← Back
STATEN ISLAND
3462 RICHMOND ROAD
STATEN ISLAND · BIN 5175162
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Floor 23p · 1 filing · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar1p · 1 filing · 7 docs
Basement4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WILLY C. YUIN ARCH. PLLC210/31/2025
TONY SAYAD ARCHITECT604/17/2025
ETRECTE LLC111/22/2024
C&P DESIGN CONSULTANTS205/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NIRO INCGeneral Contractor903/21/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor303/21/2026
VIK MANAGEMENT CONSTRUCTIGeneral Contractor303/21/2026
FLOW-RIGHT PLBG & HTG CORPlumbing207/08/2026
BRIDLE ESTATES INCGeneral Contractor107/08/2026
FLOW-RIGHT FIRE SUPP CORPFire Protection107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C&P DESIGN CONSULTANT8472604/17/2025
SRA PLANNING & EXPEDITING5677201/30/2025
ETRECTE LLC8116111/22/2024
Building Lifecycle
All (77)Filed (11)Permit Issued (10)Signed Off (8)Violation (1)Inspection (15)Objection (2)Special Inspection (30)
04/30/2026
Violation issued (ECB, open)
Unknown
02/25/2026
Signed off — Alteration
PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AT BASEMENT. PROPOSED WORK IS FILED IN CONJUNCTION WITH ALTERATION APPLICATION DOB #S01306398-I1
S01306398-I1
02/19/2026
Signed off — Alteration
PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AT BASEMENT. PROPOSED WORK IS FILED IN CONJUNCTION WITH ALTERATION APPLICATION DOB #S01306398-I1
S01306398-S1
01/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2025
Permit issued — Plumbing
S01306398-S1-PL
11/14/2025
Permit issued — General Construction
S01306398-I1-GC
10/31/2025
Filed — Alteration
PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AT BASEMENT. PROPOSED WORK IS FILED IN CONJUNCTION WITH ALTERATION APPLICATION DOB #S01306398-I1
S01306398-I1
10/31/2025
Filed — Alteration
PROPOSED INSTALLATION OF NEW PLUMBING FIXTURES AT BASEMENT. PROPOSED WORK IS FILED IN CONJUNCTION WITH ALTERATION APPLICATION DOB #S01306398-I1
S01306398-S1
10/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Willy Yuin
10/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Willy Yuin
10/21/2025
Special inspection requirement — Final
Willy Yuin
04/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
04/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Air barrier - visual inspection
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Footing and Foundation
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Deep Foundation Elements
WILLIAM MONTAGUE
04/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Structural Wood Frame
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Fenestration areas
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Insulation placement and R values
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Air barrier — testing
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Final
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Combustible Exterior Wall Coverings
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM MONTAGUE
04/21/2025
Special inspection requirement — Concrete - Cast-In-Place
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Subgrade Inspections
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Stanislav Pilipenko
04/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Fireplaces
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Maintenance information
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Electric vehicle service equipment requirements
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Fenestration air leakage
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Interior lighting power
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
04/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
04/17/2025
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-P2
03/25/2025
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-S3
03/24/2025
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-S4
03/18/2025
Signed off — Alteration
S01145929-I1
03/10/2025
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-S5
03/03/2025
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-S1
03/03/2025
Signed off — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-S2
02/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/03/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2025
Filed — New Building
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITH NB APPLICATION FILED UNDER INITIAL FILING
S00976206-P1
01/27/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2024
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
12/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/29/2024
Permit issued — Solar
S01145929-I1-SL
11/22/2024
Filed — Alteration
S01145929-I1
11/12/2024
Permit issued — Curb Cut
S00976206-S2-CC
11/12/2024
Permit issued — Mechanical Systems
S00976206-S5-MS
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC12/11/2025
DOB NOWGeneral ConstructionSigned-offVIK MANAGEMENT CONSTRUCTI11/14/2025
