← Back
One story retail building
35-01 JUNCTION BOULEVARD
QUEENS · BIN 4043111
💬 Discuss this project
1958Year Built
1Stories
K1Building Class
R6AZoning
5,393 sfGross Floor Area
1Units
3 Open Violations ▸
One story retail building · Owner of record: HILLTOP DUO LLC · 7,468 sf lot · 0.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 2 filings · 20 docs
Floor 11p · 1 filing · 14 docs
Cellar2p · 1 filing · 7 docs
Basement1p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLS1907/08/2026
UNION COURT REALTY303/22/2026
CROSSTOWN MGT. CORP.103/22/2026
UNION COUNT REALTY503/21/2026
BLS REALTY303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/24/2023$2.9M—— → —$538/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEN'S GEN'L CONTRACT CORPGeneral Contractor907/08/2026
BEDROCK PLBG. & HTG., INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSEPH MARTINES PE, PLLC1428705/09/2024
Building Lifecycle
All (67)Filed (11)Permit Issued (7)Signed Off (7)Violation (10)Inspection (2)Special Inspection (30)
06/06/2024
Signed off — Alteration
structural work for pls training center as per plans filed herewith
Q00565423-I1
06/06/2024
Signed off — Alteration
structural modification at PLS retail check cashing store as per plans filed herewith.
Q00462316-I1
05/23/2024
Signed off — Alteration
plumbing modification at pls retail check cashing store as per plans filed herewith
Q00431847-I1
05/23/2024
Signed off — Alteration
MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH
Q00431841-I1
05/23/2024
Signed off — Alteration
mechanical work for PLS training center as per plans filed herewith
Q00565520-I1
05/23/2024
Signed off — Alteration
PLUMBING WORK FOR PLS TRAINING CENTER AS PER PLANS FILED HEREWITH
Q00565471-I1
05/21/2024
Signed off — Alteration
INTERIOR RENOVATION FOR PLS TRAINING CENTER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00565241-I1
05/09/2024
Filed — Alteration
structural work for pls training center as per plans filed herewith
Q00565423-P1
05/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
JOSEPH MARTINES
05/09/2024
Special inspection requirement — Final
JOSEPH MARTINES
05/09/2024
Special inspection requirement — Structural Steel - Welding
JOSEPH MARTINES
05/09/2024
Special inspection requirement — Post-installed Anchors
JOSEPH MARTINES
05/09/2024
Special inspection requirement — Structural Steel - Details
JOSEPH MARTINES
05/09/2024
Special inspection requirement — Concrete - Cast-In-Place
JOSEPH MARTINES
04/30/2024
Filed — Alteration
INTERIOR RENOVATION FOR PLS TRAINING CENTER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00565241-P1
03/26/2024
Special inspection requirement — Final
JOSEPH MARTINES
03/26/2024
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH MARTINES
03/26/2024
Special inspection requirement — HVAC and service water heating system controls
JOSEPH MARTINES
03/26/2024
Special inspection requirement — Mechanical Systems
JOSEPH MARTINES
03/26/2024
Special inspection requirement — HVAC insulation and sealing
JOSEPH MARTINES
03/26/2024
Special inspection requirement — HVAC and service water heating equipment
JOSEPH MARTINES
03/22/2024
Filed — Alteration
MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH
Q00431841-P1
07/31/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/12/2022
Filed — Alteration
plumbing modification at pls retail check cashing store as per plans filed herewith
Q00431847-P1
10/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/22/2021
Permit issued — Plumbing
Q00565471-I1-PL
09/22/2021
Special inspection requirement — Structural Steel - Welding
09/22/2021
Special inspection requirement — Concrete - Cast-In-Place
09/22/2021
Special inspection requirement — Post-installed Anchors
09/22/2021
Special inspection requirement — Structural Steel - High Strength Bolting
09/22/2021
Special inspection requirement — Structural Steel - Details
JOSEPH MARTINES
09/22/2021
Special inspection requirement — Final
