← Back
BuildNYC
Gas or electric utility
35-08 VERNON BOULEVARD
QUEENS · BIN 4541762
💬 Discuss this project
0Year Built
—Stories
U2Building Class
M1-1Zoning
0 sfGross Floor Area
0Units
1 Active Violation ▸FDNY Report ↗
Gas or electric utility · Owner of record: SE Ravenswood Trust C · 375,651 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Consolidated Edison1 filing · 5 docs
Site & exteriorConsolidated Edison14p · 4 filings · 17 docs
Filed — no permit issuedConsolidated Edison20p · 2 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Consolidated Edison Company of New York3210/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Consolidated Edison Company of New York308/03/2026
Bga402/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Consolidated Edison Company of New York603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D'Onofrio General ContractorsGeneral Contractor603/21/2026
Rimani GroupGeneral Contractor303/21/2026
SKH MechanicalFire Protection207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106708/03/2026
Building Lifecycle
All (62)Filed (7)Permit Issued (9)Signed Off (1)Violation (5)Inspection (2)Objection (8)Special Inspection (30)
09/03/2026
Objection resolved — Addressed
09/03/2026
Objection resolved — Addressed
09/03/2026
Objection resolved — Addressed
08/14/2026
Objection raised — Other
08/14/2026
Objection raised — Admin
08/14/2026
Objection raised — Other
08/03/2026
Filed — Alteration
INSTALL NEW CONCRETE FOUNDATIONS FOR EQUIPMENT AT CON EDISON'S RAINEY SUBSTATION: GIS EQUIPMENT, FEEDER TERMINATION, DISCONNECT SWITCH AND BUS SUPPORTS.
Q01425086-I1
07/16/2026
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Final
GEORGE GHEBRYAL
07/01/2026
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
03/12/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/17/2024
Permit issued — General Construction
Q01085533-I1-FO
08/19/2024
Filed — Alteration
Q01085533-I1
07/24/2024
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
07/24/2024
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
03/11/2024
Permit issued — General Construction
Q00820791-I1-GC
07/13/2023
Signed off — Alteration
INSTALL DELUGE SYSTEMS FOR TRANSFORMER #5W AND PHASE ANGLE REGULATOR #5W AT CON EDISON'S RAINEY SUBSTATION.
Q00705427-I1
05/05/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/02/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/16/2023
Permit issued — Foundation
Q00820791-I1-GC
03/16/2023
Permit issued — Foundation
Q00820791-I1-FO
03/15/2023
Permit issued — Structural
Q00615875-I1-GC-CX
02/02/2023
Filed — Alteration
Q00820791-I1
11/25/2022
Permit issued — Sprinklers
Q00705427-I1-EW-SP
10/25/2022
Permit issued — Sprinklers
Q00705427-I1-EW-SP
08/01/2022
Objection raised — Structural
08/01/2022
Objection resolved — Addressed
08/01/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
08/01/2022
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
GEORGE GHEBRYAL
07/26/2022
Filed — Alteration
INSTALL NEW CONCRETE FOUNDATIONS FOR EQUIPMENT AT CON EDISON'S RAINEY SUBSTATION: GIS EQUIPMENT, FEEDER TERMINATION, DISCONNECT SWITCH AND BUS SUPPORTS.
Q00771026-I1
07/12/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Subgrade Inspections
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Deep Foundation Elements
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/08/2022
Special inspection requirement — Post-installed Anchors
GEORGE GHEBRYAL
07/07/2022
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
07/07/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
04/13/2022
Filed — Alteration
INSTALL DELUGE SYSTEMS FOR TRANSFORMER #5W AND PHASE ANGLE REGULATOR #5W AT CON EDISON'S RAINEY SUBSTATION.
