← Back
Elevator apt, semi-fireproof with stores
346 WEST 53 STREET
MANHATTAN · Hell's Kitchen · BIN 1070020
💬 Discuss this project
1987Year Built
6Stories
D7Building Class
R8Zoning
8,397 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 346 WEST 53 ST RLTYCORP · 2,008 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Bulkhead2p · 1 filing · 17 docs
Floor 61p · 1 filing · 17 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANVITO REALTY HOLDING2707/08/2026
ZKW ENTERPRISES907/08/2026
346 WEST 53 ST RLTYCORP2403/22/2026
346 WEST 53RD STREET REALTY903/22/2026
346 W 53 ST REALTY703/22/2026
346 W 53ST REALTY CORP103/22/2026
346 WEST 56 STREET REALTY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION501/15/2026
M. BAZAC ARCHITECT310/10/2025
ASR ENGINEERING PC105/23/2024
INDRAJEET VAGHA PE105/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING1003/21/2026
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TERRA CONSTRUCT CORPGeneral Contractor507/08/2026
ZKW ENTERPRISES INCGeneral Contractor507/08/2026
SANVITO REALTY HOLDING CORPGeneral Contractor307/08/2026
MEJ PLUMBING LLCPlumbing307/08/2026
NICHOLAS BLASONEElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355501/15/2026
INTERNATIONAL GEOTEHCNICA1795110/10/2025
M. BAZAC ARCHITECT6653210/10/2025
M. BAZAC ARCHITECT9553107/27/2023
Building Lifecycle
All (121)Filed (10)Permit Issued (9)Signed Off (3)Violation (60)Inspection (2)Objection (8)Special Inspection (29)
02/02/2026
Signed off — Alteration
Filing for nine (9) replacement hybrid Electric Water Heaters located in roof bulkhead. Removal of nine (9) residential Gas Stoves and Gas Meters
M00956881-I1
01/15/2026
Filed — Alteration
Filing for nine (9) replacement hybrid Electric Water Heaters located in roof bulkhead. Removal of nine (9) residential Gas Stoves and Gas Meters
M00956881-P4
01/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
01/12/2026
Special inspection requirement — Maintenance information
Steven Bendoraitis
01/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
01/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
01/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
11/12/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/12/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/10/2025
Filed — Alteration
Filing for nine (9) replacement hybrid Electric Water Heaters located in roof bulkhead. Removal of nine (9) residential Gas Stoves and Gas Meters
M00956881-P3
11/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
11/06/2025
Special inspection requirement — Tenant Protection Plan Compliance
11/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
11/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
11/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
11/06/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
11/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
11/05/2025
Filed — Alteration
Filing for nine (9) replacement hybrid Electric Water Heaters located in roof bulkhead. Removal of nine (9) residential Gas Stoves and Gas Meters
M00956881-P2
10/22/2025
Signed off — Alteration
M01055083-I1
10/10/2025
Filed — Alteration
NEW KITCHENS, NEW HOT WATER HEATERS ON ROOF IN ENLARGED MECHANICAL ROOM, NEW HVAC UNITS ON ROOF AND INSIDE APARTMENTS.
M00906741-P1
10/08/2025
Permit issued — General Construction
M00906741-I1-GC-CX
07/07/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
B
06/25/2025
Violation issued (HPD, closed)
B
05/08/2025
Permit issued — Sidewalk Shed
M01055083-I1-SH
02/27/2025
Permit issued — General Construction
M00906741-I1-GC-CX
09/23/2024
Objection resolved — Addressed
09/13/2024
Permit issued — General Construction
M00906741-I1-GC-CX
09/10/2024
Objection raised — Other
09/10/2024
Objection resolved — Addressed
09/05/2024
Objection raised — Other
09/02/2024
Filed — Alteration
NEW KITCHENS, NEW HOT WATER HEATERS ON ROOF IN ENLARGED MECHANICAL ROOM, NEW HVAC UNITS ON ROOF AND INSIDE APARTMENTS.
