Elevator cooperative
3475 GREYSTONE AVENUE
BRONX · Riverdale-Spuyten Duyvil · BIN 2083824
💬 Discuss this project
1957Year Built
6Stories
D4Building Class
R6Zoning
61,187 sfGross Floor Area
57Units
LL97 CoveredRent Stabilized12 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: GREYSTONE VIEWS INC · 16,800 sf lot · 3.64 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAFELINE GROUP407/08/2026
GARTHCHESTER REALTY1007/08/2026
BILLY ENTERPRISES203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MERRITT ENGINEERING CONSULTANT DPC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PHILIP ZUARDIElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
PRINCE CONTRACTING & DEVEGeneral Contractor107/08/2026
SAFELINE GROUP INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519101/29/2024
MERRITT ENGINEERING CONSU460101/29/2024
Building Lifecycle
All (84)Filed (5)Permit Issued (4)Signed Off (4)Facade (FISP) (18)Violation (49)Objection (2)Special Inspection (2)
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Resolved
05/15/2026
Filed — Alteration
Concrete repairs at overhead soffit, columns, and beams at garage interior. No change to use, egress, or occupancy.
X01363334-I1
02/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/23/2026
Special inspection requirement — Final
AHMAD KHANZADA
12/14/2025
Violation issued (HPD, open)
A
12/14/2025
Violation issued (HPD, open)
A
12/14/2025
Violation issued (HPD, open)
A
12/14/2025
Violation issued (HPD, closed)
C
12/14/2025
Violation issued (HPD, open)
A
12/14/2025
Violation issued (HPD, open)
A
06/30/2025
Cycle 10 facade report submitted
06/30/2025
Cycle 10 facade report signed — SAFE
06/25/2025
Cycle 10 facade inspection completed
06/24/2025
Signed off — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00991873-I1
06/05/2025
Violation issued (HPD, closed)
A
11/08/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01026047-I1
10/24/2024
Signed off — Alteration
installation of outrigger for facade repair.
X01027659-I1
10/21/2024
Permit issued — Suspended Scaffold
X01027659-I1-SC
10/10/2024
Signed off — Alteration
INSTALLATION OF SUSPENDED/HANGING SCAFFOLD (OUTRIGGER BEAM, PLATFORM, AND ALL ASSOCIATED COMPONENTS) IN ORDER TO PERFORM FACADE REPAIR WORK. NO CHANGE TO EXISTING USE, EGRESS, AND OCCUPANCY.
X01035537-I1
06/06/2024
Permit issued — General Construction
X00991873-I1-GC
04/16/2024
Permit issued — Suspended Scaffold
X01035537-I1-SC
04/15/2024
Filed — Alteration
INSTALLATION OF SUSPENDED/HANGING SCAFFOLD (OUTRIGGER BEAM, PLATFORM, AND ALL ASSOCIATED COMPONENTS) IN ORDER TO PERFORM FACADE REPAIR WORK. NO CHANGE TO EXISTING USE, EGRESS, AND OCCUPANCY.
X01035537-I1
04/02/2024
Filed — Alteration
installation of outrigger for facade repair.
X01027659-I1
03/28/2024
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X01026047-I1
03/28/2024
Permit issued — Sidewalk Shed
X01026047-I1-SH
01/29/2024
Filed — Alteration
FACADE RESTORATION AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00991873-I1
03/17/2023
Violation issued (HPD, closed)
A
02/27/2023
Cycle 9 facade report signed — SWARMP
10/31/2022
Cycle 9 facade report submitted
10/13/2022
Cycle 9 facade inspection completed
02/22/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/17/2022
Violation issued (HPD, closed)
A
05/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/08/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/10/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/16/2017
Cycle 8 facade report submitted
02/02/2017
Cycle 8 facade report signed — SAFE
01/18/2017
Cycle 8 facade inspection completed
10/28/2016
Violation issued (HPD, closed)
I
05/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/20/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/09/2014
Violation issued (HPD, open)
B
12/09/2014
Violation issued (HPD, open)
B
08/13/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/17/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/29/2011
Cycle 7 facade report submitted
11/21/2011
Cycle 7 facade report signed — SAFE
11/11/2011
Cycle 7 facade inspection completed
04/06/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/11/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/27/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/07/2007
Cycle 6 facade report signed — SAFE
02/06/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/29/2007
Cycle 6 facade report submitted
01/29/2007
Cycle 6 facade report submitted
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offPRINCE CONTNG & DEVLP IN10/21/2024
DOB NOWGeneral ConstructionSigned-offPRINCE CONTRACTING & DEVE06/06/2024
DOB NOWSuspended ScaffoldSigned-offPRINCE CONTNG & DEVLP IN04/16/2024
DOB NOWSidewalk ShedSigned-offSAFELINE GROUP INC03/28/2024
BISPLISSUEDZ.W. PLBG & HTG CORP10/14/2016
BISOTISSUEDZ & K RENOVATION, CORP09/27/2016
BISOTISSUEDYORK RESTORATION CORP04/22/2016
BISEQISSUEDBILLY ENTERPRISES INC03/28/2016
BISFSISSUEDA.L. EASTMOND06/05/2008
BISBLISSUEDC C CONTROLLED COMBUSTION01/25/2007
1 project · most recent 03/28/2024
FiledStatusContractorScope
03/28/2024CompleteRICHARD NEU—
1 project · most recent 05/15/2026
Concrete
FiledStatusContractorScope
05/15/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/23/2026Tenant Protection Plan Compliance—special
02/23/2026FinalAHMAD KHANZADAprogress
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026X00991873-I1Request digital key ↗
08/21/2026X01026047-I1Request digital key ↗
08/21/2026X01027659-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION8
01/17/2017220450722Open ↗
09/27/2016220552426Open ↗
03/25/2016240136269Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION6
10/17/2016220552426Open ↗
09/27/2016220552426Open ↗
04/22/2016220450722Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
04/24/2018220552426Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
04/24/2018220552426Open ↗
03/13/2017220450722Open ↗
03/13/2017220450722Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/21/2026X00991873-I1Open ↗
08/16/2026X01363334-I1Open ↗
08/13/2026X01026047-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/27/2016220552426Open ↗
03/25/2016240136269Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/25/2016240136269Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/25/2016240136269Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/27/2016220552426Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
05/20/2008210049017Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/27/2016220552426Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
09/27/2016220552426Open ↗
03/25/2016240136269Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/27/2016220552426Open ↗
09/14/2015220450722Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
05/20/2008210049017Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026X00991873-I1Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/13/2017220450722Open ↗
09/27/2016220552426Open ↗
10/07/2015220450722Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/24/2018220552426Open ↗
03/13/2017220450722Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/25/2016240136269Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
04/24/2018220552426Open ↗
03/21/2017220450722Open ↗
03/13/2017220450722Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
12/04/2012220241655Open ↗
05/13/2008210049017Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
04/24/2018220552426Open ↗
03/13/2017220450722Open ↗
09/27/2016220552426Open ↗
Showing 3 of 8 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
09/27/2016220552426Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
09/27/2016220552426Open ↗
09/14/2015220450722Open ↗
12/04/2012220241655Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/25/2016240136269Open ↗
▸BISADDITIONAL INFORMATION1
01/23/2017220450722Open ↗
▸BISBOROUGH INTAKE FORM1
04/24/2018220552426Open ↗
▸Other Documents4
▸DOB NOWManufacturer's Specifications2
08/13/2026X01027659-I1Open ↗
08/13/2026X01035537-I1Open ↗
▸DOB NOWCalculations2
08/13/2026X01035537-I1Open ↗
08/13/2026X01027659-I1Open ↗