Television studio
Wildflower Studios
35-15 19TH AVENUE · BIN 4623202
💬 Discuss this project
2021Year Built
3.25Stories
J6Building Class
M3-1Zoning
571,915 sfGross Floor Area
1Units
0 Active Violations
Television studio · Owner of record: WF Industrial IV · 215,595 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofWildflower Studios445p · 6 filings · 20 docs
PenthouseWildflower Studios1p · 1 filing · 2 docs
Floor 4Wildflower Studios432p · 9 filings · 20 docs
Floor 3Wildflower Studios427p · 9 filings · 20 docs
Floor 2Wildflower StudiosUnder Construction447p · 13 filings · 20 docs
Floor 1Wildflower StudiosUnder Construction505p · 24 filings · 20 docs
MezzanineWildflower Studios425p · 5 filings · 20 docs
BasementWildflower Studios59p · 11 filings · 20 docs
Sub-BasementWildflower Studios389p · 9 filings · 20 docs
Site & exteriorWildflower Studios11p · 5 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Wildflower7907/08/2026
WF Industrial IV5307/08/2026
Leeds Builders Group103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2020$71.6M—Steinway → WF INDUSTRIAL IV LLC$181/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Interface Engineering409/09/2026
Asli Erdem209/09/2026
Three Studio Architecture405/15/2026
Altieriseborwieber1011/26/2025
Lam & Lam Designs607/10/2025
Thornton Tomasetti205/24/2024
Sherwood Design Engineers205/07/2024
Sotir Associates102/06/2024
Universal Builders Supply511/09/2023
Bohler Engineering NY608/24/2023
Buckman Engineering106/26/2023
Howard Shapiro & Associates111/30/2022
Seal Engineering210/03/2022
JMG Consultants101/19/2022
E&G Development101/14/2021
Ccpe306/25/2020
Age Engineering204/17/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen2403/21/2026
Bohler Engineering1003/21/2026
Eurocelt Expediting1003/21/2026
JMG Consultants203/21/2026
Russo Development Enterprises203/21/2026
Howard I Shapiro Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Leeding Builders GroupScaffold1207/08/2026
Rael Automatic Sprinkler CoFire Protection1007/08/2026
Ocean Pacific Interiors *General Contractor804/09/2026
Russo Development EnterprisesScaffold707/08/2026
Leeding Builders GroupGeneral Contractor707/08/2026
Universal Builders SupplyScaffold707/08/2026
HDK ConstructionScaffold307/08/2026
Casino Plumbing & HeatingFire Protection307/08/2026
DonatoPlumbing307/08/2026
Donato Plumbing GroupPlumbing207/08/2026
W & W GlassScaffold107/08/2026
Proto P & H ServicesPlumbing107/08/2026
Park PlusGeneral Contractor107/08/2026
Forward MechanicalPlumbing107/08/2026
Forward Mechanicalspecialty_contractor107/08/2026
Roma ElectricElectrical103/22/2026
Agir Electrical Ltd D/B/AElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Atlas ATC Engineering8011909/09/2026
Atlantic Engineeringlabor13812111/26/2025
Building Lifecycle
All (262)Filed (53)Permit Issued (56)Signed Off (22)Violation (21)Inspection (10)Objection (70)Special Inspection (30)
09/09/2026
Filed — Alteration
General construction modifications to Floors 1 and 2 as per plans filed herewith. No change in use, egress, or occupancy.
Q01308994-P1
09/09/2026
Filed — Alteration
Plumbing modifications to floors 1 and 2 as per plans filed herewith. No change in use, egress, or occupancy.
Q01309210-P1
08/19/2026
Signed off — Alteration
FILING HEREWITH SPRINKLER AND STANDPIPE SYSTEM IN CONJUNCTION WITH NEW BUILDING.
