Health center, child center, clinic
2075 MCDONALD AVENUE
BROOKLYN · BIN 3178530
💬 Discuss this project
1931Year Built
2Stories
I5Building Class
M1-1Zoning
15,088 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Health center, child center, clinic · Owner of record: NEW YORK CANCER CENTER, INC. · 5,275 sf lot · 2.86 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 17 docs
Bulkhead2p · 2 filings · 20 docs
Floor 2Under Construction14p · 3 filings · 20 docs
Floor 1Under Construction18p · 4 filings · 20 docs
CellarUnder Construction16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ABECO CONSTRUCTION303/22/2026
2075 MC DONALD REALTY ASS203/22/2026
2075 MCDONALD AVE REALTY103/22/2026
OWNER OF 2075 MCDONALD AV103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/13/2021$2.7M—— → —$181/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING STUDIO ARCHITECTS806/02/2026
ENGINEERING SOLUTIONS302/04/2026
KL INNOVATIVE DESIGN INC111/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP2003/21/2026
BASIC GROUPS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABECO CONSTRUCTION LLCGeneral Contractor3607/08/2026
P.H. WORKS INCPlumbing407/08/2026
SAFETY FIRE SPRINKLER CORPlumbing303/22/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MJ ENGINEERING & DESIGN55461006/02/2026
KL INNOVATIVE DESIGN INC7225111/18/2019
Building Lifecycle
All (105)Filed (12)Permit Issued (29)Signed Off (7)Violation (11)Inspection (10)Objection (6)Special Inspection (30)
06/16/2026
Special inspection requirement — Post-installed Anchors
Magdy Youssef
06/16/2026
Special inspection requirement — Air barrier — testing
Magdy Youssef
06/16/2026
Special inspection requirement — Vestibules
Magdy Youssef
06/16/2026
Special inspection requirement — Protection of exposed foundation insulation
Magdy Youssef
06/16/2026
Special inspection requirement — Fenestration areas
Magdy Youssef
06/16/2026
Special inspection requirement — Exterior lighting power
Magdy Youssef
06/16/2026
Special inspection requirement — Maintenance information
Magdy Youssef
06/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Magdy Youssef
06/16/2026
Special inspection requirement — Air barrier - visual inspection
Magdy Youssef
06/16/2026
Special inspection requirement — Masonry
Magdy Youssef
06/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Magdy Youssef
06/16/2026
Special inspection requirement — Fenestration air leakage
Magdy Youssef
06/16/2026
Special inspection requirement — Insulation placement and R values
Magdy Youssef
06/16/2026
Special inspection requirement — Sprayed fire-resistant materials
Magdy Youssef
06/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Magdy Youssef
06/16/2026
Special inspection requirement — Lighting controls
Magdy Youssef
06/16/2026
Special inspection requirement — Electrical motors and elevators
Magdy Youssef
06/16/2026
Special inspection requirement — Interior lighting power
Magdy Youssef
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Magdy Youssef
06/02/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
B00485238-A2
06/02/2026
Special inspection requirement — Fenestration air leakage
Magdy Youssef
06/02/2026
Special inspection requirement — Maintenance information
Magdy Youssef
06/02/2026
Special inspection requirement — Vestibules
Magdy Youssef
06/02/2026
Special inspection requirement — Lighting controls
Magdy Youssef
06/02/2026
Special inspection requirement — Air barrier - visual inspection
Magdy Youssef
06/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Magdy Youssef
06/02/2026
Special inspection requirement — Protection of exposed foundation insulation
Magdy Youssef
06/02/2026
Special inspection requirement — Electrical motors and elevators
Magdy Youssef
06/02/2026
Special inspection requirement — Post-installed Anchors
Magdy Youssef
06/02/2026
Special inspection requirement — Air barrier — testing
Magdy Youssef
06/02/2026
Special inspection requirement — Sprayed fire-resistant materials
Magdy Youssef
05/20/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
04/23/2026
Signed off — Alteration
MECHANICAL WORK
B00533829-I1
04/22/2026
Signed off — Alteration
PLUMBING AND SPRINKLER APPLICATION IN CONJUNCTION WITH architecture APPLICATION
B00533763-I1
03/19/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/23/2026
Objection raised — Other
02/23/2026
Objection resolved — Addressed
02/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2026
Filed — Alteration
PLUMBING AND SPRINKLER APPLICATION IN CONJUNCTION WITH architecture APPLICATION
