← Back
Primarily 2 family with 1 store or office
3492 ATLANTIC AVENUE
BROOKLYN · BIN 3256597
💬 Discuss this project
1990Year Built
3Stories
S2Building Class
R5Zoning
4,200 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: JANNAT & TAYYIBA LLC · 3,885 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 34p · 1 filing · 20 docs
Floor 2
Floor 14p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JANNAT & TAYYIBA LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/19/2024$1.3M—— → —$304/sf building
06/14/2022$650K—NYCTL 1998-2TRUST AND THE BANK OF NEW YORK MELLON → 3492 ATLANTIC AVE LLC$155/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC507/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COMMERCIAL CAPITAL USA1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DESIGN PROCURE BUILD LLCGeneral Contractor304/09/2026
GLENNS PLUMBING SVCS INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449507/31/2025
Building Lifecycle
All (44)Filed (5)Permit Issued (4)Signed Off (2)Violation (6)Inspection (4)Special Inspection (23)
05/01/2026
Violation issued (HPD, closed)
A
12/03/2025
Signed off — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-I1
09/11/2025
Signed off — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-S1
08/29/2025
Permit issued — Mechanical Systems
B01069949-I1-GC-CX
08/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
08/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
08/01/2025
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
08/01/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/31/2025
Filed — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-P3
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
07/10/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
07/10/2025
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
06/20/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2025
Violation issued (HPD, closed)
A
06/05/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/27/2025
Permit issued — Plumbing
B01069949-S1-PL
11/26/2024
Violation issued (HPD, closed)
I
09/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Interior lighting power
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Mechanical Systems
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Fenestration air leakage
MOHAMED MAHMOUD
09/10/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMED MAHMOUD
09/09/2024
Filed — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-P1
09/09/2024
Filed — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-P2
09/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
09/05/2024
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
09/05/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMED MAHMOUD
07/30/2024
Permit issued — Mechanical Systems
B01069949-I1-GC-CX
07/29/2024
Permit issued — Plumbing
B01069949-S1-PL
07/23/2024
Filed — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-I1
07/23/2024
Filed — Alteration
FILING FOR THE INT. RENO. @ 1ST., 2ND., 3RD, FLOORS; INCLUDES REPLACING FINISHES & LIGHTING AS NEEDED THRU OUT, REPLACE DAMAGED WINDOWS IN EXIST. OPENING, REMOVE AC SYSTEM, CAP/REMOVE BTHRMS @ 1ST FL & NEW BTHRM EXHAUST FAN @3RD FL. (PL JOB#B01069949-S1)
B01069949-S1
03/21/2023
Violation issued (HPD, closed)
A
01/22/2011
Violation issued (HPD, open)
C
05/26/1989
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDESIGN PROCURE BUILD08/29/2025
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC05/27/2025
DOB NOWMechanical SystemsSigned-offDESIGN PROCURE BUILD07/30/2024
DOB NOWPlumbingSigned-offGLENNS PLUMBING SVCS INC07/29/2024
BIS—ISSUEDSION CONSULTING ENGINEERING PC07/24/2023
BISMHISSUEDNEW DAWN HOME IMPROVEMENT11/07/1997
BISOTISSUEDNEW DAWN HOME IMPROVEMENT10/08/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
08/01/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
08/01/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
08/01/2025Post-installed AnchorsMOHAMED MAHMOUDspecial
08/01/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/10/2025Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
07/10/2025Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
07/10/2025HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
07/10/2025Post-installed AnchorsMOHAMED MAHMOUDspecial
09/10/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
09/10/2024Interior lighting powerMOHAMED MAHMOUDenergy_progress
09/10/2024Fenestration areasMOHAMED MAHMOUDenergy_progress
09/10/2024HVAC-R and service water heating system controlsMOHAMED MAHMOUDenergy_progress
09/10/2024FinalMOHAMED MAHMOUDprogress
09/10/2024Mechanical SystemsMOHAMED MAHMOUDspecial
09/10/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
09/10/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
09/10/2024HVAC-R and service water heating equipmentMOHAMED MAHMOUDenergy_progress
09/10/2024Fenestration air leakageMOHAMED MAHMOUDenergy_progress
09/10/2024Fenestration and door U-factor and product ratingsMOHAMED MAHMOUDenergy_progress
09/05/2024Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
09/05/2024Post-installed AnchorsMOHAMED MAHMOUDspecial
09/05/2024Energy Code Compliance InspectionsMOHAMED MAHMOUDprogress
09/05/2024HVAC-R and service water piping design and insulationMOHAMED MAHMOUDenergy_progress
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01069949-S1Request digital key ↗
08/21/2026B01069949-I1Request digital key ↗
08/21/2026B01069949-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION13
02/09/2026322160718Open ↗
02/05/2026322160718Open ↗
02/02/2026322160718Open ↗
Showing 3 of 13 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
02/29/2024340883191Open ↗
11/13/2023340883191Open ↗
09/05/2023340883191Open ↗
▸BISWORK PERMIT APPLICATION1
07/24/2023322160718Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISVERIFY TAX LOT1
04/01/2024322160718Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
08/28/2026B01069949-I1Open ↗
08/28/2026B01069949-I1Open ↗
08/27/2026B01069949-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01069949-S1Open ↗
08/21/2026B01069949-I1Open ↗
08/21/2026B01069949-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B01069949-I1Open ↗
08/27/2026B01069949-P3Open ↗
08/26/2026B01069949-P2Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/17/2023340883191Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/17/2023340883191Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/05/2023340883191Open ↗
05/31/2023322160718Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/20/2023322160718Open ↗
▸Approvals, Objections & Sign-offs4
▸BISSCHEDULE A - OCCUPANCY / USE3
05/25/2023322160718Open ↗
05/23/2023322160718Open ↗
05/10/2023322160718Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/30/2023322160718Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/31/2023322160718Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION3
09/05/2023340883191Open ↗
09/05/2023340883191Open ↗
07/24/2023322160718Open ↗
▸BISEFILING COVER SHEET1
03/09/2023322160718Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/05/2023340883191Open ↗
▸Other Documents5
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/05/2023340883191Open ↗
▸BISDOB NB RECORD1
05/30/2023322160718Open ↗
▸BISPLOT DIAGRAM1
05/30/2023322160718Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
09/05/2023340883191Open ↗
▸BISBPP: NOTES REQUIRED ON PLAN1
09/05/2023340883191Open ↗