← Back
Office with commercial, 7-19 stories
348 LEXINGTON AVENUE
MANHATTAN · BIN 1019491
💬 Discuss this project
1923Year Built
11Stories
O6Building Class
C5-3Zoning
47,414 sfGross Floor Area
4Units
LL97 Covered16 Open Violations 13 unresolved · 3 paperwork only ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 124 EAST 40TH STREET, · 5,036 sf lot · 9.42 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 4 filings · 20 docs
Penthouse5p · 3 filings · 9 docs
Floor 122p · 1 filing · 3 docs
Floor 11Under Construction6p · 2 filings · 20 docs
Floor 10Under Construction6p · 1 filing · 18 docs
Floor 9Under Construction5p · 1 filing · 18 docs
Floor 8Under Construction19p · 5 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 15p · 3 filings · 20 docs
Cellar5p · 3 filings · 9 docs
Basement1p · 1 filing · 3 docs
4 jobs · most recent 07/01/2026
Heating and Air Conditioning Systems Ventilation Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/01/2026Permit IssuedALL CITY REMODELING, INCHeating and Air Conditioning Systems
Heat / Cool
Daikin DFVE60DP0300A 60,000 BTU · Fan Coil Indoor ×12
DH6VSA60101A 54,500 BTU · Condensing Unit ×12
05/05/2026——Ventilation Systems
Ventilation
Captiveaire DU360HFA 9,600 CFM · Exhaust Fan ×1
01/13/2026Permit IssuedALL CITY REMODELING, INCHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SEZ-AD18NL 18,000 BTU · Fan Coil Indoor ×1
SUZ-AA18NL 18,000 BTU · Condensing Unit ×1
12/02/2025——Air Conditioning Systems
Cooling
Lg ARUM121BTE5 119,700 BTU · Vrf Outdoor ×2
KUSXB121A 12,000 BTU · Condensing Unit ×1
2 jobs · most recent 06/26/2026
Water/Sanitary
FiledStatusContractorScope
06/26/2026Signed-offABR PLBG&HTG CONTR INCWater/Sanitary
09/24/2019——Water/Sanitary
5 jobs · most recent 08/14/2026
General Wiring
FiledStatusContractorScope
08/14/2026Permit IssuedMAXIMUM ELECTRIC CORP.4 meters, 2 new_meters
10/27/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
09/29/2022CompleteNASH ELECTRIC SERVICES IN—
12/15/2021CompleteSMART ELECTRIC SERVICES—
10/21/2019Permit IssuedMLS ELECTRIC LLCGeneral Wiring
1 job · most recent 06/20/2025
Steel Concrete
FiledStatusContractorScope
06/20/2025Permit IssuedALL CITY REMODELING, INCSteel, Concrete
1 job · most recent 01/14/2020
Fence
FiledStatusContractorScope
01/14/2020Permit IssuedALL CITY REMODELING, INCFence
2 jobs · most recent 05/27/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/27/2026Permit IssuedM & L SIGNS, INCSuspended Scaffold (SC)
10/10/2024Permit Issued—Suspended Scaffold (SC)
Building Lifecycle
All (198)Filed (30)Permit Issued (21)Signed Off (7)Facade (FISP) (14)Violation (60)Inspection (8)Objection (28)Special Inspection (30)
08/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/15/2026
Objection resolved — Addressed
07/08/2026
Objection resolved — Resolved
07/08/2026
Objection resolved — Resolved
07/08/2026
Objection resolved — Resolved
07/08/2026
Objection resolved — Resolved
07/08/2026
Objection resolved — Resolved
07/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Balser Richard
07/02/2026
Special inspection requirement — Mechanical Systems
Balser Richard
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Balser Richard
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Balser Richard
07/02/2026
Special inspection requirement — Final
Balser Richard
07/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Balser Richard
07/01/2026
Filed — Alteration
mechanical work to 8th Floor as per plans filed herewith. no change to use, egress or occupancy.