Q00396446-I1
05/15/2026
Filed — No Work
Q01402936-I1
05/14/2026
Filed — No Work
Q01402543-I1
05/06/2026
Objection resolved — Addressed
05/05/2026
Objection raised — Other
04/29/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Other
04/13/2026
Filed — No Work
Q01377490-P1
04/06/2026
Objection resolved — Addressed
04/04/2026
Objection raised — Admin
03/31/2026
Filed — No Work
Q01377490-I1
02/19/2026
Permit issued — Mechanical Systems
Q01309208-I1-MS
02/19/2026
Permit issued — General Construction
Q01308994-I1-GC
02/06/2026
Signed off — Alteration
Q00892681-I1
01/09/2026
Permit issued — Plumbing
Q01309210-I1-PL
01/06/2026
Permit issued — Mechanical Systems
Q01309208-I1-MS
01/06/2026
Permit issued — General Construction
Q01308994-I1-GC
12/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher O'Malley
12/16/2025
Special inspection requirement — Shutoff dampers
Christopher O'Malley
12/16/2025
Special inspection requirement — Electrical motors and elevators
Christopher O'Malley
12/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Christopher O'Malley
12/16/2025
Special inspection requirement — Final
Christopher O'Malley
12/16/2025
Special inspection requirement — Mechanical Systems
Christopher O'Malley
12/16/2025
Special inspection requirement — Interior lighting power
Christopher O'Malley
12/16/2025
Special inspection requirement — Exterior lighting power
Christopher O'Malley
12/16/2025
Special inspection requirement — Metering
Christopher O'Malley
12/16/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Christopher O'Malley
12/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
12/16/2025
Special inspection requirement — Heating Systems
Christopher O'Malley
12/16/2025
Special inspection requirement — Maintenance information
Christopher O'Malley
12/16/2025
Special inspection requirement — Lighting controls
Christopher O'Malley
12/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher O'Malley
12/16/2025
Special inspection requirement — Smoke Control Systems Testing
Christopher O'Malley
12/05/2025
Permit issued — General Construction
Q01308994-I1-GC
12/05/2025
Permit issued — Mechanical Systems
Q01309208-I1-MS
11/26/2025
Filed — Alteration
Filing to supersede previous mechanical application #Q00620613-I1. Mechanical alterations in conjunction with NB job #420667549
Q00960596-P3
11/10/2025
Special inspection requirement — Electrical motors and elevators
Christopher O'Malley
11/10/2025
Special inspection requirement — HVAC-R and service water heating system controls
Christopher O'Malley
11/10/2025
Special inspection requirement — Duct leakage testing, insulation and design
Christopher O'Malley
11/10/2025
Special inspection requirement — Lighting controls
Christopher O'Malley
11/10/2025
Special inspection requirement — HVAC-R and service water heating equipment
Christopher O'Malley
11/10/2025
Special inspection requirement — Mechanical Systems
Christopher O'Malley
11/10/2025
Special inspection requirement — Smoke Control Systems Testing
Christopher O'Malley
11/10/2025
Special inspection requirement — Heating Systems
Christopher O'Malley
11/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
11/10/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
Christopher O'Malley
11/10/2025
Special inspection requirement — Shutoff dampers
Christopher O'Malley
11/10/2025
Special inspection requirement — Final
Christopher O'Malley
11/10/2025
Special inspection requirement — Exterior lighting power
Christopher O'Malley
10/31/2025
Filed — Alteration
General construction modifications to Floors 1 and 2 as per plans filed herewith. No change in use, egress, or occupancy.
Q01308994-I1
10/30/2025
Filed — Alteration
Q01309208-I1
10/30/2025
Filed — Alteration
Plumbing modifications to floors 1 and 2 as per plans filed herewith. No change in use, egress, or occupancy.
Q01309210-I1
10/30/2025
Filed — Alteration
Q01309212-I1
09/12/2025
Signed off — Alteration
Q00998729-I1
09/03/2025
Signed off — Alteration
Installation of plumbing and associated fixtures
Q00633564-I1
07/10/2025
Filed — Alteration
Installation of plumbing and associated fixtures
Q00633564-P5
07/01/2025
Signed off — Alteration
Q01043993-I1
Latest 60 of 262 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedOcean Pacific Interiors *02/19/2026
DOB NOWGeneral ConstructionPermit IssuedOcean Pacific Interiors *02/19/2026
DOB NOWPlumbingPermit IssuedProto P & H Services01/09/2026
DOB NOWMechanical SystemsPermit IssuedOcean Pacific Interiors *01/06/2026
DOB NOWGeneral ConstructionPermit IssuedOcean Pacific Interiors *01/06/2026