JOSEPH MARTINES
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/22/2021
Special inspection requirement — Final
JOSEPH MARTINES
09/22/2021
Special inspection requirement — Fire-Resistance Rated Construction
09/02/2021
Permit issued — Mechanical Systems
Q00565520-I1-MS
09/01/2021
Permit issued — General Construction
Q00565241-I1-GC
09/01/2021
Permit issued — Structural
Q00565423-I1-ST
08/24/2021
Filed — Alteration
structural work for pls training center as per plans filed herewith
Q00565423-I1
08/24/2021
Filed — Alteration
mechanical work for PLS training center as per plans filed herewith
Q00565520-I1
08/24/2021
Filed — Alteration
PLUMBING WORK FOR PLS TRAINING CENTER AS PER PLANS FILED HEREWITH
Q00565471-I1
08/24/2021
Filed — Alteration
INTERIOR RENOVATION FOR PLS TRAINING CENTER AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
Q00565241-I1
07/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH MARTINES
07/28/2021
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH MARTINES
07/28/2021
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH MARTINES
07/28/2021
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH MARTINES
07/27/2021
Special inspection requirement — Mechanical Systems
JOSEPH MARTINES
07/27/2021
Special inspection requirement — Final
JOSEPH MARTINES
05/12/2021
Permit issued — Structural
Q00462316-I1-ST
05/10/2021
Permit issued — Mechanical Systems
Q00431841-I1-MS
05/07/2021
Filed — Alteration
structural modification at PLS retail check cashing store as per plans filed herewith.
Q00462316-I1
04/23/2021
Special inspection requirement — Structural Wood Frame
JOSEPH MARTINES
03/03/2021
Permit issued — Plumbing
Q00431847-I1-PL
01/28/2021
Special inspection requirement — Structural Steel - Details
JOSEPH MARTINES
01/28/2021
Special inspection requirement — Structural Steel - Welding
JOSEPH MARTINES
01/19/2021
Filed — Alteration
plumbing modification at pls retail check cashing store as per plans filed herewith
Q00431847-I1
01/19/2021
Filed — Alteration
MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH
Q00431841-I1
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC09/22/2021
DOB NOWMechanical SystemsSigned-offBEN'S GEN'L CONTRACT CORP09/02/2021
DOB NOWGeneral ConstructionSigned-offBEN'S GEN'L CONTRACT CORP09/01/2021
DOB NOWStructuralSigned-offBEN'S GEN'L CONTRACT CORP09/01/2021
DOB NOWStructuralSigned-offBEN'S GEN'L CONTRACT CORP05/12/2021
DOB NOWMechanical SystemsSigned-offBEN'S GEN'L CONTRACT CORP05/10/2021
DOB NOWPlumbingSigned-offBEDROCK PLBG. & HTG., INC03/03/2021
BISOTISSUEDBEN'S GEN'L CONTRACT CORP01/29/2021
BISMHISSUEDNICE HSY ENTERPRISE INC02/27/2014
BISPLISSUEDPETER PLUMBING ASSOC. INC.05/18/2011
BISBLISSUEDPETER PLUMBING ASSOC. INC.05/18/2011
BISBLISSUEDPETER PLUMBING ASSOC. INC.04/07/2010
BISPLISSUEDPETER PLUMBING ASSOC. INC.04/07/2010
BISOTISSUEDCUBE PLUS INC05/17/2007
BIS—ISSUEDSUN CONSTRUCTION & CO CORP01/08/2007
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/03/2007
BISOTISSUEDSUN CONSTRUCTION & CO CORP12/20/2006
BISEQISSUEDSUN CONSTRUCTION & CO CORP12/20/2006
BISPLISSUEDFULTON PLBG & HTG CORP11/20/2003
BISMHISSUEDJ.I. CONSTRUCTION05/17/1999
BIS—ISSUEDNORTH SHORE NEON SIGN INC.05/16/1994
BISOTISSUEDNORTH SHORE NEON SIGN INC.05/09/1994
BISFPISSUEDIDEAL FIRE CONTROL05/09/1994
BISMHISSUEDARTHUR S.PAVENTY DEV.CORP05/02/1994
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/31/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/09/2024Structural Steel - High Strength BoltingJOSEPH MARTINESspecial
05/09/2024FinalJOSEPH MARTINESprogress
05/09/2024Structural Steel - WeldingJOSEPH MARTINESspecial
05/09/2024Post-installed AnchorsJOSEPH MARTINESspecial
05/09/2024Structural Steel - DetailsJOSEPH MARTINESspecial
05/09/2024Concrete - Cast-In-PlaceJOSEPH MARTINESspecial
03/26/2024FinalJOSEPH MARTINESprogress
03/26/2024Energy Code Compliance InspectionsJOSEPH MARTINESprogress
