I.S.25Q. Adrien Block School
35-01 FRANCIS LEWIS BLVD · Auburndale · BIN 4119139
💬 Discuss this project
1951Year Built
4Stories
W1Building Class
R5BZoning
222,656 sfGross Floor Area
1Units
LL97 Covered14 Open Violations 4 unresolved · 10 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 262,640 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire AlarmEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction48p · 2 filings · 20 docs
Floor 3Under Construction37p · 1 filing · 20 docs
Floor 2Under Construction37p · 1 filing · 20 docs
Floor 1Under Construction37p · 1 filing · 20 docs
Sub-BasementUnder Construction36p · 1 filing · 20 docs
Site & exteriorUnder Construction23p · 3 filings · 20 docs
Filed — no permit issued99p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY4607/23/2026
NY SCHOOL CONSTRUCTION AUTHORITY1603/21/2026
NYC SCHOOL CONSTRUCTION1409/14/2026
NYC SCHOOL CONSTRUCTION AUTH1203/21/2026
SCHOOL CONSTRUCTION AUTHORITY503/22/2026
DEPT OF SCHOOL CONSTRUCTION AUT203/21/2026
NYC SCHOOL CONST AUTHORITY203/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
NEW YORK CITY PUBLIC SCHOOL103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RA1403/21/2026
JMV ASSOCIATES203/21/2026
AK CONSULTING SERVICES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC PLUMBING & HEATINGGeneral Contractor4807/23/2026
ALLY HAZRATElectrical103/21/2026
FALCON ELEC'L CONTR'G CORElectrical103/22/2026
HAZRAT ALLYElectrical103/21/2026
ABC CONSTRUCTION CONT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
UNIVERSAL TESTING AND INS4001402/13/2026
JPC LOGISTICS DBA JPCL EN351211/11/2025
Building Lifecycle
All (194)Filed (27)Permit Issued (36)Violation (60)Inspection (15)Objection (26)Special Inspection (30)
08/28/2026
Objection resolved — Resolved
08/28/2026
Objection resolved — Open
08/27/2026
Objection resolved — Open
08/27/2026
Objection resolved — Open
08/27/2026
Objection resolved — Open
08/14/2026
Objection raised — Other
08/14/2026
Objection raised — Other
08/05/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
08/05/2026
Objection raised — Other
07/31/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment/Materials, New Installation of (2)-Indoor VRF Units, (2)- Outdoor Condensing Units, (2)-ERV Units, associate piping, heating, vibration isolators per Design Plans.
Q01435762-I1
07/31/2026
Filed — Alteration
Selective Removals of Existing HVAC Equipment/Materials, New Installation of (2)-Indoor VRF Units, (2)- Outdoor Condensing Units, (2)-ERV Units, associate piping, heating, vibration isolators per Design Plans.
