← Back
Church, synagogue, chapel
347 74TH STREET
BROOKLYN · Bay Ridge · BIN 3339304
💬 Discuss this project
1931Year Built
1Stories
M1Building Class
R5BZoning
141,389 sfGross Floor Area
5Units
12 Open Violations 7 unresolved · 5 paperwork only ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: THE ROMAN CATHOLIC CHURCH OF OUR LADY OF THE · 45,287 sf lot · 3.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof7p · 2 filings · 20 docs
Floor 35p · 1 filing · 20 docs
Floor 24p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar1p · 1 filing · 5 docs
Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKLYN ASSET3707/08/2026
RELIABLE ENTERPRISES1103/22/2026
ASHNY INTERNATIONAL INC.103/22/2026
ROMAN CATHOLIC CHURCH203/22/2026
REUABLE ENTERPRISES INC103/22/2026
HUMAN SERVICES OF NY103/22/2026
NYCSCA103/22/2026
OUR LADY OF ANGELS CHURCH103/22/2026
HEARTSHARE HUMAN SERVICES103/21/2026
R C CHURCH OF OUR LADY OF A803/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH BOTTA, PE, PC302/19/2023
STV INCORPORATED708/19/2022
ENTHINK ENGINEERS LLC306/27/2022
SIRI + MARSIK ARCH. P.C.205/12/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHETYPE CONSULTANTS403/21/2026
STV1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABOVE & BEYOND P & H CORPPlumbing707/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor603/21/2026
ASHNU INTERNATIONAL INCGeneral Contractor403/21/2026
RAIN GUARD CONSTRUCTION CGeneral Contractor303/21/2026
TUXEDO ELEC'L CONTR'G INCElectrical103/22/2026
ASANKOMAH, KOFIElectrical103/21/2026
EAGLE 1 MECHANICAL, INCPlumbing107/08/2026
JOHN DICAPUAElectrical103/21/2026
SPIELER, RONALDElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH BOTTA, PE, PC1139302/19/2023
FUTURE TECH CONSULTANTS O589708/19/2022
Building Lifecycle
All (126)Filed (15)Permit Issued (9)Signed Off (3)Violation (60)Inspection (9)Special Inspection (30)
05/11/2026
Violation issued (ECB, open)
Construction
03/13/2026
Violation issued (FDNY_ORDER, closed)
08/07/2025
Violation issued (FDNY_ORDER, closed)
08/07/2025
Violation issued (FDNY_ORDER, closed)
12/03/2024
Violation issued (FDNY_NOV, closed)
08/19/2024
Violation issued (ECB, closed)
Elevators
08/19/2024
Violation issued (ECB, closed)
Elevators
05/24/2024
Signed off — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-I1
05/24/2024
Signed off — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-S1
08/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2023
Signed off — Alteration
Facade and roof restoration as indicated on drawings.
B00704478-I1
08/04/2023
Permit issued — Plumbing
B00781894-I1-PL
08/04/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
02/19/2023
Filed — Alteration
Removal of existing gas piping and domestic hot water heater in cellar. No change in use, occupancy or egress.
B00750225-P1
08/25/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH BOTTA
08/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Marchese
08/22/2022
Special inspection requirement — Lighting controls
Michael Marchese
08/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Michael Marchese
08/22/2022
Special inspection requirement — Electrical motors and elevators
Michael Marchese
08/22/2022
Special inspection requirement — Post-installed Anchors
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - Details
Michael Marchese
08/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - Welding
Michael Marchese
08/22/2022
Special inspection requirement — Shutoff dampers
Michael Marchese
08/22/2022
Special inspection requirement — Masonry
Michael Marchese
08/22/2022
Special inspection requirement — Concrete - Cast-In-Place
Michael Marchese
08/22/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Michael Marchese
08/22/2022
Special inspection requirement — Mechanical Systems
Michael Marchese
08/22/2022
Special inspection requirement — Maintenance information
Michael Marchese
08/22/2022
Special inspection requirement — Sprayed fire-resistant materials
Michael Marchese
08/22/2022
Special inspection requirement — Final
Michael Marchese
08/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
08/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Marchese
08/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/22/2022
Special inspection requirement — Interior lighting power
Michael Marchese
08/22/2022
Special inspection requirement — Exterior lighting power
Michael Marchese
08/19/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P5
08/18/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/18/2022
Special inspection requirement — Maintenance information
Michael Marchese
08/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Marchese
08/18/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Marchese
08/16/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P3
08/16/2022
Filed — Alteration
K404_Proposed work to include renovation of the building from BAS, 1ST FL, 2ND FL, 3RD FL spaces of the existing building, leased to NYCDOE for a new 3K Center/School. No change in use or occupancy under this application.
B00584296-P4
08/15/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Marchese
08/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
08/03/2022
Permit issued — Plumbing
B00781894-I1-PL
07/31/2022
Filed — Alteration
Installation of new Electric Domestic Hot Water Heater. No change in use, occupancy or egress
B00781894-I1
06/27/2022
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00681498-P1
06/09/2022
Permit issued — Plumbing
B00750225-I1-PL
06/03/2022
Filed — Alteration
Removal of existing gas piping and domestic hot water heater in cellar. No change in use, occupancy or egress.
B00750225-I1
05/17/2022
Permit issued — General Construction
B00704478-I1-GC
05/12/2022
Filed — Alteration
Facade and roof restoration as indicated on drawings.
