DOB06/30/2026FAILURE TO COMPLY WITH COMMISSIONER'S ORDER: DOB VIOLATION #032726CFA0 703DD REQUIRED THE IMMEDIATE 100% HANDS ON INSPECTION OF ALL FACADES BY A PE/RA & SUBMIT A REPORT TO FACADE VIA EMAIL BY 04/09/2026. AS OF 06/30/2026, NO HAND ON INSPECTION REPORT SUBMITTED TO FACADE UNIT REMEDY: COMPLY WITH DOB VIOLATION #032726CFA0703DD IMMEDIATELY
DOB03/27/2026EWO DUE TO CRACKED,COMPROMISED GLASS BALUSTRADE PANEL 3FL BALCONY,NE & EXP1E VISIBLE FRACTURE LINES @/AROUND FASTENERS CREATING HAZARD TO PUBLIC. CRACKED/SPALLING COPING STONE WITH LOOSE MATERIAL. REMEDY: IMMEDIATELY TAKE/PROVIDE ADEQ SAFE MEAS TO SECURE/PROT PUBLIC.MAKE IMMED ADEQ REPAIRS TO UNSAFE COND U/FULL SUPV OF NYS LIC. PROFESSIONAL
DOB03/27/2026FTM EXTERIOR FACADE & APPURTENANCES. CRACKED GLASS PANEL @ BALCONY #301 @ FL. EXP1 E. UNDERSIDE OF BALCONY #904 COLLAPSED ON TO BALCONY # 804.REMEDY:OWNER IMMED RETAIN NYS RDP WITH EXPERIENCE IN BALCONY GLASS RAILING & EIFS SYS TO INSPECT & EVALUATE 100% HANDS-ON. FILE UNSAFE FIST REPORT & SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV BY 4/9/2026
DOB03/27/2026PARTIAL VACATE ORDER DUE TO CRACKED GLASS BALUSTRADE PANEL AT BALCONY 3FL APARTMENT #301, EXP#1 EAST, POSING AN IMMEDIATE HAZARD TO PUBLIC SAFETY. DUE TO HAZARDOUS CONDITIONS BALCONY, EXP#1 AT 3FL IS TO BE VACATED ENTIRELY. REMEDY: ENTIRE BALCONY, 3RD FLOOR EAST TO BE VACATED
ECB03/27/2026FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 EAST (1)CRACKED GLASS BALUSTRADE PANEL AT 3RD FLOOR BALCONY NORTHEAST END. (2)CRACKED BALCONY TILES AND$25K due
ECB03/20/2026FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED EXPOSURE 3(BACK) APARTMENT 904 BALCONY BOTTOM COLLAPSED ONTO 804 BALCONY, 805 & 905 BALCONY BOTTOMS ALSO IN DISREPAIR CREATI$5K due
DOB03/20/2026REQUESTING ENGINEERING REPORT. AT TIME OF INSPECTION OBSERVED EXPOSURE 3(BACK) APARTMENT 904 BALCONY BOTTOM COLLAPSED ONTO 804 BALCONY STEEL BEAMS RUSTY, 805 & 905 BALCONY BOTTOMS ALSO IN DISREPAIR, ALL BALCONY'S AT EXPO 1 & 3, STRUCTURAL STABILITY IN QUESTION.
Condo, residential unit in elevator building · 17,325 sf lot · 5.23 FAR built · Flood zone X