← Back
Elevator apt, semi-fireproof with stores
3488 BROADWAY
MANHATTAN · BIN 1061873
💬 Discuss this project
1920Year Built
6Stories
D7Building Class
R8Zoning
46,946 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized
Elevator apt, semi-fireproof with stores · Owner of record: 3480-3496 BROADWAY ASSOCIATES, · 10,000 sf lot · 4.69 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 5 docs
Floor 42p · 1 filing · 10 docs
Floor 3
Floor 2
Floor 1Under Construction14p · 2 filings · 15 docs
CellarUnder Construction17p · 2 filings · 15 docs
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
11/26/2025FinalYou Gaoprogress
11/26/2025Structural Stability – Alterations of existing buildingsYou Gaospecial
10/30/2025Tenant Protection Plan ComplianceERIK LIEPINSspecial
10/30/2025Tenant Protection Plan ComplianceERIK LIEPINSspecial
10/22/2025Duct leakage testing, insulation and designERIK LIEPINSenergy_progress
10/22/2025HVAC-R and service water piping design and insulationERIK LIEPINSenergy_progress
10/22/2025Exterior lighting powerERIK LIEPINSenergy_progress
10/22/2025Interior lighting powerERIK LIEPINSenergy_progress
10/22/2025HVAC-R and service water heating equipmentERIK LIEPINSenergy_progress
10/22/2025Lighting controlsERIK LIEPINSenergy_progress
10/22/2025HVAC-R and service water heating system controlsERIK LIEPINSenergy_progress
10/22/2025Maintenance informationERIK LIEPINSenergy_progress
10/22/2025Fire-Resistant Penetrations and JointsERIK LIEPINSspecial
10/22/2025Insulation placement and R valuesERIK LIEPINSenergy_progress
10/22/2025Mechanical SystemsERIK LIEPINSspecial
10/22/2025Energy Code Compliance InspectionsERIK LIEPINSprogress
10/22/2025FinalERIK LIEPINSprogress
01/22/2025Lighting in dwelling unitsKenneth Hudesenergy_progress
01/21/2025Energy Code Compliance InspectionsKenneth Hudesprogress
01/21/2025Fire-Resistance Rated ConstructionKenneth Hudesprogress
01/21/2025FinalKenneth Hudesprogress
01/21/2025Fire-Resistant Penetrations and JointsKenneth Hudesspecial
01/21/2025Tenant Protection Plan ComplianceKenneth Hudesspecial
01/21/2025Tenant Protection Plan ComplianceKenneth Hudesspecial
04/05/2023Tenant Protection Plan ComplianceSandeep Gunnalaspecial
Latest 25 of 26.
Nothing on file for this building.