M01344086-P2
06/30/2026
Signed off — Alteration
GENERAL CONSTRUCTION WORK TO 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01228978-S1
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/29/2026
Objection raised — Other
06/26/2026
Filed — Alteration
GENERAL CONSTRUCTION WORK TO 8TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01228978-P3
06/26/2026
Special inspection requirement — Lighting controls
Altagracia Martinez
06/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
Altagracia Martinez
06/26/2026
Special inspection requirement — Final
Altagracia Martinez
06/26/2026
Special inspection requirement — Interior lighting power
Altagracia Martinez
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Altagracia Martinez
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Max Lee
06/24/2026
Special inspection requirement — Interior lighting power
Altagracia Martinez
06/24/2026
Special inspection requirement — Final
Altagracia Martinez
06/24/2026
Special inspection requirement — Mechanical Systems
Balser Richard
06/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
Altagracia Martinez
06/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
Balser Richard
06/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Balser Richard
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Balser Richard
06/24/2026
Special inspection requirement — Lighting controls
Altagracia Martinez
06/24/2026
Special inspection requirement — Final
Balser Richard
06/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
Balser Richard
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Altagracia Martinez
06/23/2026
Objection resolved — Resolved
06/23/2026
Objection resolved — Resolved
06/19/2026
Filed — Alteration
New Mechanical System at existing Eating and Drinking Establishiment. No Change to Use Egress and Occupancy
M01393852-I1
06/16/2026
Objection raised — Cost
06/16/2026
Objection raised — Zoning
06/16/2026
Objection raised — Scope
06/16/2026
Objection raised — Scope
06/16/2026
Objection raised — Admin
06/16/2026
Objection raised — Mechanical
06/16/2026
Objection raised — Scope
06/11/2026
Permit issued — Suspended Scaffold
M01401799-I1-SC
06/10/2026
Objection resolved — Addressed
06/05/2026
Objection raised — Other
05/27/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01401799-I1
05/19/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
05/15/2026
Filed — Alteration
mechanical work to 8th Floor as per plans filed herewith. no change to use, egress or occupancy.
M01344086-P1
05/14/2026
Filed — Alteration
M01358076-P1
05/14/2026
Special inspection requirement — Final
Balser Richard
05/14/2026
Special inspection requirement — Sprinkler Systems
Leo Lee
Latest 60 of 198 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOLIL MANAGEMENT3407/08/2026
85 EAST 158TH STREET1206/28/2026
124 EAST 40TH STREET2403/22/2026
124 EAST 40 ST203/22/2026
DUPONT ASSOC503/22/2026
EMPIRE ASSOC REALTY203/22/2026
EMPIRE ASSOCS.REALTY CO.103/22/2026
MEL JAY DELI CORP103/22/2026
124 E 40TH STREET303/21/2026
WALSAM FORTIETH COMPANY203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1803/21/2026
HTX BUILDING CONSULTING103/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
CAPITOL FIRE SPRINKLER203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALL CITY REMODELING, INCGeneral Contractor1107/08/2026
MND CONSTRUCTION CORPGeneral Contractor603/21/2026
CS BRIDGE CORPGeneral Contractor407/08/2026
ABR PLBG&HTG CONTR INCPlumbing207/08/2026
WALTON, MARCElectrical103/21/2026
WCK ELECTRIC CORP.Electrical103/22/2026
CAPITOL FIRE SPRINKLER COFire Protection107/08/2026
A.MIRANDA CONTRACTING CORElectrical103/21/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
HEMNAUTH, SUDESHElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RICHARD H. BALSER ENGINEE3028707/01/2026
PROJECT TACTICAL SOLUTION5859306/26/2026
LEO Y LEE ASSOCIATES2481505/14/2026
KN3 ENGINEERING LLC9238103/04/2025
INDETAIL DESIGN ARCHITECT4828111/23/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC06/11/2026
