Condo, commercial tower (mixed-use) [derived]
349 EAST 149 STREET
BRONX · Melrose · BIN 2000933
💬 Discuss this project
1927Year Built
10Stories
RCBuilding Class
C4-4Zoning
72,532 sfGross Floor Area
3Units
LL97 Covered0 Open ViolationsFISP: SAFE
Condo, commercial tower (mixed-use) [derived] · 8,000 sf lot · 9.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof8p · 8 filings · 20 docs
Floor 8Under Construction20p · 2 filings · 9 docs
Floor 7
Floor 61p · 1 filing · 4 docs
Floor 51p · 1 filing · 9 docs
Floor 44p · 3 filings · 20 docs
Floor 37p · 4 filings · 20 docs
Floor 29p · 3 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar3p · 2 filings · 6 docs
Basement2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GFP REAL ESTATE11107/08/2026
NEWMARK1407/08/2026
CONSTRUCTOMICS, LLC503/22/2026
PLATINUM SERVICES NY503/22/2026
COUGAR 11 ASSOCIATES LLC203/22/2026
COUGAR 2 ASSOCIATES LLC903/22/2026
COUGAR II ASSOCIATES2603/22/2026
COUGAR ASSOCIATES303/21/2026
NEWMARK & COMPANY REAL103/21/2026
NEWMARK & COMPANY REAL ESTATE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTOMICS LLCGeneral Contractor607/08/2026
SKH MECHANICAL CORPFire Protection407/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor307/08/2026
A.A. MECHANICAL SOL INCGeneral Contractor303/21/2026
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
AQUA PLUMBING & HTNG CORPPlumbing307/08/2026
ADVANCED CELLULAR SOLUTIOGeneral Contractor207/08/2026
MARICK CONTRACTING CORPGeneral Contractor204/09/2026
NETCOM SERVICES INCGeneral Contractor203/21/2026
CS BRIDGE CORPGeneral Contractor203/21/2026
THOMAS FAYFire Protection203/21/2026
KMM TELECOMMUNICATIONSGeneral Contractor107/08/2026
ROYAL CONCRETE AND MASON*General Contractor107/08/2026
SOUND REFRIGERATION & AIRGeneral Contractor106/28/2026
AURA PLUMBING INCPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
COSIMO CURCIOElectrical103/21/2026
NATIONAL MAINTENANCEScaffold107/08/2026
CURCIO COSIMOElectrical103/21/2026
DANICK ELEC'L CONTR'G CORElectrical103/22/2026
HENRY KHODOSHElectrical103/21/2026
PHILIP GOEHRINGElectrical103/21/2026
SILVESTRO PACEElectrical103/21/2026
ADVANCED PLBG, MECH & SPRFire Protection107/08/2026
ANESIS SERVICES CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808105/04/2026
WALTER T. GORMAN, P.E., P268609/09/2025
PCS ENGINEERING3745109/19/2024
WINTON GROUP ARCHITECTURE4343106/04/2024
R MARSAC CONSULTING LLC329210/26/2023
COHEN ENTERPRISES & E9511212/22/2022
AK ENGINEERING PC6781207/26/2022
JACK GREEN ASSOCIATES422109/22/2021
Z & T ENGINEERING, P.C.591304/14/2021
TECTONIC ENGINEERING CONS106204/30/2019
Building Lifecycle
All (272)Filed (38)Permit Issued (35)Signed Off (22)Facade (FISP) (15)Violation (60)Inspection (16)Objection (56)Special Inspection (30)
08/19/2026
Signed off — Alteration
REPLACE ONE (1) 20-TON AIR-COOLED INDOOR SELF-CONTAINED PACKAGE SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01258079-I1
08/17/2026
Signed off — Alteration
X01260989-I1
05/05/2026
Permit issued — Mechanical Systems
X01258079-I1-MS
05/04/2026
Filed — Alteration
REPLACE ONE (1) 20-TON AIR-COOLED INDOOR SELF-CONTAINED PACKAGE SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01258079-I1
11/17/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/20/2025
Permit issued — Mechanical Systems
X01260970-I1-MS
10/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/26/2025
Permit issued — Plumbing
X01260989-I1-PL
09/26/2025
Permit issued — Plumbing
X01260989-I1-EW-SP
09/09/2025
Filed — Alteration
X01260989-I1
09/09/2025
Filed — Alteration
Propose to perform mechanical work. No change in use, egress or occupancy.