DOB NOWGeneral ConstructionPermit IssuedOcean Pacific Interiors *12/05/2025
DOB NOWMechanical SystemsPermit IssuedOcean Pacific Interiors *12/05/2025
DOB NOWPlumbingSigned-offDonato Plumbing Group06/17/2025
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co02/03/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co02/03/2025
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co01/28/2025
DOB NOWCurb CutSigned-offLeeding Builders Group07/16/2024
DOB NOWCurb CutSigned-offLeeding Builders Group07/16/2024
DOB NOWMechanical SystemsPermit IssuedForward Mechanical07/10/2024
DOB NOWGeneral ConstructionSigned-offLeeding Builders Group07/05/2024
DOB NOWGeneral ConstructionSigned-offLeeding Builders Group04/17/2024
DOB NOWConstruction FenceSigned-offLeeding Builders Group04/03/2024
DOB NOWPlumbingSigned-offDonato Plumbing Group03/26/2024
DOB NOWStructuralSigned-offLeeding Builders Group03/22/2024
DOB NOWBoiler EquipmentSigned-offRanshaw Plumbing & Heating03/08/2024
DOB NOWGeneral ConstructionSigned-offPark Plus03/04/2024
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co01/22/2024
DOB NOWSidewalk ShedSigned-offUniversal Build Supp01/11/2024
DOB NOWPlumbingSigned-offDonato11/29/2023
DOB NOWBoiler EquipmentSigned-offForward Heating11/13/2023
DOB NOWSupported ScaffoldSigned-offUniversal Build Supp11/13/2023
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co10/12/2023
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co10/12/2023
DOB NOWGeneral ConstructionSigned-offLeeding Builders Group07/26/2023
DOB NOWSupported ScaffoldSigned-offHDK Construction06/08/2023
DOB NOWSupported ScaffoldSigned-offHDK Construction04/19/2023
DOB NOWConstruction FenceSigned-offLeeding Builders Group03/31/2023
DOB NOWProtection and Mechanical MethodsSigned-offUniversal Build Supp02/14/2023
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co01/24/2023
DOB NOWSidewalk ShedSigned-offUniversal Build Supp01/13/2023
DOB NOWPlumbingSigned-offDonato12/13/2022
DOB NOWProtection and Mechanical MethodsSigned-offW W Glass11/30/2022
DOB NOWProtection and Mechanical MethodsSigned-offUniversal Build Supp11/09/2022
DOB NOWSprinklersSigned-offRael Automatic Sprinkler Co10/14/2022
DOB NOWStandpipeSigned-offRael Automatic Sprinkler Co10/13/2022
+ 35 more permits on file
1 project · most recent 11/26/2025
Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/26/2025Permit IssuedForward MechanicalRefrigeration Systems, Ventilation Systems
Ventilation
Trane CSAA030 12,000 CFM · Ahu ×24
30KSFEFCHW-2 30,000 CFM · Ahu ×20
30KSFEFCHW 30,000 CFM · Ahu ×2
CSAA057 25,000 CFM · Ahu ×2
Stulz CW060 9,000 CFM · Ahu ×4
Daikin CAH050GDGC 25,000 CFM · Makeup Air ×2
Swegon PROUNIT - 35 6,500 CFM · Erv ×2
Refrigeration
York ACRB4504EUAALUUC 450 tons · Chiller ×8
1 project · most recent 05/20/2024
FiledStatusContractorScope
05/20/2024Signed-offRael Automatic Sprinkler Co9,919 heads, 1 outlets
18 projects · most recent 11/11/2025
General Wiring
FiledStatusContractorScope
11/11/2025CompleteRoma Electric1 meters, 1 new_meters
11/11/2025Permit IssuedRoma ElectricGeneral Wiring
09/19/2025CompleteTeam ElectricGeneral Wiring
09/16/2025CompleteTuxedo Electrical Contracting—
05/01/2025CompleteRoma ElectricGeneral Wiring
03/05/2025CompleteTeam ElectricGeneral Wiring
10/15/2024CompleteFSG ElectricGeneral Wiring
01/10/2024CompleteLive Wire Electric 1—
03/10/2023CompleteTuxedo Electrical Contracting—
11/04/2022CompleteTuxedo Electrical Contracting—
10/19/2022CompleteTuxedo Electrical Contracting—
10/19/2022CompleteTuxedo Electrical Contracting—
10/19/2022CompleteTuxedo Electrical Contracting—
10/19/2022CompleteTuxedo Electrical Contracting—
08/16/2022CompleteTuxedo Electrical Contracting—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/05/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
05/13/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/18/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/16/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
01/26/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/23/2022Pass-Final PL - UndergroundPassView ↗
04/27/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/28/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 138
DateRequirementInspectorRole
12/16/2025HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
12/16/2025Interior lighting powerChristopher O'Malleyenergy_progress
12/16/2025Emergency and Standby Power Systems (Generator)Christopher O'Malleyspecial
12/16/2025FinalChristopher O'Malleyprogress