DOB NOWSprinklersPermit IssuedCAPITOL FIRE SPRINKLER CO02/27/2026
DOB NOWMechanical SystemsPermit IssuedALL CITY REMODELING, INC01/26/2026
DOB NOWMechanical SystemsPermit IssuedALL CITY REMODELING, INC01/09/2026
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC01/06/2026
DOB NOWStructuralPermit IssuedALL CITY REMODELING, INC08/18/2025
DOB NOWConstruction FenceSigned-offALL CITY REMODELING, INC07/22/2025
DOB NOWGeneral ConstructionSigned-offALL CITY REMODELING, INC07/22/2025
DOB NOWGeneral ConstructionPermit IssuedALL CITY REMODELING, INC06/25/2025
DOB NOWGeneral ConstructionPermit IssuedALL CITY REMODELING, INC06/12/2025
DOB NOWPlumbingSigned-offABR PLBG&HTG CONTR INC06/05/2025
DOB NOWGeneral ConstructionPermit IssuedALL CITY REMODELING, INC03/10/2025
DOB NOWSuspended ScaffoldPermit IssuedJERRICK ASSOCIATES, INC10/23/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP08/29/2024
DOB NOWGeneral ConstructionSigned-offMND CONSTRUCTION CORP06/11/2024
DOB NOWSuspended ScaffoldSigned-offSHR3 CONSTRUCTION CORP06/06/2024
DOB NOWStructuralSigned-offMND CONSTRUCTION CORP04/03/2024
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/05/2023
DOB NOWSidewalk ShedSigned-offCS BRIDGE CORP09/30/2022
DOB NOWPlumbingSigned-offNICHOLAS SUIDA03/30/2021
DOB NOWConstruction FencePermit IssuedALL CITY REMODELING, INC11/08/2019
BISOTISSUEDINDETAIL LLC12/03/2020
BISOTISSUEDALL CITY REMODELING, INC06/23/2020
BISOTISSUEDALL CITY REMODELING, INC09/25/2019
BISOTISSUEDALL CITY REMODELING, INC07/02/2019
BISSPISSUEDWELKIN FIRE PROTECTION LL01/16/2019
BISOTISSUEDALL CITY REMODELING, INC07/11/2018
BISOTISSUEDALL CITY REMODELING, INC07/31/2017
BISEQISSUEDJERRICK ASSOCIATES INC06/20/2016
BISFPISSUEDIDEAL FIRE SAFETY SYS. IN08/27/2009
BISPLISSUEDPRIME PIPING & HEATING IN04/25/2007
BISOTISSUEDPJ CONSTRUCTION04/25/2007
BISFPISSUEDIDEAL FIRE SYSTEMS INC10/11/2006
BISOTISSUEDMODERN CONSTRUCTION & RESTORATI03/10/2006
BISPLISSUEDHEADQUARTERS MECHANICAL INC05/12/2004
BISOTISSUEDASTRO OF NY04/19/2004
BISEQISSUEDNOVA PLBG AND HTG INC05/20/2002
BISOTISSUEDNOVA PLBG AND HTG INCV05/20/2002
BISOTISSUEDTINDEL WATERPROOFING & RESTORATI07/18/2000
BISEQISSUEDBRIDGEWORKS OF GREATER NY07/17/2000
+ 8 more permits on file
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/29/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 80
DateRequirementInspectorRole
07/02/2026HVAC-R and service water heating equipmentBalser Richardenergy_progress
07/02/2026HVAC-R and service water heating system controlsBalser Richardenergy_progress
07/02/2026Mechanical SystemsBalser Richardspecial
07/02/2026Energy Code Compliance InspectionsBalser Richardprogress
07/02/2026FinalBalser Richardprogress
07/02/2026HVAC-R and service water piping design and insulationBalser Richardenergy_progress
06/26/2026Interior lighting powerAltagracia Martinezenergy_progress
06/26/2026Lighting controlsAltagracia Martinezenergy_progress
06/26/2026Fire-Resistant Penetrations and JointsMax Leespecial
06/26/2026FinalAltagracia Martinezprogress
06/26/2026Fire-Resistance Rated ConstructionAltagracia Martinezprogress
06/26/2026Energy Code Compliance InspectionsAltagracia Martinezprogress
06/24/2026HVAC-R and service water piping design and insulationBalser Richardenergy_progress
06/24/2026Lighting controlsAltagracia Martinezenergy_progress
06/24/2026Fire-Resistance Rated ConstructionAltagracia Martinezprogress
06/24/2026FinalAltagracia Martinezprogress
06/24/2026Energy Code Compliance InspectionsAltagracia Martinezprogress
06/24/2026Fire-Resistant Penetrations and JointsMax Leespecial
06/24/2026Mechanical SystemsBalser Richardspecial
06/24/2026Energy Code Compliance InspectionsBalser Richardprogress
06/24/2026FinalBalser Richardprogress
06/24/2026Interior lighting powerAltagracia Martinezenergy_progress
06/24/2026HVAC-R and service water heating equipmentBalser Richardenergy_progress
06/24/2026HVAC-R and service water heating system controlsBalser Richardenergy_progress
05/19/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