X01260970-I1
08/29/2025
Signed off — Alteration
X01109938-I1
08/25/2025
Permit issued — General Construction
X01260950-I1-GC
08/18/2025
Filed — Alteration
Propose to perform interior renovations. No change in use, egress or occupancy.
X01260950-I1
07/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Walter Gorman
07/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
07/24/2025
Special inspection requirement — Final
DANIEL MONTROY
03/17/2025
Signed off — Alteration
Installation of gas piping from ROOF to OSP to BASEMENT. Relevant MS Generator DOB Now Job # X00548289 No change to use, egress, or occupancy.
X00548514-I1
03/17/2025
Signed off — Alteration
Installation of equipment platform on ROOF. No change to use, egress, or occupancy.
X00621689-I1
03/17/2025
Signed off — Alteration
Installation of (1) non-emergency gas generator on ROOF. No change to use, egress, or occupancy. Related Plumbing filed separately DOB Now Job #
X00548289-I1
01/16/2025
Cycle 9 facade report submitted
01/14/2025
Cycle 9 facade report signed — SAFE
01/07/2025
Signed off — Alteration
X01115175-I1
01/07/2025
Signed off — Alteration
X01053357-I1
12/27/2024
Cycle 9 facade inspection completed
09/24/2024
Permit issued — Sidewalk Shed
X01115175-I1-SH
09/23/2024
Filed — Alteration
X01115175-I1
09/23/2024
Permit issued — General Construction
X01053357-I1-GC
09/19/2024
Filed — Alteration
X01109938-I1
09/19/2024
Permit issued — Suspended Scaffold
X01109938-I1-SC
08/01/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
07/01/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/04/2024
Filed — Alteration
X01053357-I1
05/17/2024
Special inspection requirement — Masonry
Vladimir Kaushansky
05/17/2024
Special inspection requirement — Final
EMIRJETA TAIPI
02/14/2024
Permit issued — Suspended Scaffold
X01000062-I1-SC
02/06/2024
Filed — Alteration
X01000062-I1
12/22/2023
Cycle 9 facade report signed — SWARMP
12/12/2023
Cycle 9 facade report submitted
11/29/2023
Cycle 9 facade inspection completed
11/14/2023
Permit issued — General Construction
X00621689-I1-GC
11/14/2023
Permit issued — Mechanical Systems
X00548289-I1-MS
11/09/2023
Permit issued — Plumbing
X00548514-I1-PL
11/03/2023
Special inspection requirement — Final
ALLAN COHEN
11/03/2023
Special inspection requirement — Post-installed Anchors
ALLAN COHEN
11/01/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — Other
10/27/2023
Objection raised — C/O of existing property requi
10/27/2023
Objection resolved — Addressed
10/26/2023
Filed — Alteration
Installation of gas piping from ROOF to OSP to BASEMENT. Relevant MS Generator DOB Now Job # X00548289 No change to use, egress, or occupancy.
X00548514-P1
10/26/2023
Filed — Alteration
Installation of (1) non-emergency gas generator on ROOF. No change to use, egress, or occupancy. Related Plumbing filed separately DOB Now Job #
X00548289-P1
10/26/2023
Filed — Alteration
Installation of equipment platform on ROOF. No change to use, egress, or occupancy.