12/16/2025Energy Code Compliance InspectionsChristopher O'Malleyprogress
12/16/2025Duct leakage testing, insulation and designChristopher O'Malleyenergy_progress
12/16/2025HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
12/16/2025Shutoff dampersChristopher O'Malleyenergy_progress
12/16/2025Maintenance informationChristopher O'Malleyenergy_progress
12/16/2025Lighting controlsChristopher O'Malleyenergy_progress
12/16/2025Heating SystemsChristopher O'Malleyspecial
12/16/2025Mechanical SystemsChristopher O'Malleyspecial
12/16/2025Smoke Control Systems TestingChristopher O'Malleyspecial
12/16/2025Exterior lighting powerChristopher O'Malleyenergy_progress
12/16/2025MeteringChristopher O'Malleyenergy_progress
12/16/2025Electrical motors and elevatorsChristopher O'Malleyenergy_progress
12/16/2025HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
11/10/2025Heating SystemsChristopher O'Malleyspecial
11/10/2025Maintenance informationChristopher O'Malleyenergy_progress
11/10/2025HVAC-R and service water piping design and insulationChristopher O'Malleyenergy_progress
11/10/2025Exterior lighting powerChristopher O'Malleyenergy_progress
11/10/2025HVAC-R and service water heating equipmentChristopher O'Malleyenergy_progress
11/10/2025Duct leakage testing, insulation and designChristopher O'Malleyenergy_progress
11/10/2025Electrical motors and elevatorsChristopher O'Malleyenergy_progress
11/10/2025HVAC-R and service water heating system controlsChristopher O'Malleyenergy_progress
Latest 25 of 138.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Wildflower StudiosArts / Culture / EntertainmentEntire building
Project Q01308994 Alteration · Permit Entire · 10/31/2025
Project Q01309208 Alteration · Permit Entire · 10/30/2025
Project Q01309210 Alteration · Permit Entire · 10/30/2025
Project Q01309212 Alteration · Approved · 10/30/2025
Project Q01043993 Alteration · LOC Issued · 05/07/2024
Project Q01044453 Alteration · LOC Issued · 05/07/2024
Project Q01014233 Alteration · LOC Issued · 03/28/2024
Project Q00924435 Alteration · Filing Withdrawn · 08/24/2023
Project Q00644019 Alteration · Permit Entire · 01/19/2022
Project Q00656576 Alteration · LOC Issued · 01/19/2022
Project Q00633564 Alteration · LOC Issued · 11/18/2021
Project Q00396446 Alteration · LOC Issued · 09/15/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 577 on file (BIS + DOB NOW)
▸Plans & Drawings56
▸DOB NOWPlans/Sketch37
08/27/2026Q00620613-I1Request digital key ↗
08/26/2026Q00644019-I1Request digital key ↗
08/26/2026Q00633564-P4Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler6
08/28/2026Q00348844-I1Request digital key ↗
08/28/2026Q00348836-I1Request digital key ↗
08/28/2026Q00360126-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly4
08/17/2026Q01377490-I1Request digital key ↗
08/16/2026Q01402543-I1Request digital key ↗
08/16/2026Q01402936-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
08/28/2026Q00317120-I1Request digital key ↗
08/27/2026Q00444260-I1Request digital key ↗
08/15/2026Q00317120-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/22/2026Q00396446-P1Request digital key ↗
08/22/2026Q00396446-P2Request digital key ↗
08/15/2026Q00396446-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/28/2026Q00396341-P1Request digital key ↗
08/14/2026Q00396341-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/23/2026Q00989155-I1Request digital key ↗
▸Applications & Permits77
▸BISPLAN / WORK APPROVAL APPLICATION58
12/24/2025420667549Open ↗
12/01/2025440608237Open ↗
12/01/2025440635494Open ↗
Showing 3 of 58 on file for this type
▸BISWORK PERMIT APPLICATION19
07/15/2025420667549Open ↗
04/23/2024440629544Open ↗
04/11/2024440635494Open ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISFLOOD ZONE COMPLIANCE2
10/25/2024440783065Open ↗
06/28/2024420667549Open ↗
▸BISVERIFY TAX LOT2
01/22/2025420667549Open ↗
01/22/2025420667549Open ↗
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications122
▸DOB NOWDPL-1: Design Professional Seal & Signature53
08/28/2026Q00317120-I1Open ↗
08/28/2026Q00317120-P1Open ↗
08/28/2026Q00360126-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature34
10/12/2026Q01309208-I1Open ↗
10/12/2026Q01309208-I1Open ↗
09/29/2026Q00348836-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/12/2026Q01309208-I1Open ↗
10/12/2026Q01309208-I1Open ↗
09/23/2026Q00960596-S2Open ↗
Showing 3 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/07/2023440783065Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment2
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION2