03/26/2024HVAC and service water heating system controls JOSEPH MARTINESenergy_progress
03/26/2024Mechanical SystemsJOSEPH MARTINESspecial
03/26/2024HVAC insulation and sealing JOSEPH MARTINESenergy_progress
03/26/2024HVAC and service water heating equipment JOSEPH MARTINESenergy_progress
09/22/2021Structural Steel - Welding—special
09/22/2021Concrete - Cast-In-Place—special
09/22/2021Post-installed Anchors—special
09/22/2021Structural Steel - High Strength Bolting—special
09/22/2021Structural Steel - DetailsJOSEPH MARTINESspecial
09/22/2021FinalJOSEPH MARTINESprogress
09/22/2021Fire-Resistant Penetrations and Joints—special
09/22/2021FinalJOSEPH MARTINESprogress
09/22/2021Fire-Resistance Rated Construction—progress
07/28/2021HVAC-R and service water piping design and insulationJOSEPH MARTINESenergy_progress
07/28/2021HVAC-R and service water heating equipmentJOSEPH MARTINESenergy_progress
07/28/2021HVAC-R and service water heating system controlsJOSEPH MARTINESenergy_progress
07/28/2021Energy Code Compliance InspectionsJOSEPH MARTINESprogress
Latest 25 of 31.
▾Documents — 94 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch6
08/27/2026Q00565471-I1Request digital key ↗
08/27/2026Q00565520-I1Request digital key ↗
08/22/2026Q00565241-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/23/2026Q00431841-P1Request digital key ↗
08/23/2026Q00431841-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026Q00431847-P1Request digital key ↗
08/26/2026Q00431847-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00462316-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION4
12/16/2020440655220Open ↗
04/24/2014420941869Open ↗
04/11/2014420941869Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
01/29/2021440655220Open ↗
03/04/2014420941869Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026Q00565520-I1Open ↗
09/01/2026Q00565520-I1Open ↗
09/01/2026Q00565520-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026Q00462316-I1Open ↗
08/26/2026Q00431847-P1Open ↗
08/26/2026Q00431847-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q00565520-I1Open ↗
08/30/2026Q00462316-I1Open ↗
08/30/2026Q00462316-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/16/2020440655220Open ↗
03/04/2014420941869Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
04/24/2014420941869Open ↗
03/04/2014420941869Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/22/2014420941869Open ↗
03/04/2014420941869Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/16/2020440655220Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/16/2020440655220Open ↗
▸Trade Schedules & Equipment4
▸BISEQUIPMENT USE APPLICATION/PERMIT3
04/28/2014420941869Open ↗
04/28/2014420941869Open ↗
04/28/2014420941869Open ↗
▸BISEQUIPMENT USE PERMITS1
04/30/2014420941869Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/27/2026Q00462316-I1Open ↗
08/26/2026Q00431847-I1Open ↗
08/26/2026Q00431847-P1Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/16/2020440655220Open ↗
03/04/2014420941869Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/22/2014420941869Open ↗
03/04/2014420941869Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/16/2020440655220Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/22/2014420941869Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/16/2020440655220Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00565520-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/14/2021440655220Open ↗
12/16/2020440655220Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
03/04/2014420941869Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/28/2014420941869Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
12/16/2020440655220Open ↗
04/24/2014420941869Open ↗
03/04/2014420941869Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
04/28/2014420941869Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/04/2014420941869Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/16/2020440655220Open ↗