X00621689-P1
10/18/2023
Special inspection requirement — Final
Robert Marsac
Latest 60 of 272 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSOUND REFRIGERATION & AIR05/05/2026
DOB NOWMechanical SystemsPermit IssuedMARICK CONTRACTING CORP10/20/2025
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I09/26/2025
DOB NOWPlumbingSigned-offTHOMAS FAY09/26/2025
DOB NOWGeneral ConstructionPermit IssuedMARICK CONTRACTING CORP08/25/2025
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/24/2024
DOB NOWGeneral ConstructionSigned-offROYAL CONCRETE AND MASON*09/23/2024
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC09/19/2024
DOB NOWSuspended ScaffoldPermit IssuedPPM TELECOM LLC02/14/2024
DOB NOWGeneral ConstructionSigned-offADVANCED CELLULAR SOLUTIO11/14/2023
DOB NOWMechanical SystemsPermit IssuedADVANCED CELLULAR SOLUTIO11/14/2023
DOB NOWPlumbingSigned-offAURA PLUMBING INC11/09/2023
DOB NOWSprinklersSigned-offSKH MECHANICAL CORP11/23/2022
DOB NOWSprinklersSigned-offSKH MECHANICAL CORP09/19/2022
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC08/30/2022
DOB NOWMechanical SystemsSigned-offA.A. MECHANICAL SOL INC08/15/2022
DOB NOWSprinklersSigned-offQMB PLUMBING & HTG INC07/21/2022
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/20/2022
DOB NOWSprinklersSigned-offADVANCED PLBG, MECH & SPR11/26/2021
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP10/18/2021
DOB NOWMechanical SystemsSigned-offCONSTRUCTOMICS LLC10/05/2021
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP04/30/2021
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP04/01/2021
DOB NOWSprinklersSigned-offSKH MECHANICAL CORP02/04/2021
DOB NOWStructuralSigned-offCONSTRUCTOMICS LLC09/28/2020
DOB NOWMechanical SystemsSigned-offCONSTRUCTOMICS LLC09/28/2020
DOB NOWSprinklersSigned-offSKH MECHANICAL CORP06/30/2020
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL03/30/2020
DOB NOWPlumbingSigned-offAQUA PLUMBING & HTNG CORP03/19/2020
DOB NOWSupported ScaffoldSigned-offCS BRIDGE CORP03/09/2020
DOB NOWMechanical SystemsSigned-offCONSTRUCTOMICS LLC02/05/2020
DOB NOWStructuralSigned-offCONSTRUCTOMICS LLC01/29/2020
DOB NOWAntennaSigned-offKMM TELECOMMUNICATIONS05/30/2019
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL05/28/2019
DOB NOWAntennaSigned-offNETCOM SERVICES INC12/06/2017
BIS—ISSUEDWALTER T. GORMAN, P.E. P.C.10/04/2021
BISOTISSUEDCONSTRUCTOMICS LLC09/20/2021
BISOTISSUEDCONSTRUCTOMICS LLC09/24/2020
BISOTISSUEDSKYLINE RESTORATION INC02/28/2020
BISOTISSUEDCONSTRUCTOMICS LLC12/02/2019
+ 45 more permits on file
1 project · most recent 05/04/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2026Signed-offSOUND REFRIGERATION & AIRHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Task Applied Products TYS203CAV 20 tons · Chiller ×1
Ventilation
Task Applied Products TYS203CAV 10,980 CFM · Chiller ×1
8 projects · most recent 08/28/2025
General Wiring
FiledStatusContractorScope
08/28/2025CompleteDELTA ELEC'L CONTR'G CORPGeneral Wiring
06/23/2025Permit IssuedJAM ELECTRICAL CORP—
09/23/2024CompleteRICHARD NEU—
08/31/2022CompleteHI-RITE ELECTRIC CORPGeneral Wiring
11/11/2021Permit IssuedDANICK ELEC'L CONTR'G CORGeneral Wiring
05/26/2021Permit IssuedSOLEIRE ELECL SOLTNS CORPGeneral Wiring
12/03/2019Permit IssuedJTE ELECTRICAL SERVICES—
05/06/2019CompleteOPTIMAL ELECTRIC, INC—
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
11/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2024Fail-Final CND-Occupancy InspectionFailView ↗
07/01/2024Fail-Final CND-Occupancy InspectionFailView ↗
02/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/23/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/20/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
07/24/2025Fire-Resistant Penetrations and JointsWalter Gormanspecial
07/24/2025Fire-Resistance Rated ConstructionWalter Gormanprogress
07/24/2025FinalDANIEL MONTROYprogress
05/17/2024MasonryVladimir Kaushanskyspecial