Q01435762-S1
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
07/31/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/30/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2026
Violation issued (ECB, open)
Construction
07/29/2026
Violation issued (ECB, open)
Construction
07/23/2026
Special inspection requirement — Final
07/23/2026
Special inspection requirement — Mechanical Systems
07/22/2026
Filed — Alteration
SELECTIVE REMOVALS/PROTECTION/DISCARD OF EXISTING: DOORS/FRAMES/WINDOW/SHADES/SHELVING/CEILINGS/GYP BOARD/PORTIONS OF ROOF. NEW WORK; FLASHING/PATCHING ROOF/RCP CEILING/FLOORS/WINDOW SHADES/PATCH/PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01430692-S1
07/22/2026
Permit issued — Construction Fence
Q00522516-I1-FN
07/22/2026
Special inspection requirement — Shutoff dampers
07/22/2026
Special inspection requirement — Interior lighting power
07/22/2026
Special inspection requirement — Lighting controls
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2026
Special inspection requirement — Maintenance information
07/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/22/2026
Special inspection requirement — Electrical motors and elevators
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
07/21/2026
Filed — Alteration
SELECTIVE REMOVALS/PROTECTION/DISCARD OF EXISTING: DOORS/FRAMES/WINDOW/SHADES/SHELVING/CEILINGS/GYP BOARD/PORTIONS OF ROOF. NEW WORK; FLASHING/PATCHING ROOF/RCP CEILING/FLOORS/WINDOW SHADES/PATCH/PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01430692-S2
07/21/2026
Filed — Alteration
SELECTIVE REMOVALS/PROTECTION/DISCARD OF EXISTING: DOORS/FRAMES/WINDOW/SHADES/SHELVING/CEILINGS/GYP BOARD/PORTIONS OF ROOF. NEW WORK; FLASHING/PATCHING ROOF/RCP CEILING/FLOORS/WINDOW SHADES/PATCH/PAINT. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01430692-I1
07/21/2026
Permit issued — Mechanical Systems
Q00533268-S1-MS
07/21/2026
Permit issued — Supported Scaffold
Q00522516-S1-SF
07/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/21/2026
Special inspection requirement — Post-installed Anchors
07/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/14/2026
Special inspection requirement — Final
07/14/2026
Special inspection requirement — Mechanical Systems
07/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/09/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/11/2026
Permit issued — General Construction
Q01269425-I1-GC
05/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/10/2026
Objection resolved — Addressed
04/10/2026
Objection resolved — Addressed
04/02/2026
Special inspection requirement — Post-installed Anchors
03/27/2026
Special inspection requirement — Concrete - Cast-In-Place
03/25/2026
Objection raised — Other
03/25/2026
Objection raised — Other
03/23/2026
Violation issued (FDNY_NOV, closed)
03/20/2026
Filed — Alteration
GC: Exterior Renovation Including Masonry Restoration and Roof Repair. ST: Concrete slab installation. No change in Use, Occupancy, or Egress.
Q01003000-P1
03/17/2026
Special inspection requirement — Masonry
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
03/17/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/17/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/17/2026
Special inspection requirement — Final
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING07/22/2026
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING07/21/2026
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING07/21/2026
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC06/11/2026
DOB NOWSupport of ExcavationPermit IssuedMARIC PLUMBING & HEATING11/04/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING07/23/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING07/23/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING07/23/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING06/16/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING06/16/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING06/16/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING05/28/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING05/28/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING05/28/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/10/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/06/2025
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING08/09/2024
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING03/05/2024
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING03/05/2024