M00906741-S1
08/29/2024
Special inspection requirement — Final
08/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
08/29/2024
Special inspection requirement — Mechanical Systems
08/26/2024
Violation issued (ECB, closed)
Construction
08/07/2024
Violation issued (ECB, closed)
Elevators
05/28/2024
Permit issued — Sidewalk Shed
M01055083-I1-SH
05/23/2024
Filed — Alteration
M01055083-I1
04/18/2024
Signed off — Alteration
M00875485-I1
04/09/2024
Violation issued (HPD, closed)
C
04/09/2024
Violation issued (HPD, closed)
C
02/22/2024
Filed — Alteration
Filing for nine (9) replacement hybrid Electric Water Heaters located in roof bulkhead. Removal of nine (9) residential Gas Stoves and Gas Meters
M00956881-P1
02/07/2024
Violation issued (HPD, closed)
A
02/06/2024
Special inspection requirement — Maintenance information
Steven Bendoraitis
02/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
02/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
02/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
02/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
02/06/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
02/02/2024
Permit issued — General Construction
M00906741-I1-GC-CX
01/31/2024
Violation issued (HPD, closed)
I
01/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2024
Violation issued (HPD, closed)
B
01/05/2024
Violation issued (HPD, closed)
C
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTERRA CONSTRUCT CORP10/08/2025
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC05/08/2025
DOB NOWGeneral ConstructionSigned-offTERRA CONSTRUCT CORP02/27/2025
DOB NOWGeneral ConstructionSigned-offTERRA CONSTRUCT CORP09/13/2024
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC05/28/2024
DOB NOWGeneral ConstructionSigned-offSANVITO REALTY HOLDING CORP02/02/2024
DOB NOWGeneral ConstructionSigned-offSANVITO REALTY HOLDING CORP12/08/2023
DOB NOWPlumbingSigned-offKAY PLUMBING INC12/05/2023
DOB NOWSidewalk ShedSigned-offZKW ENTERPRISES INC07/14/2023
BISPLISSUEDTOP DOG PLBG & HTG CORP03/19/2013
BISMHISSUEDHONG KONG STYLE CONSTRUCT03/13/2013
BISOTISSUEDHONG KONG STYLE CONSTRUCT03/12/2013
BISPLISSUEDLUVER PLBG & HTG INC03/25/2005
BISEQISSUEDCKC PLANN DESING CORP03/11/2005
BISMHISSUEDCKC PLANN DESING CORP03/11/2005
BISFPISSUEDNY BUSIN FIRE SYTEM03/02/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC12/03/1998
BISFPISSUEDMASTER FIRE PREVENTION SYSTEM IN01/15/1992
BISMHISSUED346 WEST 53 ST CORP03/05/1991
BISSDISSUED345 W 53 ST CORP07/24/1990
1 project · most recent 10/10/2025
Heating and Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/10/2025Signed-offTERRA CONSTRUCT CORPHeating and Air Conditioning Systems, Heating Systems
Heat / Cool
Fujitsu MODEL FUJITSU AOU18RLXFZH 18,000 BTU · Heat Pump Outdoor ×13
Heating
Fujitsu MODEL FUJITSU AOU18RLXFZH 22,000 BTU · Heat Pump Outdoor ×13
3 projects · most recent 03/07/2025
General Wiring
FiledStatusContractorScope
03/07/2025Permit IssuedNEW CENTURY ELEC'L CONTRGeneral Wiring
09/01/2023CompleteTITAN ELEC'L & ELEV CONTR—
06/08/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/12/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
01/12/2026HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
01/12/2026Maintenance informationSteven Bendoraitisenergy_progress
01/12/2026HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
01/12/2026Tenant Protection Plan Compliance—special
01/12/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/12/2026Energy Code Compliance InspectionsSteven Bendoraitisprogress
01/12/2026HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
11/06/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
11/06/2025Tenant Protection Plan Compliance—special
11/06/2025Energy Code Compliance InspectionsSteven Bendoraitisprogress
11/06/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
11/06/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
11/06/2025Maintenance informationSteven Bendoraitisenergy_progress
11/06/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/29/2024Final—progress
08/29/2024Tenant Protection Plan Compliance—special
08/29/2024Mechanical Systems—special
02/06/2024Maintenance informationSteven Bendoraitisenergy_progress
02/06/2024Tenant Protection Plan Compliance—special
02/06/2024Energy Code Compliance InspectionsSteven Bendoraitisprogress
02/06/2024HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
02/06/2024HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
02/06/2024HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
02/06/2024Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
07/26/2023HVAC-R and service water heating system controlsMIRCEA BAZACenergy_progress
Latest 25 of 29.
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026M00875485-I1Request digital key ↗
08/27/2026M00956881-P4Request digital key ↗
08/27/2026M00956881-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION3
03/20/2013121115239Open ↗
03/15/2013121115239Open ↗
03/14/2013121115239Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/06/2013121115239Open ↗
03/26/2013121115239Open ↗
▸DOB NOWHPD Certification Letter or CPC Special Permit1
08/13/2026M00906741-S1Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00906741-I1Open ↗
▸Seals & Professional Certifications33
▸DOB NOWProgress Inspector Seal & Signature18
09/01/2026M00956881-P4Open ↗
09/01/2026M00956881-P4Open ↗
09/01/2026M00956881-P4Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/31/2026M00875485-I1Open ↗
08/27/2026M00956881-P1Open ↗
08/27/2026M00956881-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00956881-P4Open ↗
08/30/2026M00956881-P1Open ↗
08/24/2026M00956881-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/13/2013121115239Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING2
06/06/2013121115239Open ↗
03/26/2013121115239Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
11/21/2013121115239Open ↗
06/12/2013121115239Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT2
12/22/2014121115239Open ↗
11/13/2013121115239Open ↗
▸BISEQUIPMENT USE PERMITS1
12/22/2014121115239Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist9
08/13/2026M00906741-I1Open ↗
08/13/2026M00906741-S1Open ↗
08/13/2026M00956881-P4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWCertificate of No Harassment1
08/13/2026M00906741-S1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/13/2013121115239Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/13/2013121115239Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/13/2013121115239Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
11/13/2013121115239Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
06/19/2013121115239Open ↗
04/03/2013121115239Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026M00906741-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00906741-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00906741-I1Open ↗