← Back
Elevator apt, converted
349 BROADWAY
MANHATTAN · BIN 1001910
💬 Discuss this project
1915Year Built
9Stories
D5Building Class
C6-4AZoning
42,000 sfGross Floor Area
14Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SAFEFDNY Report ↗
Elevator apt, converted · 4,755 sf lot · 8.83 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T-MOBILE503/22/2026
DALIA,MARLA LESLY TRUST1903/22/2026
OWNER OF 349 BROADWAY103/22/2026
349 BROADWAY GROUP L P3503/22/2026
I.A.B MGT INC MICHAEL FAP103/22/2026
IAB MANAGEMENT603/22/2026
DALE MANAGEMENT CORP203/22/2026
AB MANAGEMENT INC103/22/2026
INTERNATIONAL PROPERTI903/22/2026
OWNER OF 349 BWAY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TECTONIC ENGINEERING209/15/2022
GBN ENGINEERING LLC103/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM CONSULTING GROUP, INC.303/21/2026
HS DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMP COMMUNICATIONS LLCGeneral Contractor303/21/2026
GOTHAM COMMUNICATIONS LLCGeneral Contractor303/21/2026
PATRICK KENNELLYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GBN ENGINEERING LLC4670103/18/2022
Building Lifecycle
All (96)Filed (4)Permit Issued (4)Signed Off (3)Facade (FISP) (22)Violation (60)Objection (2)Special Inspection (1)
01/28/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01092971-I1
04/30/2025
Cycle 10 facade report submitted
04/30/2025
Cycle 10 facade report signed — SAFE
04/29/2025
Cycle 10 facade inspection completed
04/09/2025
Cycle 10 facade report submitted
04/07/2025
Cycle 10 facade inspection completed
04/07/2025
Cycle 10 facade report signed — UNSAFE
03/14/2025
Permit issued — Suspended Scaffold
M01092971-I1-SC
09/09/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/19/2024
Permit issued — Suspended Scaffold
M01092971-I1-SC
08/09/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SUSPENDED SCAFFOLD EQUIPMENT
M01092971-I1
06/06/2024
Violation issued (ECB, closed)
Construction
05/21/2024
Cycle 9 facade report submitted
05/21/2024
Cycle 9 facade inspection completed
03/29/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2023
Signed off — Alteration
Dish-Installation of new antennas, RRHs, GPS antenna & equip. cabinet in the existing platform on the roof. Existing conduits and service room connection to be utilized as per plans.All work is in compliance with 5/98.No change in use, egress or occupancy
M00673049-I1
12/13/2022
Violation issued (FDNY_NOV, closed)
09/28/2022
Signed off — Alteration
Sprint - Removal of antenna sectors, equipment cabinets and related cable trays on the roof. No change in use, egress, or occupancy.
M00595072-I1
09/19/2022
Special inspection requirement — Final
ANTONIO GUALTIERI
09/15/2022
Filed — Alteration
Sprint - Removal of antenna sectors, equipment cabinets and related cable trays on the roof. No change in use, egress, or occupancy.
M00595072-P1
06/21/2022
Violation issued (FDNY_NOV, closed)
04/12/2022
Permit issued — Antenna
M00673049-I1-AN
04/07/2022
Permit issued — General Construction
M00595072-I1-GC
03/18/2022
Filed — Alteration
Dish-Installation of new antennas, RRHs, GPS antenna & equip. cabinet in the existing platform on the roof. Existing conduits and service room connection to be utilized as per plans.All work is in compliance with 5/98.No change in use, egress or occupancy
M00673049-I1
12/02/2021
Objection raised — Admin
12/02/2021
Objection resolved — Addressed
11/30/2021
Filed — Alteration
Sprint - Removal of antenna sectors, equipment cabinets and related cable trays on the roof. No change in use, egress, or occupancy.