Q00705427-I1
04/11/2022
Permit issued — Structural
Q00615875-I1-GC-CX
03/24/2022
Special inspection requirement — Sprinkler Systems
GEORGE GHEBRYAL
01/27/2022
Filed — Alteration
Q00663133-I1
12/13/2021
Permit issued — General Construction
Q00615875-I1-GC-CX
11/05/2021
Filed — Alteration
Q00615875-I1
10/29/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MARK STIER
10/21/2021
Special inspection requirement — Energy Code Compliance Inspections
GEORGE GHEBRYAL
10/21/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
GEORGE GHEBRYAL
11/14/2018
Violation issued (FDNY_NOV, closed)
02/16/2017
Violation issued (FDNY_NOV, closed)
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRimani Group09/17/2024
DOB NOWGeneral ConstructionPermit IssuedD'Onofrio General Contracting03/11/2024
DOB NOWFoundationPermit IssuedD'Onofrio General Contracting03/16/2023
DOB NOWFoundationPermit IssuedD'Onofrio General Contracting03/16/2023
DOB NOWStructuralPermit IssuedD'Onofrio General Contracting03/15/2023
DOB NOWSprinklersSigned-offSKH Mechanical11/25/2022
DOB NOWSprinklersSigned-offSKH Mechanical10/25/2022
DOB NOWStructuralPermit IssuedD'Onofrio General Contracting04/11/2022
DOB NOWGeneral ConstructionPermit IssuedD'Onofrio General Contracting12/13/2021
2 projects · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026——2 scope_items
07/26/2022——1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/02/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/16/2026Deep Foundation ElementsGEORGE GHEBRYALspecial
07/01/2026Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
07/01/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/01/2026Subgrade InspectionsGEORGE GHEBRYALspecial
07/01/2026Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
07/01/2026FinalGEORGE GHEBRYALprogress
07/01/2026Footing and FoundationGEORGE GHEBRYALprogress
07/24/2024Subgrade InspectionsGEORGE GHEBRYALspecial
07/24/2024Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
07/24/2024Post-installed AnchorsGEORGE GHEBRYALspecial
07/24/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/24/2024Footing and FoundationGEORGE GHEBRYALprogress
07/24/2024FinalGEORGE GHEBRYALprogress
07/24/2024Deep Foundation ElementsGEORGE GHEBRYALspecial
07/24/2024Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
08/01/2022Subsurface Investigations (Borings/Test Pits)MARK STIERspecial
08/01/2022Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)GEORGE GHEBRYALspecial
07/12/2022Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
07/08/2022Subgrade InspectionsGEORGE GHEBRYALspecial
07/08/2022Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
07/08/2022Deep Foundation ElementsGEORGE GHEBRYALspecial
07/08/2022Subsurface Conditions – Fill Placement & In-Place DensityGEORGE GHEBRYALspecial
07/08/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/08/2022Post-installed AnchorsGEORGE GHEBRYALspecial
07/07/2022Footing and FoundationGEORGE GHEBRYALprogress
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Consolidated EdisonIndustrial / WarehouseFloor 1
Project Q01425086 Alteration · Approved · 08/03/2026
Project Q01085533 Alteration · Permit Issued · 08/19/2024
Project Q00771026 Alteration · Permit Entire · 07/26/2022
Project Q00705427 Alteration · LOC Issued · 04/13/2022
Project Q00663133 Alteration · On Hold – Administrative Action · 01/27/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00615875-I1Request digital key ↗
08/26/2026Q00663133-I1Request digital key ↗
08/26/2026Q00705427-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications31
▸DOB NOWSpecial Inspector Seal & Signature17
09/17/2026Q00615875-I1Open ↗
09/17/2026Q00615875-I1Open ↗
09/17/2026Q00615875-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/17/2026Q00615875-I1Open ↗
09/17/2026Q00615875-I1Open ↗
09/02/2026Q01425086-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/27/2026Q00615875-I1Open ↗
08/26/2026Q00663133-I1Open ↗
08/26/2026Q00771026-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/27/2026Q00615875-I1Open ↗
08/26/2026Q00663133-I1Open ↗
08/26/2026Q00771026-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports11
▸DOB NOWTR4 Test Report and Plot Diagram4
08/13/2026Q00615875-I1Open ↗
08/13/2026Q00771026-I1Open ↗
08/13/2026Q00663133-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT4
08/13/2026Q00771026-I1Open ↗
08/13/2026Q00615875-I1Open ↗
08/13/2026Q00820791-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram3
08/13/2026Q00771026-I1Open ↗
08/13/2026Q00663133-I1Open ↗
08/13/2026Q00615875-I1Open ↗