/12/2026
Special inspection requirement — Structural Steel - Welding
HENLIA CHEN
03/12/2026
Special inspection requirement — Structural Steel - High Strength Bolting
HENLIA CHEN
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
HENLIA CHEN
03/12/2026
Special inspection requirement — Post-installed Anchors
HENLIA CHEN
03/12/2026
Special inspection requirement — Concrete - Cast-In-Place
HENLIA CHEN
03/12/2026
Special inspection requirement — Final
HENLIA CHEN
03/12/2026
Special inspection requirement — Structural Wood Frame
HENLIA CHEN
03/05/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/25/2026
Objection resolved — Addressed
02/18/2026
Filed — Alteration
INSTALLATION OF NEW SPLIT SYSTEM, BATHROOM, & KITCHEN EXHAUST AS PER PLANS. EXISTING EXTERIOR WALLS TO REMAIN. NO CHANGE TO EGRESS, BULK, OR OCCUPANCY.
M01173043-P2
02/18/2026
Objection raised — Admin
02/16/2026
Special inspection requirement — Fenestration areas
02/16/2026
Special inspection requirement — Fenestration air leakage
02/16/2026
Special inspection requirement — Insulation placement and R values
02/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
02/16/2026
Special inspection requirement — Air barrier - visual inspection
01/28/2026
Filed — Alteration
PROPOSED STRUCTURAL WORK TO CREATE FLOOR & WALL OPENINGS FOR NEW STAIRWAY FOR BASEMENT & FIRST FLOORS. MODIFICATIONS TO CELLAR WINDOW AND OPENINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01205297-P1
01/26/2026
Special inspection requirement — Interior lighting power
Eric Daniels
01/26/2026
Special inspection requirement — Lighting controls
Eric Daniels
01/26/2026
Special inspection requirement — Lighting in dwelling units
Eric Daniels
12/02/2025
Permit issued — Mechanical Systems
M01173043-S1-MS
11/26/2025
Objection resolved — Addressed
11/26/2025
Objection resolved — Addressed
11/13/2025
Permit issued — Plumbing
M01168120-I1-PL
11/12/2025
Filed — Alteration
INSTALLATION OF NEW SPLIT SYSTEM, BATHROOM, & KITCHEN EXHAUST AS PER PLANS. EXISTING EXTERIOR WALLS TO REMAIN. NO CHANGE TO EGRESS, BULK, OR OCCUPANCY.
M01173043-P1
11/10/2025
Permit issued — General Construction
M01173043-I1-GC
10/15/2025
Objection raised — Admin
10/15/2025
Objection raised — Admin
09/29/2025
Filed — Alteration
PROPOSED STRUCTURAL WORK TO CREATE FLOOR & WALL OPENINGS FOR NEW STAIRWAY FOR BASEMENT & FIRST FLOORS. MODIFICATIONS TO CELLAR WINDOW AND OPENINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01205297-I1
01/31/2025
Filed — Alteration
INSTALLATION OF NEW SPLIT SYSTEM, BATHROOM, & KITCHEN EXHAUST AS PER PLANS. EXISTING EXTERIOR WALLS TO REMAIN. NO CHANGE TO EGRESS, BULK, OR OCCUPANCY.
M01173043-I1
01/31/2025
Filed — Alteration
INSTALLATION OF NEW SPLIT SYSTEM, BATHROOM, & KITCHEN EXHAUST AS PER PLANS. EXISTING EXTERIOR WALLS TO REMAIN. NO CHANGE TO EGRESS, BULK, OR OCCUPANCY.
M01173043-S1
01/31/2025
Filed — Alteration
CAP AND REMOVE, REPLACE, RELOCATE, AND INSTALL NEW PLUMBING FIXTURES AS INDICATED ON PLANS. NO CHANGE TO EGRESS, BULK OR OCCUPANCY.