M00595072-I1
02/17/2021
Cycle 9 facade report submitted
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/15/2021
Cycle 9 facade inspection completed
02/15/2021
Cycle 9 facade report signed — UNSAFE
07/07/2020
Violation issued (FDNY_NOV, closed)
03/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/23/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/03/2019
Violation issued (ECB, closed)
Construction
09/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/27/2018
Violation issued (ECB, closed)
Local Law
06/11/2018
Cycle 8 facade report submitted
06/11/2018
Cycle 8 facade inspection completed
06/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/06/2018
Cycle 8 facade report signed — UNSAFE
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/23/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/04/2017
Violation issued (HPD, closed)
C
12/04/2017
Violation issued (HPD, closed)
C
12/04/2017
Violation issued (HPD, closed)
C
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2014
Violation issued (FDNY_ORDER, closed)
05/21/2014
Violation issued (FDNY_ORDER, closed)
10/11/2013
Violation issued (FDNY_NOV, closed)
09/17/2013
Violation issued (FDNY_NOV, closed)
07/10/2013
Violation issued (FDNY_NOV, closed)
07/01/2013
Violation issued (ECB, closed)
Construction
07/01/2013
Violation issued (ECB, closed)
Construction
07/01/2013
Violation issued (ECB, closed)
Construction
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offKNS BLDG RESTORATION INC03/14/2025
DOB NOWSuspended ScaffoldSigned-offKNS BLDG RESTORATION INC08/19/2024
DOB NOWAntennaSigned-offGOTHAM COMMUNICATIONS LLC04/12/2022
DOB NOWGeneral ConstructionSigned-offAMP COMMUNICATIONS LLC04/07/2022
BIS—ISSUEDALLIED RESTORATION CORP03/26/2026
BIS—ISSUEDPROSPERITY GROUP NY, INC01/22/2026
BISOTISSUEDKNS BUILDING REST. INC03/13/2025
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/29/2025
BIS—ISSUEDZ & K RENOVATION, CORP03/26/2024
BISOTISSUEDKNS BUILDING REST. INC03/19/2024
BIS—ISSUEDZ & K RENOVATION, CORP03/14/2024
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/31/2024
BIS—ISSUEDZ & K RENOVATION, CORP04/03/2023
BISOTISSUEDKNS BUILDING REST. INC03/31/2023
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/19/2023
BISOTISSUEDKNS BUILDING REST. INC04/04/2022
BIS—ISSUEDZ & K RENOVATION, CORP02/15/2022
BIS—ISSUEDZ & K RENOVATION, CORP02/15/2022
BIS—ISSUEDZ & K RENOVATION, CORP02/14/2022
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/14/2022
BIS—ISSUEDZ & K RENOVATION, CORP10/24/2021
BISOTISSUEDKNS BUILDING REST. INC03/24/2021
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/18/2021
BIS—ISSUEDZ & K RENOVATION, CORP02/12/2021
BIS—ISSUEDZ & K RENOVATION, CORP11/05/2020
BIS—ISSUEDZ & K RENOVATION, CORP11/03/2020
BIS—ISSUEDZ & K RENOVATION, CORP10/28/2020
BIS—ISSUEDZ & K RENOVATION, CORP10/14/2020
BIS—ISSUEDZ & K RENOVATION, CORP10/14/2020
BISOTISSUEDZ & K RENOVATION, CORP06/19/2020
BISOTISSUEDKNS BUILDING REST. INC03/23/2020
BIS—ISSUEDZ & K RENOVATION, CORP03/12/2020
BISPLISSUEDZ.W. PLBG & HTG CORP03/05/2020
BIS—ISSUEDZ & K RENOVATION, CORP03/04/2020
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/24/2020
BISOTISSUEDKNS BUILDING REST. INC03/18/2019
BISEQISSUEDROCKLEDGE SCAFFOLD CORP02/19/2019
BISOTISSUEDKNS BUILDING REST. INC02/01/2019
BIS—ISSUEDZ & K RENOVATION, CORP11/08/2018
BISPLISSUEDNYC PLUMBING & HEATING IN09/27/2018
+ 14 more permits on file
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/19/2022FinalANTONIO GUALTIERIprogress
▾Documents — 490 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/02/2026M00673049-I1Request digital key ↗
09/01/2026M00595072-P1Request digital key ↗
08/26/2026M01092971-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits117
▸BISPLAN / WORK APPROVAL APPLICATION64
01/30/2026123168419Open ↗
01/07/2026122765800Open ↗
08/29/2025123168419Open ↗
Showing 3 of 64 on file for this type
▸BISWORK PERMIT APPLICATION46
01/23/2026122765800Open ↗
01/29/2025140629862Open ↗
03/26/2024102884470Open ↗
Showing 3 of 46 on file for this type
▸BISPLACE OF ASSEMBLY5
08/25/2023123591531Open ↗
