← Back
BuildNYC
Cape Cod
35-12 CORPORAL STONE STREET
QUEENS · Bayside · BIN 4136518
💬 Discuss this project
1945Year Built
1.67Stories
A0Building Class
R3XZoning
1,286 sfGross Floor Area
1Units
Cape Cod · 4,200 sf lot · 0.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction9p · 1 filing · 20 docs
AtticUnder Construction10p · 1 filing · 20 docs
Floor 2Under Construction17p · 1 filing · 20 docs
Floor 1Under Construction16p · 1 filing · 20 docs
CellarUnder Construction17p · 1 filing · 20 docs
Site & exteriorFence installationUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3512 Stone1309/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2025$1.2M—Private party → 3512 Stone$918/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mehdi Ghazi, P.E507/27/2026
Mei Architect111/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Mei Architect403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NTF ManagementGeneral Contractor307/08/2026
NTF ManagementScaffold104/09/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Mehdi Ghazi, P.E7129507/27/2026
Triangle Inspection & Tes7495207/27/2026
Building Lifecycle
All (50)Filed (6)Permit Issued (5)Inspection (1)Objection (8)Special Inspection (30)
07/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
07/28/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MEHDI GHAZI
07/28/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
07/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
07/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
07/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
07/27/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01310620-P1
04/23/2026
Permit issued — Foundation
Q01310620-S1-FO-EA
04/21/2026
Permit issued — Mechanical Systems
Q01310620-I1-GC-CX
04/20/2026
Permit issued — Plumbing
Q01310620-S3-PL
04/17/2026
Permit issued — Structural
Q01310620-S2-ST
04/16/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01310620-S3
03/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01310620-S1
03/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01310620-S2
03/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
03/13/2026
Objection raised — Scope
03/13/2026
Objection resolved — Addressed
03/03/2026
Special inspection requirement — Structural Steel - Details
MEHDI GHAZI
03/03/2026
Special inspection requirement — Masonry
MEHDI GHAZI
03/03/2026
Special inspection requirement — Structural Steel - Welding
MEHDI GHAZI
03/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MEHDI GHAZI
03/03/2026
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
03/02/2026
Special inspection requirement — Subgrade Inspections
MEHDI GHAZI
03/02/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MEHDI GHAZI
03/02/2026
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
03/02/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/05/2026
Special inspection requirement — Final
MEHDI GHAZI
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
02/05/2026
Special inspection requirement — Final
MEHDI GHAZI
02/05/2026
Special inspection requirement — Footing and Foundation
MEHDI GHAZI
02/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
01/23/2026
Permit issued — Construction Fence
Q01310635-I1-FN
01/19/2026
Filed — Alteration
Q01310635-I1
01/08/2026
Objection resolved — Addressed
01/08/2026
Objection resolved — Addressed
01/08/2026
Objection resolved — Addressed
12/12/2025
Objection raised — Plumbing
12/12/2025
Objection raised — Zoning
12/12/2025
Objection raised — Zoning
11/14/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
INSTALLATION OF SOE AND FOUNDATION AS PER THE PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q01310620-I1
10/29/2025
Special inspection requirement — Electric vehicle service equipment requirements
MEHDI GHAZI
10/29/2025
Special inspection requirement — Lighting controls
MEHDI GHAZI
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
10/29/2025
Special inspection requirement — Protection of exposed foundation insulation
MEHDI GHAZI
10/29/2025
Special inspection requirement — Metering
MEHDI GHAZI
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
10/29/2025
Special inspection requirement — Air barrier — testing
MEHDI GHAZI
10/29/2025
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedNTF Management04/23/2026
DOB NOWMechanical SystemsPermit IssuedNTF Management04/21/2026
DOB NOWPlumbingPermit IssuedWasoff Plumbing & Utility Co04/20/2026
DOB NOWStructuralPermit IssuedNTF Management04/17/2026
DOB NOWConstruction FencePermit IssuedNTF Management01/23/2026
1 project · most recent 07/27/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Permit IssuedNTF ManagementHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NLHZ 54,000 BTU · Heat Pump Outdoor ×2
MXZ-SM60NL 64,500 BTU · Heat Pump Outdoor ×2
1 project · most recent 07/27/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedWasoff Plumbing & Utility CoStorm, Water/Sanitary
1 project · most recent 09/09/2026
General Wiring
FiledStatusContractorScope
09/09/2026Permit IssuedKJK ElectricGeneral Wiring
1 project · most recent 07/27/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
07/27/2026Permit IssuedNTF ManagementSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/31/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/28/2026Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
07/28/2026Energy Code Compliance InspectionsMEHDI GHAZIprogress
07/28/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMEHDI GHAZIspecial
07/28/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
07/28/2026HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
07/28/2026HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
07/28/2026HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
03/24/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
03/03/2026Structural Steel - DetailsMEHDI GHAZIspecial
03/03/2026MasonryMEHDI GHAZIspecial
03/03/2026Structural Steel - WeldingMEHDI GHAZIspecial
03/03/2026Structural Steel - High Strength BoltingMEHDI GHAZIspecial
03/03/2026Structural Wood FrameMEHDI GHAZIprogress
03/02/2026Subgrade InspectionsMEHDI GHAZIspecial
03/02/2026Excavations - Sheeting, Shoring, and BracingMEHDI GHAZIspecial
03/02/2026Concrete - Cast-In-PlaceMEHDI GHAZIspecial
03/02/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/05/2026FinalMEHDI GHAZIprogress
02/05/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
02/05/2026FinalMEHDI GHAZIprogress
02/05/2026Footing and FoundationMEHDI GHAZIprogress
02/05/2026Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
10/29/2025Electric vehicle service equipment requirementsMEHDI GHAZIenergy_progress
10/29/2025Lighting controlsMEHDI GHAZIenergy_progress
10/29/2025HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
Latest 25 of 47.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026Q01310635-I1Request digital key ↗
08/17/2026Q01310620-P1Request digital key ↗
08/17/2026Q01310620-S3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01310620-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01310620-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q01310620-S1Open ↗
09/02/2026Q01310620-S1Open ↗
09/01/2026Q01310620-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026Q01310635-I1Open ↗
08/17/2026Q01310620-P1Open ↗
08/17/2026Q01310620-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026Q01310620-S1Open ↗
09/01/2026Q01310620-S2Open ↗
08/27/2026Q01310620-S3Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026Q01310620-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01310620-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026Q01310620-P1Open ↗
08/17/2026Q01310620-S3Open ↗
08/13/2026Q01310620-S2Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q01310620-S1Open ↗
08/13/2026Q01310620-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01310620-I1Open ↗
08/13/2026Q01310620-S1Open ↗
▸Other Documents4
▸DOB NOWSite Survey: Initial1
08/13/2026Q01310620-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01310620-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01310620-S1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01310620-I1Open ↗