05/17/2024FinalEMIRJETA TAIPIprogress
11/03/2023Post-installed AnchorsALLAN COHENspecial
11/03/2023FinalALLAN COHENprogress
10/18/2023FinalRobert Marsacprogress
10/18/2023Mechanical SystemsRobert Marsacspecial
10/17/2023Post-installed AnchorsRobert Marsacspecial
10/17/2023FinalRobert Marsacprogress
08/01/2022HVAC insulation and sealing Ari Kamoenergy_progress
08/01/2022Mechanical SystemsAri Kamospecial
08/01/2022Fire-Resistant Penetrations and JointsAri Kamospecial
08/01/2022Energy Code Compliance InspectionsAri Kamoprogress
08/01/2022FinalAri Kamoprogress
08/01/2022Maintenance informationAri Kamoenergy_progress
08/01/2022Shutoff dampersAri Kamoenergy_progress
08/01/2022HVAC and service water heating system controls Ari Kamoenergy_progress
08/01/2022Electrical motorsAri Kamoenergy_progress
08/01/2022HVAC and service water heating equipment Ari Kamoenergy_progress
08/01/2022Heating SystemsAri Kamospecial
04/29/2022HVAC-R and service water piping design and insulationWalter Gormanenergy_progress
04/18/2022Mechanical SystemsWalter Gormanspecial
04/18/2022Sprinkler SystemsWalter Gormanspecial
Latest 25 of 75.
▾Documents — 811 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch19
08/25/2026X00497986-I1Request digital key ↗
08/25/2026X00562856-I1Request digital key ↗
08/24/2026X00720347-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
08/26/2026X00217723-P6Request digital key ↗
08/26/2026X00217723-I1Request digital key ↗
08/15/2026X00217723-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/25/2026X00217861-P3Request digital key ↗
08/15/2026X00217861-P2Request digital key ↗
08/15/2026X00217861-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural3
08/25/2026X00221979-I1Request digital key ↗
08/15/2026X00221979-P2Request digital key ↗
08/15/2026X00221979-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/14/2026X00217792-I1Request digital key ↗
08/14/2026X00217792-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/26/2026X00324174-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/26/2026X00162657-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/26/2026X00129777-I1Request digital key ↗
▸Applications & Permits137
▸BISPLAN / WORK APPROVAL APPLICATION80
10/15/2025220700926Open ↗
08/08/2025220700926Open ↗
07/24/2025220700926Open ↗
Showing 3 of 80 on file for this type
▸BISWORK PERMIT APPLICATION52
10/04/2021220700926Open ↗
12/02/2019220700944Open ↗
10/10/2019220641893Open ↗
Showing 3 of 52 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1133
09/28/2015220284332Open ↗
09/28/2015220284332Open ↗
Showing 2 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/07/2021220700926Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications228
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION79
03/03/2020220689306Open ↗
09/30/2019220700944Open ↗
09/30/2019220700944Open ↗
Showing 3 of 79 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/02/2026X01260950-I1Open ↗
09/02/2026X01260950-I1Open ↗
09/01/2026X00217723-P2Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
08/26/2026X00129777-I1Open ↗
08/26/2026X00162657-I1Open ↗
08/26/2026X00324174-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature36
09/02/2026X01260950-I1Open ↗
09/01/2026X00217723-P2Open ↗
09/01/2026X00217723-P2Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
04/29/2019220689743Open ↗
02/08/2019220689306Open ↗
Showing 2 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
06/06/2019240252230Open ↗
04/29/2019220689743Open ↗
02/08/2019220689306Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/06/2019240252230Open ↗
11/03/2016240159804Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/06/2019240252230Open ↗
11/03/2016240159804Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment84
▸BISSELF-CERT PLUMBING NOTICE24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISEQUIPMENT USE PERMITS13
02/11/2025220689342Open ↗
03/18/2021220689743Open ↗
07/30/2019240252230Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