07/08/2024420667549Open ↗
07/08/2024420667549Open ↗
▸Safety & Tenant Protection15
▸BISSTREET TREE CHECKLIST3
05/14/2024440608237Open ↗
Showing 1 of 3 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN2
04/08/2025420667549Open ↗
01/23/2025440608237Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
06/13/2024420667549Open ↗
05/30/2024440635494Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF2
01/23/2025440608237Open ↗
01/02/2025420667549Open ↗
▸Environmental & Asbestos39
▸DOB NOWOER: Notice to Proceed18
08/26/2026Q00633564-I1Open ↗
08/23/2026Q00942173-I1Open ↗
08/18/2026Q00960596-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice of Satisfaction9
08/26/2026Q00633564-I1Open ↗
08/13/2026Q00892681-I1Open ↗
08/13/2026Q01002767-I1Open ↗
Showing 3 of 9 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION5
05/14/2025440709967Open ↗
02/05/2025420667549Open ↗
10/25/2024440783065Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
06/07/2023440783065Open ↗
Showing 1 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
04/03/2025440783065Open ↗
05/21/2024420667549Open ↗
05/09/2024440629544Open ↗
Showing 3 of 11 on file for this type
▸BISFENESTRATION AIR LEAKAGE2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISFENESTRATION AREAS2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISAIR SEALING AND INSULATION - TESTING2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/24/2024420667549Open ↗
06/27/2024440629544Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00942173-I1Open ↗
08/13/2026Q00960596-I1Open ↗
▸Inspections & Test Reports49
▸BISTECHNICAL REPORT: RESPONSIBILITY31
04/03/2025440783065Open ↗
05/29/2024420667549Open ↗
05/22/2024420667549Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
11/03/2023420667549Open ↗
08/04/2022420667549Open ↗
Showing 2 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS2
10/25/2024440783065Open ↗
05/30/2024440635494Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/25/2024440783065Open ↗
06/28/2024420667549Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP2
06/13/2024420667549Open ↗
05/30/2024440635494Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
06/28/2024420667549Open ↗
▸BISDEEP FOUNDATIONS / PILES1
04/04/2023420667549Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
04/04/2023420667549Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026Q00892681-I1Open ↗
▸Approvals, Objections & Sign-offs58
▸BISLETTERS - SUPPORTING DOCUMENTATION29
11/01/2023420667549Open ↗
11/22/2022420667549Open ↗
10/27/2022420667549Open ↗
Showing 3 of 29 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
12/03/2024420667549Open ↗
05/24/2024420667549Open ↗
03/15/2024420667549Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
05/15/2025440709967Open ↗
04/04/2025440783065Open ↗
07/08/2024440629544Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL5
06/28/2024440629544Open ↗
05/30/2024440635494Open ↗
02/13/2024440728606Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
04/11/2024420667549Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership22
▸BISCOST AFFIDAVIT11
04/03/2025440783065Open ↗
07/18/2023440783065Open ↗
Showing 2 of 11 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
07/16/2025420667549Open ↗
Showing 1 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/05/2024440629544Open ↗
07/05/2024440635494Open ↗
07/05/2024440635494Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION22
06/25/2025440608237Open ↗
09/03/2024420667549Open ↗
05/15/2024440608237Open ↗
Showing 3 of 22 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/07/2023440783065Open ↗
Showing 1 of 7 on file for this type
▸BISEFILING COVER SHEET5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISBOROUGH INTAKE FORM5
10/27/2022420667549Open ↗
Showing 1 of 5 on file for this type
▸Other Documents17
▸BISBPP - SUPPORTING DOCUMENTATION3
02/13/2025440608237Open ↗
05/15/2024440608237Open ↗
05/14/2024440608237Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)2
07/17/2025420667549Open ↗
07/08/2024440629544Open ↗
▸BISAIR BARRIER CONTINUITY PLAN2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISVESTIBULES2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION2
06/11/2024420667549Open ↗
06/11/2024420667549Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/13/2025440608237Open ↗
▸BISBPP-DEP: INSTALL/MODIFY DRAINAGE STRUCTURE1
07/01/2025440608237Open ↗
▸BISBPP-DOT: RELOCATE STREET LIGHT1
02/13/2025440608237Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00396446-I1Open ↗