B00533763-P1
01/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
B00485238-P3
11/21/2025
Permit issued — General Construction
B00485238-I1-GC
10/03/2025
Permit issued — General Construction
B00485238-I1-GC
08/28/2025
Permit issued — General Construction
B00485238-I1-GC
06/11/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/09/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/30/2025
Permit issued — General Construction
B00485238-I1-GC
05/27/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00485238-S1
05/13/2025
Permit issued — Sprinklers
B00533763-I1-EW-SP
05/05/2025
Permit issued — Sprinklers
B00533763-I1-PL
05/01/2025
Signed off — Alteration
Temporary Constuction Fence
B00491179-I1
04/09/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00485238-S3
04/02/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00485238-S2
02/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/21/2025
Permit issued — General Construction
B00485238-I1-GC
12/09/2024
Permit issued — Construction Fence
B00491179-I1-FN
12/06/2024
Permit issued — Mechanical Systems
B00533829-I1-MS
08/01/2024
Permit issued — General Construction
B00485238-I1-GC
05/16/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC11/21/2025
DOB NOWGeneral ConstructionPermit IssuedSOLAR ONE INC10/03/2025
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC08/28/2025
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC05/30/2025
DOB NOWSprinklersSigned-offSAFETY FIRE SPRINKLER CORP05/13/2025
DOB NOWSprinklersSigned-offP.H. WORKS INC05/05/2025
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC01/21/2025
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC12/09/2024
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC12/06/2024
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC08/01/2024
DOB NOWPlumbingSigned-offP.H. WORKS INC05/09/2024
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC01/26/2024
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC12/05/2023
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC12/05/2023
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC10/27/2023
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC07/13/2023
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC07/13/2023
DOB NOWPlumbingSigned-offP.H. WORKS INC05/09/2023
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC04/02/2023
DOB NOWMechanical SystemsSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWStructuralSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC12/06/2022
DOB NOWPlumbingSigned-offP.H. WORKS INC05/12/2022
DOB NOWEarth WorkSigned-offABECO CONSTRUCTION LLC03/24/2022
DOB NOWStructuralSigned-offABECO CONSTRUCTION LLC03/24/2022
DOB NOWSupport of ExcavationSigned-offABECO CONSTRUCTION LLC03/16/2022
DOB NOWConstruction FenceSigned-offABECO CONSTRUCTION LLC01/27/2022
DOB NOWGeneral ConstructionPermit IssuedABECO CONSTRUCTION LLC11/04/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC11/19/2019
BISMHISSUEDPIZZAZZ05/20/1992
3 projects · most recent 02/03/2026
General Wiring
FiledStatusContractorScope
02/03/2026CompleteACCURATE ELEC'L CORP.General Wiring
10/03/2022CompleteTUXEDO ELEC'L CONTR'G INC—
12/09/2019CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/20/2026Fail-Final Boiler Equipment InspectionFailView ↗
03/19/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/11/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/09/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/09/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/16/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 82
DateRequirementInspectorRole
06/16/2026MasonryMagdy Youssefspecial
06/16/2026Insulation placement and R valuesMagdy Youssefenergy_progress
06/16/2026Exterior lighting powerMagdy Youssefenergy_progress
06/16/2026Air barrier - visual inspectionMagdy Youssefenergy_progress
06/16/2026Air barrier — testing Magdy Youssefenergy_progress
06/16/2026VestibulesMagdy Youssefenergy_progress
06/16/2026Fenestration and door U-factor and product ratingsMagdy Youssefenergy_progress
06/16/2026Interior lighting powerMagdy Youssefenergy_progress
06/16/2026Electrical motors and elevatorsMagdy Youssefenergy_progress
06/16/2026Maintenance informationMagdy Youssefenergy_progress
06/16/2026Fenestration air leakageMagdy Youssefenergy_progress
06/16/2026Protection of exposed foundation insulationMagdy Youssefenergy_progress
06/16/2026Fenestration areasMagdy Youssefenergy_progress
06/16/2026Lighting controlsMagdy Youssefenergy_progress