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP11/29/2024
DOB NOWCurb CutSigned-offNIRO INC11/12/2024
DOB NOWMechanical SystemsSigned-offNIRO INC11/12/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT FIRE SUPP CORP06/18/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR06/17/2024
DOB NOWPlumbingSigned-offFLOW-RIGHT PLBG & HTG COR05/09/2024
DOB NOWEarth WorkPermit IssuedNIRO INC05/08/2024
DOB NOWConstruction FenceSigned-offBRIDLE ESTATES INC05/08/2024
1 project · most recent 04/17/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2025Signed-offNIRO INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Luxaire AHU: JHETC36DBCS2N1A CU: TCD2B36S21SA 36,000 BTU · Split System ×2
AHU: JHETC42FBCS2N1A CU: TCD2B42S21SA 42,000 BTU · Split System ×2
Heating
Navien INSTINCT COMBI 199 199,900 BTU · Boiler ×1
Ventilation
Panasonic FV-10VE2 170 CFM · Erv ×1
1 project · most recent 04/17/2025
Sprinkler System
FiledStatusContractorScope
04/17/2025Signed-offFLOW-RIGHT FIRE SUPP CORPSprinkler System
1 project · most recent 04/17/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/17/2025Signed-offFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
3 projects · most recent 06/02/2026
General Wiring
FiledStatusContractorScope
06/02/2026Permit IssuedLENS ELECTRIC, INCGeneral Wiring
11/19/2024CompleteJSP ELECTL CNTNG CORP—
09/09/2024CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 04/17/2025
Wood
FiledStatusContractorScope
04/17/2025Signed-offNIRO INCWood
1 project · most recent 04/17/2025
Fence
FiledStatusContractorScope
04/17/2025Signed-offNIRO INCFence
1 project · most recent 04/17/2025
Earthwork
FiledStatusContractorScope
04/17/2025Signed-offNIRO INCEarthwork
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
01/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
12/16/2024Fail-Final SP - Up to 3 Requested FloorsFailView ↗
12/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2024Pass-Final PL - UndergroundPassView ↗
05/15/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
10/30/2025HVAC-R and service water piping design and insulationWilly Yuinenergy_progress
10/22/2025Energy Code Compliance InspectionsWilly Yuinprogress
10/21/2025FinalWilly Yuinprogress
04/21/2025Insulation placement and R valuesStanislav Pilipenkoenergy_progress
04/21/2025Electric vehicle service equipment requirementsStanislav Pilipenkoenergy_progress
04/21/2025Maintenance informationStanislav Pilipenkoenergy_progress
04/21/2025Fenestration areasStanislav Pilipenkoenergy_progress
04/21/2025FireplacesStanislav Pilipenkoenergy_progress
04/21/2025HVAC-R and service water heating equipmentStanislav Pilipenkoenergy_progress
04/21/2025Energy Code Compliance InspectionsStanislav Pilipenkoprogress
04/21/2025Footing and FoundationStanislav Pilipenkoprogress
04/21/2025Structural Wood FrameStanislav Pilipenkoprogress
04/21/2025Concrete - Cast-In-PlaceStanislav Pilipenkospecial
04/21/2025Fire-Resistance Rated ConstructionStanislav Pilipenkoprogress
04/21/2025Ventilation and air distribution systemStanislav Pilipenkoenergy_progress
04/21/2025Fenestration and door U-factor and product ratingsStanislav Pilipenkoenergy_progress
04/21/2025HVAC-R and service water piping design and insulationStanislav Pilipenkoenergy_progress
04/21/2025Air barrier - visual inspectionStanislav Pilipenkoenergy_progress
04/21/2025FinalStanislav Pilipenkoprogress
04/21/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationStanislav Pilipenkospecial
04/21/2025Subgrade InspectionsStanislav Pilipenkospecial
04/21/2025Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
04/21/2025Combustible Exterior Wall CoveringsStanislav Pilipenkospecial
04/21/2025Deep Foundation ElementsWILLIAM MONTAGUEspecial
04/21/2025Wood – Prefabricated I-JoistsStanislav Pilipenkospecial
Latest 25 of 92.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026S00976206-P2Request digital key ↗
08/21/2026S00976206-P1Request digital key ↗
08/21/2026S00976206-S5Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00976206-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026S01306398-S1Open ↗
09/01/2026S01306398-S1Open ↗
09/01/2026S00976206-S5Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026S00976206-S5Open ↗
09/01/2026S00976206-S4Open ↗
08/28/2026S00976206-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026S00976206-S3Open ↗
08/21/2026S00976206-I1Open ↗
08/20/2026S01145929-I1Open ↗
Showing 3 of 11 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00976206-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00976206-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00976206-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026S00976206-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00976206-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01145929-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S00976206-I1Open ↗
08/13/2026S00976206-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00976206-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S00976206-I1Open ↗