12/07/2018123591531Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/08/2020122765800Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/28/2021102884470Open ↗
▸Seals & Professional Certifications72
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION51
02/20/2020123242614Open ↗
02/20/2020123242614Open ↗
01/17/2020123242614Open ↗
Showing 3 of 51 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/02/2026M00673049-I1Open ↗
09/01/2026M00595072-I1Open ↗
08/13/2026M00595072-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026M00595072-I1Open ↗
▸Trade Schedules & Equipment29
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
01/06/2020122765800Open ↗
01/08/2019123265787Open ↗
11/21/2018123265787Open ↗
Showing 3 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
12/18/2018120295929Open ↗
11/16/2018120295929Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
01/17/2020123242614Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS1
01/17/2020123242614Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
12/26/2018123158153Open ↗
Showing 1 of 3 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos30
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)12
12/26/2018123158153Open ↗
12/11/2018122567953Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026M00673049-I1Open ↗
08/15/2026M00595072-I1Open ↗
08/13/2026M00595072-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance33
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
02/20/2020123242614Open ↗
02/20/2020123242614Open ↗
07/24/2019121115220Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
06/29/2023121761049Open ↗
09/23/2020123158153Open ↗
02/20/2020123242614Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/04/2025123168419Open ↗
▸BISTR8 INSPECTOR TO CONFIRM AS-BUILT VALUES1
06/29/2023121761049Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/04/2025123168419Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/23/2020123158153Open ↗
06/19/2020123158153Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/17/2020123242614Open ↗
01/17/2020123242614Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/19/2020123158153Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/21/2023121761049Open ↗
▸Approvals, Objections & Sign-offs70
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST26
02/02/2026123168419Open ↗
09/05/2025140629862Open ↗
06/29/2023121761049Open ↗
Showing 3 of 26 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
01/29/2025140629862Open ↗
01/31/2024140629862Open ↗
01/31/2024140629862Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
08/30/2022102884470Open ↗
08/25/2022102884470Open ↗
08/20/2018102884470Open ↗
Showing 3 of 7 on file for this type
▸BISSHED LETTER6
01/29/2025140629862Open ↗
01/31/2024140629862Open ↗
01/20/2023140629862Open ↗
Showing 3 of 6 on file for this type
▸BISFINAL4
09/04/2025123168419Open ↗
09/04/2025140629862Open ↗
06/21/2023121761049Open ↗
Showing 3 of 4 on file for this type
▸BISSUPERSEDING LETTER2
01/23/2026122765800Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT41
11/28/2025123168419Open ↗
08/28/2025123168419Open ↗
06/29/2023121761049Open ↗
Showing 3 of 41 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATIONS - AFFIDAVIT ATTACHED2
09/12/2024102884470Open ↗
02/02/2024102884470Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLTION OF OPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
09/14/2025102884470Open ↗
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED1
04/15/2025102884470Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
09/04/2025123168419Open ↗
▸Filing & Intake Forms68
▸BISBOROUGH INTAKE FORM30
01/29/2025140629862Open ↗
01/31/2024140629862Open ↗
01/20/2023140629862Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION20
01/30/2026123168419Open ↗
08/29/2025123168419Open ↗
07/25/2024122765800Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET17
12/26/2018123158153Open ↗
Showing 1 of 17 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
01/20/2023140629862Open ↗
01/18/2022140629862Open ↗
02/19/2021140629862Open ↗
Showing 3 of 6 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
08/13/2026M01092971-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01092971-I1Open ↗