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING03/05/2024
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING06/20/2023
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING06/20/2023
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING06/20/2023
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING07/06/2022
DOB NOWConstruction FencePermit IssuedMARIC PLUMBING & HEATING06/29/2022
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING06/29/2022
DOB NOWSupported ScaffoldPermit IssuedMARIC PLUMBING & HEATING07/16/2021
DOB NOWMechanical SystemsPermit IssuedMARIC PLUMBING & HEATING07/13/2021
DOB NOWConstruction FencePermit IssuedKLE CONSTRUCTION INC07/12/2021
DOB NOWBoiler EquipmentSigned-offMARIC PLBG & HTG INC07/12/2021
BISOTISSUEDMARIC PLUMBING & HEATING07/23/2025
BISMHISSUEDMARIC PLUMBING & HEATING07/23/2025
BISBLISSUEDMARIC PLBG & HTG INC07/23/2025
BISPLISSUEDMARIC PLBG & HTG INC07/23/2025
+ 46 more permits on file
3 projects · most recent 07/31/2026
Heating and Air Conditioning Systems Ventilation Systems Others Refrigeration Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRNU243MAAA 27,300 BTU · Vrf Indoor ×2
ZRUM036GSSO 42,000 BTU · Vrf Outdoor ×2
Ventilation
Renewaire HE07 425 CFM · Erv ×2
02/13/2026Permit IssuedABC CONSTRUCTION CONT INCHeating and Air Conditioning Systems, Others, Refrigeration Systems, Ventilation Systems
Heat / Cool
Daikin RXTA48AAVJU 1,300 CFM · Vrf Outdoor ×6
RXTA36AAVJU 1,120 CFM · Vrf Outdoor ×1
Ventilation
Titus 350RL 1,570 CFM · Exhaust Fan ×8
TMS 610 CFM ×6
TMR 390 CFM · Other ×1
Daikin VAM470GVJU 360 CFM · Erv ×5
VAM300GVJU 200 CFM · Erv ×1
Greenheck SQ-7=VG 900 CFM · Exhaust Fan ×1
Refrigeration
Daikin FXSA48AAVJU 1,330 CFM · Vrf Indoor ×5
FXSA36AAVJU 1,120 CFM · Vrf Indoor ×1
FXSAA48AAVJU 1,300 CFM · Vrf Indoor ×1
VAM470GVJU 360 CFM · Erv ×1
Other
Tutco E-SERIES DH 7 kW · Electric Heater ×5
E-SERIES-DH 7 kW · Electric Heater ×2
Skutt KMT1227-3 21,500 BTU ×2
11/11/2025——Air Conditioning Systems
Cooling
Lg ZRUM0480GSS0 48,000 BTU · Vrf Outdoor ×2
ZRNU123SJSA 12,300 BTU · Vrf Indoor ×1
ZRNU363SRAA 35,000 BTU · Vrf Indoor ×1
ZRNU483TAAA 48,100 BTU · Vrf Indoor ×1
2 projects · most recent 03/20/2026
Water/Sanitary Storm
FiledStatusContractorScope
03/20/2026——Storm, Water/Sanitary
09/17/2025——Water/Sanitary
10 projects · most recent 03/23/2026
General Wiring Lighting
FiledStatusContractorScope
03/23/2026Permit IssuedWILLDAN ELECTRICAL OF NYLighting
01/13/2026Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
10/17/2025CompleteGEMINI ELECTRIC CO., INC.—
09/20/2024CompleteCHARAN ELEC'L ENTERP'S IN—
11/30/2022CompleteK.A.B. ELECTRIC CORPGeneral Wiring
09/17/2021Permit IssuedFALCON ELEC'L CONTR'G CORGeneral Wiring
07/22/2021Permit IssuedFALCON ELEC'L CONTR'G COR—
04/22/2021CompleteINLIGHT ELECTRICAL CORPGeneral Wiring
10/24/2019CompleteDOUGLAS PASKOR INC.—
05/24/2018CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
2 projects · most recent 03/20/2026
Concrete
FiledStatusContractorScope
03/20/2026——Concrete
10/10/2025Permit IssuedMARIC PLUMBING & HEATING1 scope_items
1 project · most recent 05/04/2022
Fence Scaffold
FiledStatusContractorScope
05/04/2022Permit IssuedMARIC PLUMBING & HEATINGFence, Scaffold
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
08/05/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/09/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/19/2025Fail-Final Construction Permit WithdrawalFailView ↗
10/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/15/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/15/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/31/2025Pass-Final PL - UndergroundPassView ↗
07/17/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/13/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
07/31/2026Fire-Resistance Rated Construction—progress
07/31/2026Fire-Resistant Penetrations and Joints—special
07/31/2026Energy Code Compliance Inspections—progress
07/30/2026Fire-Resistant Penetrations and Joints—special
07/30/2026Fire-Resistance Rated Construction—progress
07/23/2026Mechanical Systems—special
07/23/2026Final—progress
07/22/2026Electrical motors and elevators—energy_progress
07/22/2026Fire-Resistant Penetrations and Joints—special
07/22/2026Duct leakage testing, insulation and design—energy_progress
07/22/2026HVAC-R and service water heating equipment—energy_progress
07/22/2026Shutoff dampers—energy_progress
07/22/2026Maintenance information—energy_progress
07/22/2026Interior lighting power—energy_progress