06/16/2026Energy Code Compliance InspectionsMagdy Youssefprogress
06/16/2026Fire-Resistance Rated ConstructionMagdy Youssefprogress
06/16/2026Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
06/16/2026Post-installed AnchorsMagdy Youssefspecial
06/16/2026Sprayed fire-resistant materialsMagdy Youssefspecial
06/02/2026Air barrier - visual inspectionMagdy Youssefenergy_progress
06/02/2026MasonryMagdy Youssefspecial
06/02/2026Post-installed AnchorsMagdy Youssefspecial
06/02/2026Sprayed fire-resistant materialsMagdy Youssefspecial
06/02/2026Structural Stability – Alterations of existing buildingsMagdy Youssefspecial
06/02/2026Energy Code Compliance InspectionsMagdy Youssefprogress
Latest 25 of 82.
▾Documents — 186 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch11
08/31/2026B00533829-I1Request digital key ↗
08/31/2026B00533763-I1Request digital key ↗
08/16/2026B00485238-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00263338-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
07/08/2025340822033Open ↗
06/21/2024340822033Open ↗
09/20/2021340822033Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
12/03/2021340822033Open ↗
09/20/2021340822033Open ↗
▸Zoning, Tax Lot & Property Records30
▸DOB NOWRestrictive Declaration/Easement 17
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-S3Open ↗
08/13/2026B00485238-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 37
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-S2Open ↗
08/13/2026B00485238-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 27
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-S2Open ↗
08/13/2026B00485238-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-P1Open ↗
08/13/2026B00485238-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-P3Open ↗
08/13/2026B00485238-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00485238-I1Open ↗
▸Seals & Professional Certifications96
▸DOB NOWProgress Inspector Seal & Signature55
09/23/2026B00485238-I1Open ↗
09/23/2026B00485238-I1Open ↗
09/23/2026B00485238-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/23/2026B00485238-I1Open ↗
09/23/2026B00485238-I1Open ↗
09/23/2026B00485238-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/02/2026B00263338-I1Open ↗
08/31/2026B00533829-I1Open ↗
08/31/2026B00533763-P1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/20/2021340822033Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/20/2021340822033Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-P1Open ↗
08/13/2026B00485238-I1Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/19/2017300171212Open ↗
▸BISEQUIPMENT USE PERMITS1
05/19/2017300171212Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN2
12/03/2021340822033Open ↗
12/03/2021340822033Open ↗
▸BISSTREET TREE CHECKLIST1
12/03/2021340822033Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00485238-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/16/2026B00485238-S2Open ↗
08/16/2026B00485238-S1Open ↗
08/16/2026B00485238-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
09/02/2026B00263338-I1Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/31/2026B00533763-I1Open ↗
08/16/2026B00485238-I1Open ↗
08/13/2026B00533829-I1Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
09/20/2021340822033Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00485238-S2Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B00485238-S2Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00485238-S2Open ↗
▸Approvals, Objections & Sign-offs4
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
12/03/2021340822033Open ↗
09/20/2021340822033Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/16/2026B00485238-A2Open ↗
08/16/2026B00485238-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00485238-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00485238-I1Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/20/2021340822033Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/20/2021340822033Open ↗
▸BISADDITIONAL INFORMATION1
12/03/2021340822033Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-P1Open ↗
08/13/2026B00485238-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/16/2026B00485238-A2Open ↗
08/13/2026B00485238-P3Open ↗
08/13/2026B00485238-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026B00485238-S2Open ↗
08/13/2026B00485238-S1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/20/2021340822033Open ↗
▸DOB NOWFinal Survey1
08/16/2026B00485238-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00485238-I1Open ↗