02/11/2025220689342Open ↗
02/16/2024220257255Open ↗
03/18/2021220689743Open ↗
Showing 3 of 11 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
10/06/2015220209879Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
01/23/2020220689306Open ↗
11/07/2019220689306Open ↗
10/10/2019220689306Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWATER METER PERMIT : DEP-METER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
01/23/2025220689342Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
01/23/2025220689342Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
02/22/2021220700926Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos57
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
08/26/2026X00129777-I1Open ↗
08/25/2026X00221979-I1Open ↗
08/25/2026X00217861-P2Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
12/02/2019220700944Open ↗
06/06/2019240252230Open ↗
04/29/2019220689743Open ↗
Showing 3 of 19 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
10/10/2019220641893Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
12/03/2021220641893Open ↗
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
09/30/2019220700944Open ↗
09/30/2019220700944Open ↗
07/30/2019240252230Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
12/02/2021220641893Open ↗
07/30/2019240252230Open ↗
02/27/2018240159804Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/15/2021220700944Open ↗
12/02/2021220641893Open ↗
02/04/2021220689743Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
01/23/2025220689342Open ↗
12/15/2021220700944Open ↗
02/04/2021220689743Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
06/06/2019240252230Open ↗
11/03/2016240159804Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026X00720347-I1Open ↗
08/13/2026X00720355-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
01/23/2025220689342Open ↗
▸BIS* HVAC INSULATION AND SEALING1
01/23/2025220689342Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
12/15/2021220700944Open ↗
12/02/2021220641893Open ↗
02/04/2021220689743Open ↗
Showing 3 of 6 on file for this type
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMECHANICAL SYSTEMS1
01/23/2025220689342Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/23/2025220689342Open ↗
▸Approvals, Objections & Sign-offs65
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST38
02/11/2025220689342Open ↗
01/24/2025220689342Open ↗
12/19/2021220700944Open ↗
Showing 3 of 38 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
07/30/2019240252230Open ↗
02/27/2018240159804Open ↗
Showing 2 of 13 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSUPERSEDING LETTER1
07/18/2017220515985Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership65
▸BISCOST AFFIDAVIT59
12/02/2021220641893Open ↗
02/22/2021220700926Open ↗
01/29/2021220700944Open ↗
Showing 3 of 59 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
01/23/2025220689342Open ↗
06/14/2022220449094Open ↗
12/15/2021220700944Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms52
▸BISEFILING COVER SHEET31
11/16/2020220700926Open ↗
09/30/2019220700944Open ↗
04/29/2019220689743Open ↗
Showing 3 of 31 on file for this type
▸BISADDITIONAL INFORMATION12
10/24/2025220700926Open ↗
05/28/2021220700944Open ↗
01/29/2021220700944Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
03/03/2020220689306Open ↗
07/30/2019240252230Open ↗
02/27/2018240159804Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
06/06/2019240252230Open ↗
11/03/2016240159804Open ↗
Showing 2 of 4 on file for this type
▸Other Documents7
▸BISPLOT DIAGRAM2
02/22/2021220700926Open ↗
Showing 1 of 2 on file for this type
▸BISFA SELF CERT DEFECT : FD-FASC1
01/25/2018220449094Open ↗
▸BISBLOCK AND LOT RECORDS1
06/15/2021220700926Open ↗
▸DOB NOWIRA Certification1
08/13/2026X01000062-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01109938-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01109938-I1Open ↗