B00704478-P1
04/15/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offABOVE & BEYOND P & H CORP08/04/2023
DOB NOWPlumbingSigned-offABOVE & BEYOND P & H CORP08/03/2022
DOB NOWPlumbingSigned-offABOVE & BEYOND P & H CORP06/09/2022
DOB NOWGeneral ConstructionSigned-offRAIN GUARD CONSTRUCTION C05/17/2022
DOB NOWStructuralSigned-offERNEST KURIQI03/11/2022
DOB NOWSupported ScaffoldPermit IssuedRELIABLE ENTERPRISES INC02/22/2022
DOB NOWSidewalk ShedPermit IssuedRELIABLE ENTERPRISES INC02/17/2022
DOB NOWGeneral ConstructionSigned-offERNEST KURIQI02/09/2022
DOB NOWPlumbingSigned-offEAGLE 1 MECHANICAL, INC02/07/2022
BISBLISSUEDABOVE & BEYOND P & H CORP06/20/2019
BISOTISSUEDGUARANTEED HOME IMPROVEME08/15/2018
BISPLISSUEDABOVE & BEYOND P & H CORP08/15/2018
BISBLISSUEDGEORGE BASSOLINO INC.07/16/2002
BISOTISSUEDNATIVO GENERAL CONTRACTING04/02/2001
BISPLISSUEDMAINLAND PLBG & HTG INC01/17/2001
BISOTISSUEDNATIVO GENERAL CONTRACTING01/02/2001
BISOTISSUEDNATIVO GENERAL CONTRACTING12/27/2000
BISFBISSUEDGEORGE BASSOLINO INC08/07/2000
BISOTISSUEDNATIVO GENERAL CONTRACTING07/21/2000
2 projects · most recent 02/19/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/19/2023Signed-offABOVE & BEYOND P & H CORPGas
07/31/2022Signed-offABOVE & BEYOND P & H CORPWater/Sanitary
5 projects · most recent 05/27/2026
General Wiring
FiledStatusContractorScope
05/27/2026Permit IssuedA & S ELECTRIC INC.General Wiring
09/19/2025Permit IssuedCAPUTEK ELEC'L SERVICES,—
02/22/2022CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
02/18/2022Permit IssuedRICHARD NEU—
10/07/2019Permit IssuedTUXEDO ELEC'L CONTR'G INC—
2 projects · most recent 06/27/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/27/2022Permit IssuedRELIABLE ENTERPRISES INCSidewalk Shed
02/21/2022Permit IssuedRELIABLE ENTERPRISES INCScaffold
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 63
DateRequirementInspectorRole
02/21/2023Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
08/25/2022Fire-Resistant Penetrations and JointsJOSEPH BOTTAspecial
08/22/2022Structural Steel - WeldingMichael Marchesespecial
08/22/2022Structural Stability – Alterations of existing buildingsMichael Marchesespecial
08/22/2022MasonryMichael Marchesespecial
08/22/2022Concrete - Cast-In-PlaceMichael Marchesespecial
08/22/2022Structural Steel - High Strength BoltingMichael Marchesespecial
08/22/2022Mechanical SystemsMichael Marchesespecial
08/22/2022Structural Steel - DetailsMichael Marchesespecial
08/22/2022Sprayed fire-resistant materialsMichael Marchesespecial
08/22/2022FinalMichael Marcheseprogress
08/22/2022Energy Code Compliance InspectionsMichael Marcheseprogress
08/22/2022Fire-Resistance Rated ConstructionMichael Marcheseprogress
08/22/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
08/22/2022Interior lighting powerMichael Marcheseenergy_progress
08/22/2022Shutoff dampersMichael Marcheseenergy_progress
08/22/2022HVAC-R and service water heating system controlsMichael Marcheseenergy_progress
08/22/2022Electrical motors and elevatorsMichael Marcheseenergy_progress
08/22/2022Exterior lighting powerMichael Marcheseenergy_progress
08/22/2022Post-installed AnchorsMichael Marchesespecial
08/22/2022Fire-Resistant Penetrations and JointsMichael Marchesespecial
08/22/2022Lighting controlsMichael Marcheseenergy_progress
08/22/2022Maintenance informationMichael Marcheseenergy_progress
08/18/2022HVAC-R and service water heating equipmentMichael Marcheseenergy_progress
08/18/2022HVAC-R and service water piping design and insulationMichael Marcheseenergy_progress
Latest 25 of 63.
▾Documents — 140 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
09/01/2026B00584296-I1Request digital key ↗
09/01/2026B00584296-S1Request digital key ↗
09/01/2026B00584296-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits4
▸BISWORK PERMIT APPLICATION3
08/13/2018340618754Open ↗
08/13/2018340618754Open ↗
08/13/2018340618754Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/13/2018340618754Open ↗
▸Seals & Professional Certifications81
▸DOB NOWProgress Inspector Seal & Signature37
09/16/2026B00584296-S1Open ↗
09/16/2026B00584296-S1Open ↗
09/16/2026B00584296-S1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/16/2026B00584296-S1Open ↗
09/01/2026B00584296-P2Open ↗
09/01/2026B00781894-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
09/01/2026B00584296-P1Open ↗
Showing 3 of 15 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/13/2018340618754Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/24/2019340618754Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
08/13/2018340618754Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
08/13/2018340618754Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
08/30/2026B00704478-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/29/2026B00750225-I1Open ↗
08/29/2026B00750225-P1Open ↗
08/13/2026B00781894-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/13/2018340618754Open ↗
▸Energy Compliance7
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/13/2018340618754Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/24/2019340618754Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/13/2018340618754Open ↗
▸BISNYCECC ANALYSIS1
08/13/2018340618754Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/24/2019340618754Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/13/2018340618754Open ↗
▸Approvals, Objections & Sign-offs19
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
09/01/2026B00584296-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDEP Variance (V5) letter3
09/01/2026B00584296-I1Open ↗
09/01/2026B00584296-S1Open ↗
08/30/2026B00704478-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/24/2019340618754Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/24/2019340618754Open ↗
08/13/2018340618754Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/24/2019340618754Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/13/2018340618754Open ↗