← Back
Primarily 2 family with 1 store or office
349 MYRTLE AVENUE
BROOKLYN · BIN 3058078
💬 Discuss this project
1960Year Built
3Stories
S2Building Class
R7AZoning
2,717 sfGross Floor Area
3Units
10 Open Violations ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 349 MYRTLE LLC · 1,826 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLANK PROPERTY GROUP803/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/30/2024$2.0M—349 MYRTLE AVE LLC → 349 MYRTLE LLC$729/sf building
10/06/2016$2.2M—NYC1957SC LLC → 349 MYRTLE AVE LLC$824/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN MCDONOUGH, PE308/12/2025
SH ENGINEERING PLLC404/30/2025
JAMES CLEARY ARCHITECTURE104/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BLANK PROPERTY GROUP303/21/2026
Building Lifecycle
All (124)Filed (8)Violation (19)Objection (67)Special Inspection (30)
04/18/2026
Violation issued (ECB, open)
Construction
04/18/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/01/2026
Objection raised — Admin
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
04/01/2026
Objection resolved — Resolved
03/18/2026
Objection resolved — Addressed
02/13/2026
Objection resolved — Resolved
01/27/2026
Objection resolved — Resolved
01/27/2026
Objection resolved — Resolved
01/27/2026
Objection resolved — Resolved
11/11/2025
Objection resolved — Addressed
10/03/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Admin
08/25/2025
Objection raised — Admin
08/22/2025
Special inspection requirement — Maintenance information
Brian McDonough
08/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Brian McDonough
08/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Brian McDonough
08/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Brian McDonough
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/14/2025
Objection resolved — Addressed
08/13/2025
Objection raised — Energy
08/13/2025
Objection raised — Cost
08/13/2025
Objection raised — Plumbing
08/13/2025
Objection raised — Zoning
08/13/2025
Objection raised — Other
08/12/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREBY FILING TO ENLARGE AN EXISTING 3 STORY MIXED USE BUILDING WITH 2 DWELLING UNITS & 1 COMMERCIAL UNIT INTO A 6 STORY, MIXED USE BUILDING WITH 8 DWELLING UNITS & 1 COMMERCIAL UNIT
B01178460-S5
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/31/2025
Objection resolved — Addressed
07/17/2025
Objection raised — Admin
07/11/2025
Objection raised — Fire_Protection
07/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREBY FILING TO ENLARGE AN EXISTING 3 STORY MIXED USE BUILDING WITH 2 DWELLING UNITS & 1 COMMERCIAL UNIT INTO A 6 STORY, MIXED USE BUILDING WITH 8 DWELLING UNITS & 1 COMMERCIAL UNIT
B01178460-S6
07/03/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
HEREBY FILING TO ENLARGE AN EXISTING 3 STORY MIXED USE BUILDING WITH 2 DWELLING UNITS & 1 COMMERCIAL UNIT INTO A 6 STORY, MIXED USE BUILDING WITH 8 DWELLING UNITS & 1 COMMERCIAL UNIT
B01178460-S7
06/30/2025
Objection resolved — Addressed
06/26/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/26/2025
Special inspection requirement — Sprinkler Systems
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/26/2025
Special inspection requirement — Energy Code Compliance Inspections
05/09/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Cost
05/07/2025
Objection raised — Admin
05/07/2025
Objection raised — Admin
05/07/2025
Objection raised — Cost
05/06/2025
Objection raised — Other
05/06/2025
Objection raised — Admin
05/02/2025
Objection raised — Zoning
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection raised — Structural
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISOTISSUEDUNIVERSAL DESIGN&DVLPMNT INC04/19/2006
BISPLISSUEDGENET PLBG AND HTG CORP04/19/2006
BISOTISSUEDUNIVERSAL DESIGN DEVEL INC03/16/2006
1 project · most recent 08/12/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Pmc Green PMCG-10HD-EH 5,100 BTU · Heat Pump Outdoor ×11
Ephoca Epocha AIO Floor Standing 6,600 BTU ×9
Epocha AIO Wall Mounted Pro 6,700 BTU ×1
Stelpro ASSOS1002W 2,559 BTU · Unit Heater ×6
AWFA3008TW 10,236 BTU · Electric Heater ×2
AWFA6008CTW 20,472 BTU · Electric Heater ×1
Lennox MWLDO12S6S-1P 12,000 BTU · Condensing Unit ×1
MWMDO12S6-1P 12,000 BTU · Ahu ×1
Ventilation
Greenheck G-097-VG 180 CFM · Exhaust Fan ×20
1 project · most recent 08/12/2025
Sprinkler System
FiledStatusContractorScope
08/12/2025——Sprinkler System
1 project · most recent 08/12/2025
Storm Water/Sanitary
FiledStatusContractorScope
08/12/2025——Storm, Water/Sanitary
1 project · most recent 08/12/2025
Steel Concrete Masonry
FiledStatusContractorScope
08/12/2025——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
08/22/2025Maintenance informationBrian McDonoughenergy_progress
08/22/2025HVAC-R and service water heating system controlsBrian McDonoughenergy_progress
08/22/2025HVAC-R and service water piping design and insulationBrian McDonoughenergy_progress
08/22/2025HVAC-R and service water heating equipmentBrian McDonoughenergy_progress
06/26/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/26/2025Fire-Resistant Penetrations and Joints—special
06/26/2025Sprinkler Systems—special
06/26/2025Fire-Resistant Penetrations and Joints—special
06/26/2025Energy Code Compliance Inspections—progress
04/30/2025Post-installed Anchors—special
04/23/2025Footing and Foundation—progress
04/23/2025Concrete - Cast-In-Place—special
04/23/2025Subgrade Inspections—special
04/23/2025Subsurface Investigations (Borings/Test Pits)—special
04/23/2025Structural Stability – Alterations of existing buildings—special
04/23/2025Final—progress
04/23/2025Footing and Foundation—progress
04/23/2025Concrete - Cast-In-Place—special
04/23/2025Construction Operations Influencing Adjacent Structures—special
04/23/2025Excavations - Sheeting, Shoring, and Bracing—special
04/23/2025Structural Stability – Alterations of existing buildings—special
04/23/2025Structural Steel - Details—special
04/23/2025Structural Steel - High Strength Bolting—special
04/23/2025Structural Steel - Welding—special
04/23/2025Subgrade Inspections—special
Latest 25 of 53.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026B01178460-I1Request digital key ↗
08/21/2026B01178460-S3Request digital key ↗
08/21/2026B01178460-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B01178460-I1Open ↗
08/13/2026B01178460-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01178460-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01178460-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01178460-I1Open ↗
08/21/2026B01178460-S6Open ↗
08/21/2026B01178460-S5Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01178460-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01178460-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01178460-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026B01178460-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026B01178460-S2Open ↗
08/13/2026B01178460-S1Open ↗
08/13/2026B01178460-S3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026B01178460-S3Open ↗
08/13/2026B01178460-S2Open ↗
08/13/2026B01178460-S1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/21/2026B01178460-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01178460-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01178460-I1Open ↗