07/22/2026Lighting controls—energy_progress
07/22/2026Energy Code Compliance Inspections—progress
07/21/2026Fire-Resistant Penetrations and Joints—special
07/21/2026Post-installed Anchors—special
07/14/2026Fire-Resistant Penetrations and Joints—special
07/14/2026Fire-Resistance Rated Construction—progress
07/14/2026Mechanical Systems—special
07/14/2026Final—progress
04/02/2026Post-installed Anchors—special
03/27/2026Concrete - Cast-In-Place—special
03/17/2026Post-installed Anchors—special
Latest 25 of 67.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
J.H.S. 025 World Journalism Prep. SchoolEducation—
Project Q01435762 Alteration · Plan Examiner Review · 07/31/2026
Project Q01430692 Alteration · Objections · 07/21/2026
Young Women's Leadership SchoolEducation—
Project Q00754526 Alteration · Approved · 06/10/2022
J.h.s.025,queensEducation—
Project Q00696052 Alteration · Permit Entire · 03/14/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/27/2026Q00533268-P1Request digital key ↗
08/26/2026Q00522516-P1Request digital key ↗
08/26/2026Q00754526-P1Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
12/17/2018440518450Open ↗
▸BISWORK PERMIT APPLICATION1
10/23/2007410013747Open ↗
▸Seals & Professional Certifications49
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/26/2026Q00522516-S1Open ↗
08/26/2026Q00522516-P1Open ↗
08/26/2026Q00522516-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/27/2026Q00533268-P1Open ↗
09/23/2026Q00533268-I1Open ↗
09/01/2026Q00533268-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/27/2026Q00533268-P1Open ↗
09/27/2026Q00533268-P1Open ↗
09/01/2026Q00533268-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/30/2020440518450Open ↗
01/30/2020440518450Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/17/2018440518450Open ↗
▸BISPC FULL REPORT1
10/10/2007410013747Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/17/2018440518450Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/17/2018440518450Open ↗
▸Safety & Tenant Protection4
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026Q00522516-P1Open ↗
08/13/2026Q00522516-I1Open ↗
08/13/2026Q00522516-S1Open ↗
▸BISTENANT PROTECTION PLAN AND NOTES1
12/17/2018440518450Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00533268-S1Open ↗
08/13/2026Q00533268-P1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/10/2007410013747Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/17/2018440518450Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/17/2018440518450Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
01/30/2020440518450Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/17/2018440518450Open ↗
▸BISNYCECC ANALYSIS1
12/17/2018440518450Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/30/2020440518450Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/17/2018440518450Open ↗
12/17/2018440518450Open ↗
▸Approvals, Objections & Sign-offs73
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter29
08/26/2026Q00522516-P1Open ↗
08/17/2026Q01360656-I1Open ↗
08/17/2026Q01360656-S1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)27
08/17/2026Q01360656-I1Open ↗
08/17/2026Q01360656-S1Open ↗
08/16/2026Q01435762-S1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)10
08/16/2026Q01435762-I1Open ↗
08/16/2026Q01435762-S1Open ↗
08/15/2026Q01430692-S2Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/19/2020440518450Open ↗
01/31/2020440518450Open ↗
▸DOB NOWDEP Variance (V5) letter2
08/19/2026Q01269425-I1Open ↗
08/19/2026Q01269425-S1Open ↗
▸BISDESIGN COMM. SIGNOFF: CITY-OWNED PROPERTY (EXTERIOR WORK)1
08/19/2020440518450Open ↗
▸BISDESIGN COMM. APPROVAL: CITY-OWNED PROPERTY (EXTERIOR WORK)1
12/17/2018440518450Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/10/2007410013747Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/30/2020440518450Open ↗
12/17/2018440518450Open ↗
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
05/08/2019440518450Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/17/2018440518450Open ↗
▸Other Documents39
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal30
08/19/2026Q01269425-P5Open ↗
08/19/2026Q01269425-I1Open ↗
08/19/2026Q01269425-S2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProof of Historic Building7
08/17/2026Q01360656-I1Open ↗
08/13/2026Q01269425-I1Open ↗
08/13/2026Q01302471-I1Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
12/17/2018440518450Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00696052-I1Open ↗