← Back
Two family converted from one family
3470 AMBOY ROAD
STATEN ISLAND · Oakwood-Richmondtown · BIN 5064228
💬 Discuss this project
1963Year Built
1Stories
B3Building Class
R3-2Zoning
2,156 sfGross Floor Area
2Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Two family converted from one family · 9,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Basement4p · 1 filing · 20 docs
Sub-Basement8p · 1 filing · 20 docs
Site & exterior6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP1703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASIC GROUPS CORP605/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bealin Groups Corp203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061605/19/2021
Building Lifecycle
All (34)Filed (6)Permit Issued (2)Signed Off (2)Violation (4)Special Inspection (20)
11/26/2025
Violation issued (HPD, closed)
I
07/27/2023
Violation issued (HPD, closed)
B
04/27/2023
Signed off — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-S2
11/21/2022
Violation issued (HPD, closed)
I
08/05/2021
Signed off — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-I1
05/19/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-P4
05/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
05/19/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
05/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
05/19/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
04/22/2021
Permit issued — General Construction
S00485403-S2-GC
04/12/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-P3
04/12/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-P2
04/12/2021
Special inspection requirement — Fenestration areas
YING JIANG
04/12/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
04/12/2021
Special inspection requirement — Insulation placement and R values
YING JIANG
04/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
04/12/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
04/12/2021
Special inspection requirement — Final
YING JIANG
04/12/2021
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
04/12/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
04/12/2021
Special inspection requirement — Air barrier - visual inspection
YING JIANG
04/12/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
YING JIANG
04/12/2021
Special inspection requirement — Lighting in dwelling units
YING JIANG
04/12/2021
Special inspection requirement — Lighting controls
YING JIANG
04/12/2021
Special inspection requirement — Fenestration air leakage
YING JIANG
04/12/2021
Special inspection requirement — Interior lighting power
YING JIANG
03/22/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-S2
03/17/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-P1
03/17/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
03/17/2021
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
03/16/2021
Filed — Alteration
INSTALL NEW BOILER AND HWH AT BASEMENT. RELOCATE EXISTING HWH AND BOILER IN BAS AND GAS METER TO OSP. INSTALL ONE NEW GAS METER AT OSP. PLUMBING WORK AS PER PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
S00485403-I1
03/16/2021
Permit issued — Plumbing
S00485403-I1-PL
01/31/2001
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY04/22/2021
DOB NOWPlumbingSigned-offT & T PLUMBING INC03/16/2021
BISCCISSUEDN/A05/11/2001
1 project · most recent 03/23/2021
FiledStatusContractorScope
03/23/2021CompleteJ Y ELECTRIC INC2 meters, 2 new_meters
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
05/19/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
05/19/2021Energy Code Compliance InspectionsYING JIANGprogress
05/19/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
05/19/2021Energy Code Compliance InspectionsYING JIANGprogress
04/12/2021Fenestration areasYING JIANGenergy_progress
04/12/2021Energy Code Compliance InspectionsYING JIANGprogress
04/12/2021Insulation placement and R valuesYING JIANGenergy_progress
04/12/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
04/12/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
04/12/2021FinalYING JIANGprogress
04/12/2021Fire-Resistance Rated ConstructionYING JIANGprogress
04/12/2021Energy Code Compliance InspectionsYING JIANGprogress
04/12/2021Air barrier - visual inspectionYING JIANGenergy_progress
04/12/2021Fenestration and door U-factor and product ratingsYING JIANGenergy_progress
04/12/2021Lighting in dwelling unitsYING JIANGenergy_progress
04/12/2021Lighting controlsYING JIANGenergy_progress
04/12/2021Fenestration air leakageYING JIANGenergy_progress
04/12/2021Interior lighting powerYING JIANGenergy_progress
03/17/2021Fire-Resistant Penetrations and JointsYING JIANGspecial
03/17/2021Energy Code Compliance InspectionsYING JIANGprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026S00485403-I1Request digital key ↗
08/25/2026S00485403-P4Request digital key ↗
08/25/2026S00485403-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026S00485403-S2Open ↗
08/29/2026S00485403-S2Open ↗
08/29/2026S00485403-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/25/2026S00485403-P3Open ↗
08/25/2026S00485403-P1Open ↗
08/25/2026S00485403-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026S00485403-S2Open ↗
08/28/2026S00485403-P1Open ↗
08/26/2026S00485403-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/25/2026S00485403-P1Open ↗
08/25/2026S00485403-I1Open ↗
08/25/2026S00485403-P4Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00485403-S2Open ↗