M01168120-I1
07/08/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedCITY LINE INTERIORS03/20/2026
DOB NOWMechanical SystemsPermit IssuedCITY LINE INTERIORS12/02/2025
DOB NOWPlumbingPermit IssuedETHOS PLUMBING CORP11/13/2025
DOB NOWGeneral ConstructionPermit IssuedCITY LINE INTERIORS11/10/2025
BISSPISSUEDANCHOR PLUMBING CORP12/13/2002
BISPLISSUEDP.S.I. MECHANICAL10/15/2002
BIS—ISSUEDEL CONTRACTING AND PAINTING CORP11/14/2001
BISOTISSUEDE1 CONTRACTING & PAINTING06/28/2001
1 project · most recent 02/18/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedCITY LINE INTERIORS INCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Whisperkool MINI CELING MOUNT H.E. S-WKCMMINI-220-4 2,442 BTU · Fan Coil Indoor ×4
Heat / Cool
Mitsubishi Electric PFKY-P12-NLMU-E-TH 12,000 BTU · Vrf Indoor ×8
MXZ-SM36NAM-U1 36,000 BTU · Condensing Unit ×4
PKFY-P06-NBMU-E 6,000 BTU · Vrf Indoor ×4
1 project · most recent 11/20/2025
General Wiring
FiledStatusContractorScope
11/20/2025Permit IssuedNYCO ELECTRIC CORPGeneral Wiring
1 project · most recent 01/28/2026
Steel Concrete
FiledStatusContractorScope
01/28/2026Permit IssuedCITY LINE INTERIORS INCSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/02/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/22/2026Fire-Resistance Rated ConstructionEric Danielsprogress
04/22/2026FinalEric Danielsprogress
04/22/2026Lighting in dwelling unitsEric Danielsenergy_progress
04/22/2026Insulation placement and R values—energy_progress
04/22/2026Air barrier - visual inspection—energy_progress
04/22/2026Fenestration air leakage—energy_progress
04/22/2026Interior lighting powerEric Danielsenergy_progress
04/22/2026Lighting controlsEric Danielsenergy_progress
04/22/2026Fenestration and door U-factor and product ratings—energy_progress
04/22/2026Fenestration areas—energy_progress
04/22/2026MasonryEric Danielsspecial
04/22/2026Excavations - Sheeting, Shoring, and Bracing—special
04/22/2026Fire-Resistant Penetrations and JointsEric Danielsspecial
03/12/2026Structural Steel - DetailsHENLIA CHENspecial
03/12/2026Structural Steel - WeldingHENLIA CHENspecial
03/12/2026Structural Steel - High Strength BoltingHENLIA CHENspecial
03/12/2026Structural Stability – Alterations of existing buildingsHENLIA CHENspecial
03/12/2026Post-installed AnchorsHENLIA CHENspecial
03/12/2026Concrete - Cast-In-PlaceHENLIA CHENspecial
03/12/2026FinalHENLIA CHENprogress
03/12/2026Structural Wood FrameHENLIA CHENprogress
02/16/2026Fenestration areas—energy_progress
02/16/2026Fenestration air leakage—energy_progress
02/16/2026Insulation placement and R values—energy_progress
02/16/2026Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 44.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026M01205297-P1Request digital key ↗
08/19/2026M01205297-I1Request digital key ↗
08/19/2026M01173043-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
06/14/2024103122201Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature13
09/29/2026M01173043-I1Open ↗
09/29/2026M01173043-I1Open ↗
09/29/2026M01173043-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/29/2026M01173043-I1Open ↗
09/29/2026M01173043-I1Open ↗
08/28/2026M01173043-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026M01205297-P1Open ↗
08/19/2026M01205297-I1Open ↗
08/19/2026M01173043-P2Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist4
08/17/2026M01168120-P1Open ↗
08/13/2026M01173043-P2Open ↗
08/13/2026M01168120-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026M01205297-P1Open ↗
08/19/2026M01205297-I1Open ↗
08/19/2026M01173043-P1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
06/18/2024103122201Open ↗