Latest 25 of 80.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings30
▸DOB NOWPlans/Sketch26
09/01/2026M08012445-I1Request digital key ↗
09/01/2026M07997975-I1Request digital key ↗
08/26/2026M01125474-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00230534-I1Request digital key ↗
08/14/2026M00428783-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/05/2026M00259916-I1Request digital key ↗
08/15/2026M00259916-P1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
05/27/2022123748007Open ↗
05/26/2022123748007Open ↗
05/21/2022123748007Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
12/03/2020140976996Open ↗
09/26/2019123748007Open ↗
07/03/2019123302363Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications94
▸DOB NOWProgress Inspector Seal & Signature32
09/23/2026M01345924-I1Open ↗
09/23/2026M01345924-I1Open ↗
09/07/2026M01242158-S1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00259916-P1Open ↗
09/05/2026M00259916-I1Open ↗
09/04/2026M00428783-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/23/2026M01345924-I1Open ↗
09/07/2026M01242158-S1Open ↗
09/02/2026M01358076-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/27/2020123126198Open ↗
03/27/2020123126198Open ↗
10/30/2019123126198Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/25/2019123748007Open ↗
08/07/2017123302363Open ↗
06/16/2016140509910Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/21/2022123748007Open ↗
09/25/2019123748007Open ↗
08/07/2017123302363Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/16/2020140976996Open ↗
06/16/2016140509910Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/16/2020140976996Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/16/2016140509910Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/22/2018123126198Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
06/16/2016140509910Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/01/2026M07997975-I1Open ↗
08/23/2026M01242158-S1Open ↗
08/23/2026M01242158-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
11/30/2020140976996Open ↗
09/25/2019123748007Open ↗
09/25/2018123126198Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/02/2022123748007Open ↗
06/01/2022123748007Open ↗
05/20/2022123748007Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/25/2019123748007Open ↗
08/07/2017123302363Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
06/02/2022123748007Open ↗
06/01/2022123748007Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/23/2021140976996Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/16/2020140976996Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/16/2016140509910Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY10
06/02/2022123748007Open ↗
06/02/2022123748007Open ↗
06/01/2022123748007Open ↗
Showing 3 of 10 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
08/22/2018123126198Open ↗
08/22/2018123126198Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
01/18/2017140509910Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
06/02/2022123748007Open ↗
06/25/2021140976996Open ↗
03/27/2020123126198Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT8
06/02/2022123748007Open ↗
06/01/2022123748007Open ↗
11/16/2020140976996Open ↗
Showing 3 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/25/2021140976996Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
12/02/2020140976996Open ↗
12/02/2020140976996Open ↗
11/30/2020140976996Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
09/25/2019123748007Open ↗
08/22/2018123126198Open ↗
08/07/2017123302363Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/16/2020140976996Open ↗
06/16/2016140509910Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M01228978-P2Open ↗
08/16/2026M01228978-P1Open ↗
▸BISBOROUGH INTAKE FORM1
03/27/2020123126198Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications3
08/14/2026M01401799-I1Open ↗
08/13/2026M01054195-I1Open ↗
08/13/2026M01125474-I1Open ↗
▸DOB NOWCalculations3
08/14/2026M01401799-I1Open ↗
08/13/2026M01125474-I1Open ↗
08/13/2026M01054195-I1Open ↗